This Solicitation opportunity from California was posted on March 1, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Attachment N: County Networked Building Automation System Requirements: Dated 17 March 2021, this document outlines the technical requirements for the County of San Diego's networked Building Automation System (BAS). It specifies the use of BACnet protocols, BTL-tested devices, and detailed integration requirements for HVAC, lighting, and utility metering (electrical, gas, and water). It includes specific hardware standards for JACE equipment, VRF HVAC systems, and Niagara 4 framework integration, as well as requirements for local workstation hardware and Demand Response programming.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment O - County Sustainability Requirements: Dated 22 March 2021, this document outlines the sustainability requirements for County facility remodel and expansion projects. It mandates LEED Gold certification and zero net energy performance, requiring the A/E team to provide energy, daylight, and renewable energy modeling. It also specifies the required qualifications and experience for the General Contractor, Architect, Mechanical, and Electrical teams regarding high-efficiency design and Building Automation System (BAS) integration.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Julian and Rancho San Diego Libraries Expansion - Draft Agreement: A draft Construction Manager at Risk (CMAR) agreement between the County of San Diego and a contractor for the Julian and Rancho San Diego Libraries Expansion. The document outlines a two-phase approach (Pre-Construction and Construction), payment structures including a Budget Not-To-Exceed (NTE), contract timelines, and liquidated damages. It includes references to RFP 11464 and various exhibits such as bonds and insurance requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Julian and Rancho San Diego Libraries Expansion Project - Preliminary Schedule: Attachment D provides the proposed preliminary project schedule for the Julian and Rancho San Diego Libraries Expansion Project, dated February 14, 2022. It outlines key milestones including Design & Permitting, CMAR Procurement, Preconstruction Services, and Construction phases for both locations, with a final project completion date of August 11, 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Julian County Library Addition - Drawings (Project 202110): Schematic design plan and technical specifications for the Julian County Library Addition located at 1850 Highway 78, Julian, CA. The document includes project data, governing building codes (2019 California codes), scope of work regarding demolition and reconstruction, and detailed landscape and irrigation notes. Marked as 'NOT FOR CONSTRUCTION'.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Julian Library Expansion - Asbestos and Lead Survey Reports: A June 23, 2005, limited asbestos and lead survey report for the Julian Library (1850 Highway 78). The document details testing of ceiling tiles, drywall, and painted surfaces. Results indicate no asbestos-containing materials (ACMs) were found in sampled areas and no high concentrations of lead-based paint (LBP) were detected. It provides recommendations for project managers regarding the disturbance of materials and Cal/OSHA compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Julian Library Expansion - Feasibility Level Cost Estimate: Feasibility level cost estimate dated January 21, 2022, for the Julian Library Expansion in San Diego, CA. The document provides a detailed cost breakdown for renovation, west building addition, site work, and parking lot repaving, totaling $3,764,766. It includes specific line-item estimates for demolition, finishes, and electrical work, based on a Construction Manager at Risk delivery method and prevailing wage labor rates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Julian Library Expansion Project - Pre-Work Asbestos and Lead Survey: A pre-work environmental survey report dated March 10, 2022, for the Julian Library Expansion Project. The report confirms all sampled materials tested negative for asbestos but identified high concentrations of lead in a white erase board frame in the Community Room. It provides critical recommendations for contractor safety, Cal/OSHA compliance, and site monitoring, and specifies that the document should be included in the bid proposal package.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Julian Library Expansion - Record Drawings: Technical record drawings and specifications for the Julian Library Expansion project. The document includes detailed engineering data such as pavement repair sections, catch basin configurations, roof and foundation plans, electrical/communication floor plans, and mechanical equipment schedules.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rancho San Diego County Library Expansion - Schematic Design Drawings: Schematic design drawings dated 02/11/22 for the Rancho San Diego County Library expansion project located at 11555 Via Rancho, El Cajon, CA. The documents were produced by Partere Site Planning Landscape Architecture and are marked 'NOT FOR CONSTRUCTION'.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rancho San Diego Library Asbestos and Lead Survey Report: Dated September 1, 2005, this inter-departmental memorandum and accompanying bulk sample report details a selective asbestos and lead-based paint (LBP) survey of the Rancho San Diego Library. The survey found no asbestos in ceiling tiles or drywall and no high concentrations of lead in painted surfaces. It provides critical technical guidance and recommendations for project managers regarding the disturbance of materials during remodeling projects to ensure compliance with Cal/OSHA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rancho San Diego Library Expansion - Feasibility Level Cost Estimate: A feasibility level cost estimate dated January 21, 2022, for the Rancho San Diego Library Expansion project (OCMI Job #: 180012.041). The document provides a detailed breakdown of construction costs totaling $790,460, including renovation of the workroom area, site work, and 'Friends of the Library' sections. It outlines direct costs, general markups (contingencies, escalation, and overhead), and specific line-item estimates for demolition, finishes, and furnishings based on a Construction Manager at Risk (CMAR) delivery method.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rancho San Diego Library Pre-Work Asbestos/Lead Survey: A pre-work asbestos and lead survey report dated March 7, 2022, for the Rancho San Diego Library in El Cajon, CA. The document provides results from sampling conducted on March 1, 2022, to support future renovation of the friends of the library store. Findings indicate that no asbestos was detected in the analyzed materials and no high concentrations of lead-based paint were found, though contractors are advised to follow Cal/OSHA requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rancho San Diego Library Record Drawings: Technical record drawings for the Rancho San Diego Library, including domestic water and waste and vent diagrams. These documents provide critical infrastructure specifications and layout details for the facility.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 11464 Addendum No. 1 - Julian and Rancho San Diego Libraries Expansion: Addendum No. 1 dated March 7, 2022, for RFP 11464 regarding Construction Manager-at-Risk services for the Julian and Rancho San Diego Libraries Expansion. This document revises the Pre-Proposal Conference date to March 10 at 10:00 a.m. via Microsoft Teams and announces a non-mandatory site walk on March 11 at the Julian Library.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 11464 Addendum No. 2 - Julian and Rancho San Diego Libraries Expansion: Addendum No. 2 dated March 23, 2022, for the County of San Diego RFP 11464 regarding Construction Manager-at-Risk services for the Julian and Rancho San Diego Libraries Expansion. This document notifies bidders of two new attachments posted to BuyNet: the DEH Haz Mat Reports for both the Julian and Rancho San Diego Libraries.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 11464 Addendum No. 3 - Julian and Rancho San Diego Libraries Expansion: Addendum No. 3 dated April 7, 2022, for the County of San Diego RFP 11464 regarding Construction Manager-at-Risk services for the Julian and Rancho San Diego Libraries Expansion. This amendment revises the proposal due date to April 15, 2022, prior to 3:00 p.m.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 11464 Addendum No. 4 - Julian and Rancho San Diego Libraries Expansion: Addendum No. 4 dated April 12, 2022, for the County of San Diego RFP 11464 regarding Construction Manager-at-Risk (CMAR) services for the Julian and Rancho San Diego Libraries Expansion. This document provides clarifications via a Q&A section concerning jobsite temporary facilities (security services) and the handling of subcontractor bonds and insurance premiums.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 11464 Attachment B - Scope of Preconstruction Services: Attachment B to RFP 11464 for the County of San Diego Department of General Services. This document outlines the Scope of Preconstruction Services for a Construction Manager-at-Risk (CMAR) project regarding the Julian and Rancho San Diego Libraries Expansion, including a matrix of deliverables across design phases and the required components of the Guaranteed Maximum Price (GMP) package.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 11464 Attachment C - Division of Cost: Attachment C of RFP 11464 for the County of San Diego Department of General Services. This document outlines the Division of Costs for a Construction Manager-at-Risk (CMAR) project regarding the Julian and Rancho San Diego Libraries Expansion, specifying how costs for jobsite staff, work, temporary facilities, and utilities are allocated between direct pass-through costs, contractor fees, and owner payments.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 11464: Julian and Rancho San Diego Libraries Expansion CMAR: Issued March 1, 2022, by the County of San Diego Department of General Services, this Request for Proposals (RFP) seeks a Construction Manager at Risk (CMAR) for the preconstruction and construction phases of the Julian and Rancho San Diego Libraries Expansion. The project involves adding a community room at the Julian Library (budget not to exceed $4M) and space for Friends of the Library operations at the Rancho San Diego Library (budget not to exceed $850K). The solicitation includes a schedule with a proposal deadline of April 8, 2022, and specifies a CMAR delivery method with a Guaranteed Maximum Price (GMP).
PDF
PDF, Low priorityspecifications
LowAI Summary for Chapter 2: Light Pollution Ordinance: This document outlines the purpose, general requirements, and definitions for a county light pollution ordinance. It establishes lighting zones to protect astronomical research and the night environment, providing technical definitions for lighting classes, luminaires, and shielding requirements.
PDF
PDF, Low priorityother
LowAI Summary for RFP 11464 - Job-Walk Sign-In Sheet: A sign-in sheet from a job-walk conducted on March 11, 2022, for the County of San Diego RFP 11464 regarding Construction Manager-at-Risk services for the Julian and Rancho San Diego Libraries expansions. The document lists attendees, including county staff and industry representatives.
TXT
TXT, Low priority1 page · special-notice
LowAI Summary for RFP 11464 - Notice of Intent to Award (Julian and Rancho San Diego Libraries Expansion): Notice of Intent to Award issued by the County of San Diego Department of General Services on May 25, 2022, for RFP 11464. The document announces the intent to award the contract for a Construction Manager-at-Risk with a Guaranteed Maximum Price for the Julian and Rancho San Diego Libraries Expansion to Nielsen Construction California, Inc., subject to successful negotiations.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Nov 8, 2019 to Apr 15, 2022. The notice title changed. NAICS code changed from 424210 to 236220. The notice description changed. The point of contact changed.