Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

RFP 2026-0003: Fire Hydrant Inspection & Testing Services

Active
6aa865a3706904b014e5951bState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Cedar Hill is seeking a qualified contractor to perform professional fire hydrant inspection, maintenance, and testing for Fiscal Year 2027, with all work to be completed by September 30, 2027. The scope includes the inspection and maintenance of approximately 2,100 hydrants and the execution of approximately 540 NFPA 291 fire flow tests. All services must be performed between 0700 and 1900 hours in accordance with NFPA 291 and AWWA M17 standards. The contractor is responsible for providing all necessary personnel, equipment, and digital data collection tools, with all results and deficiency reports entered into the Sure Flow Hydrant Records Management Database. Key requirements include the use of controlled exercising tools to prevent water hammer and the implementation of strict safety and traffic control measures. The contractor must provide proof of insurance and bonding, including Commercial General Liability and Workers Compensation. Payment is structured as 50 percent upon 50 percent project completion and the remaining balance upon final acceptance of all deliverables, including final reports and data exports. Major repairs, replacements, and excavation work are specifically excluded from this scope of work.

General Info

Cedar Hill seeks a contractor for 2,100 hydrant inspections and 540 flow tests.

Agency

Texas → Fire DeptView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

Cedar Hill, TX, 75104, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Fire Dept
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → Fire Dept
View Agency Profile
Office AddressN/A

Full Description

Show more
Section 2 – Scope of Work BID SPECIFICATIONS 1.Purpose The purpose of this specification is to establish minimum requirements for professional fire hydrant inspection, maintenance, controlled hydrant exercising, digital hydrant record documentation, and NFPA 291 fire flow testing for the City of Cedar Hill. The selected contractor shall provide qualified personnel, proper equipment, data collection tools, reporting, safety measures, and all the necessary labor to complete the work in a safe, professional, and documented manner. 2.Project Quantities and Contract Term •Fire Hydrant Inspection and Maintenance: approximately 2,100 hydrants • NFPA 291 Fire Flow Tests: approximately 540 fire flow tests All work shall be completed during Fiscal Year 2027, beginning upon awarded contract and purchase order,and ending no later than September 30, 2027, unless otherwise authorized in writing by the City. 3.Work Hours All hydrant inspection, maintenance, exercising, and flow testing work shall be performed between 0700 and 1900. Work outside this time window requires prior written approval from the City. 4.Applicable Standards and Guidance All work shall be performed in accordance with applicable industry standards, manufacturer recommendations, City requirements, and accepted water utility practices, including: •NFPA 291 - Recommended Practice for Water Flow Testing and Marking of Hydrants •AWWA M17 - Fire Hydrants: Installation, Field Testing, and Maintenance •Applicable OSHA, traffic control, and public right-of-way safety requirements •Applicable City of Cedar Hill procedures and operational requirements Where conflicts exist, the contractor shall notify the City and follow the direction of the City's authorized representative. 5.Contractor Qualifications, Insurance, and Bonding At a minimum, the contractor shall provide equipment capable of controlled hydrant exercising, digital data collection capability, proof of insurance, and required bonding documentation prior to beginning work. Insurance coverage shall be acceptable to the City and may include Commercial General Liability, Automobile Liability, Workers' Compensation, and any additional coverage or endorsements required by the City. Fire Hydrant Inspection and Testing Services 6. Controlled Hydrant Exercising and Operation Requirements The contractor shall use controlled hydrant exercising tools for hydrant operation. Hydrants shall be opened and closed gradually to reduce the risk of water hammer, operating nut damage, stem damage, valve damage, or distribution system disturbance. Uncontrolled impact tools, excessive force, or improper operation methods shall not be permitted. If a hydrant is difficult to operate, damaged, obstructed, or otherwise unsafe to operate, the contractor shall stop working on that hydrant and notify the City. 7. Fire Hydrant Inspection and Maintenance Scope Each hydrant included in the inspection and maintenance scope shall receive a field inspection and maintenance check, including, at minimum: •Locate and positively identify the hydrant; verify accessibility, visibility, and approach conditions •Inspect for external damage, leakage, obstruction, burial, vegetation, access restrictions, and general condition •Inspect caps, cap chains, operating nuts, nozzle threads, nozzles, barrel, flange, and breakaway components where visible •Exercise the hydrant using controlled hydrant exercising tools; confirm operation, full shutoff, and residual leakage status •Flush as appropriate and as directed by the City; check drainage condition where practical •Clean and lubricate caps, threads, and operating components as appropriate; reinstall caps securely •Document deficiencies and record hydrant condition in the hydrant records management database 8. Hydrant Deficiency Documentation The contractor shall document deficiencies clearly and consistently, including inoperable hydrants, difficult operation, failure to fully open or close, drainage issues, leaks, damaged or missing components, damaged threads, buried or obstructed hydrants, poor visibility, access restrictions, collision damage, coating issues, traffic or site hazards, and other conditions requiring City review. Deficiencies shall be entered digitally and shall include notes and photographs where applicable. 9. NFPA 291 Fire Flow Testing Scope The contractor shall perform approximately 540 NFPA 291 fire flow tests in accordance with accepted NFPA 291 fire flow testing practices and City direction. Each fire flow test shall include, at minimum: •Coordination with City staff prior to testing •Selection of test hydrant and residual hydrant locations as approved or directed by the City •Measurement and documentation of static pressure, residual pressure, pitot pressure, outlet size, hydrant configuration, and number of outlets flowed •Calculation of observed flow and available fire flow at the City-required residual pressure, if requested •Controlled opening and closing of hydrants and use of diffusers or discharge control devices where required •Documentation of flow test location, results, and digital entry into the hydrant records management database Flow testing shall be performed in a manner that minimizes risk of water hammer, property damage, erosion, unsafe discharge, or disruption to the public. Fire Hydrant Inspection and Testing Services 10. Hydrant Records Management Database and Reporting All hydrant inspection, maintenance, deficiency, and fire flow testing data shall be digitally entered into Sure Flow's Hydrant Records Management Database, unless otherwise directed by the City. The database and final reports shall include applicable hydrant identification, location, GPS coordinates if collected or provided, inspection date, maintenance date, flow test date, hydrant condition, operational status, deficiencies, corrective action recommendations, static pressure, residual pressure, pitot pressure, flow results, available fire flow calculations where applicable, photographs, technician notes, and completion status. The contractor shall provide regular progress updates and a final completion package. Deliverables may include PDF summary reports, Excel or CSV exports, GIS-compatible data exports if required, photo documentation, deficiency reports, NFPA 291 flow test reports, final project summary, and final completion certification. 11. City Coordination The contractor shall coordinate with the City prior to beginning work and throughout the project regarding hydrant inventory, work areas, flow test locations, water system operational restrictions, known problem areas, hydrants that should not be operated, and resident, business, or traffic concerns. The contractor shall immediately notify the City of any critical deficiency, inoperable hydrant, severe leak, unsafe condition, or condition requiring immediate City attention. 12. Public Safety, Traffic Control, and Water Discharge The contractor shall conduct work in a safe and professional manner, including safe work zone setup, traffic awareness, appropriate traffic control, high-visibility apparel, and protection of pedestrians, vehicles, public property, private property, and the water distribution system. Hydrant discharge shall be managed safely and directed away from structures, traffic hazards, pedestrians, erosion-prone areas, and sensitive property. Diffusers, hoses, or other discharge control devices shall be used where necessary. Work shall not proceed where traffic or discharge conditions create an unsafe condition. 13. Exclusions Unless specifically included by written agreement, the following work is excluded: major hydrant repair, hydrant replacement, main valve repair, excavation, concrete work, pavement repair, water main repair, parts replacement beyond minor maintenance items, painting unless specifically included, and after-hours emergency response. Excluded work may be quoted separately upon City request. 14. Payment Terms •50% invoiced upon 50% project completion, Net 30 •Remaining balance invoiced after completion, Net 30 Project completion shall be based on completion of the required hydrant inspection, maintenance, fire flow testing, digital data entry, and final reporting requirements, unless otherwise agreed in writing by the City. Fire Hydrant Inspection and Testing Services 15. Acceptance of Work Work shall be considered complete when the required hydrant inspections, maintenance tasks, NFPA 291 fire flow tests, digital data entry, deficiency documentation, final data export, final project summary, and City review comments, if any, have been completed or addressed. The City of Cedar Hill, Texas is an equal opportunity employer and does not discriminate in awarding of contracts or employment of persons because of their race, color, age, national origin, religion, sex, disability, sexual orientation, or any other characteristic protected by law. The City of Cedar Hill, Texas requires companies with which it conducts business to be equal opportunity employers and comply with all applicable federal, state, and municipal laws and regulations regarding contracting and employment practices. It is the policy of the City of Cedar Hill to actively encourage and seek qualified and certified VetHUBs (veteran- & disabled-owned), M/WBEs, DBEs, SBEs and local businesses to participate in all phases of the procurement process. In this effort, the City will take appropriate measures to assure that VetHUBS (veteran- & disabled-owned), M/WBEs, DBEs and SBEs have knowledge of, access, and equal opportunity to compete for the goods and/or services required by the City of Cedar Hill. For professional services, the participation shall include the respondent that demonstrates competence, proposals, and the ability to perform the services for a fair and reasonable price based on the solicitation requirements.

Similar Contracts

Same NAICS industry code

NAICS: 541380
New
Geotechnical and Materials Testing Services for Waterline Replacement Project in Hemet, CA
Solicitation # CIP 5661
Albert A. Webb Associates is seeking qualified small and disadvantaged business firms to serve as subconsultants for the Oakland and Santa Fe Waterline Replacement project (CIP 5661) in Hemet, California. The scope of work involves providing geotechnical and materials inspection and testing services, including compaction testing for roadway subgrade, aggregate base, trench backfill, pipe bedding, and trench bottoms. The selected firm will be responsible for initial sampling, continued testing throughout the estimated 210 construction working days, and the preparation of a certification memorandum signed by a professional engineer to identify any non-complying materials. This project is funded in whole or in part by a U.S. Environmental Protection Agency Community Grant, requiring strict adherence to federal flow-down provisions. Key compliance mandates include the Build America, Buy America Act for domestic preference of materials and the Disadvantaged Business Enterprise requirements under 40 CFR Part 33, including the documentation of six good-faith efforts. Additionally, the subconsultant must comply with California prevailing wage laws, register with the Department of Industrial Relations, and meet specific insurance requirements, including a minimum general liability coverage of 2,000,000 dollars per occurrence. Subcontract award is contingent upon the selection of Albert A. Webb Associates by the City of Hemet.
Albert A. Webb Associates

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 541380
New
Federal
Acoustic Emission Testing Equipment for Coal Mine Roof Safety
Solicitation # 75D301-26-Q-79226
The Centers for Disease Control and Prevention, through the National Institute for Occupational Safety and Health, is seeking to acquire Acoustic Emission testing equipment to support research on underground coal mine roof safety. The requirement consists of a complete and compatible system including a four-channel data acquisition system, signal conditioners with root-mean-square output, multiple sensors for rock and drilling machine application, and all necessary software, licenses, and cables. This is an intended sole-source acquisition to MISTRAS Group, Inc., as market research identified them as the only source capable of providing the integrated system. The equipment must be delivered FOB Destination to the NIOSH Pittsburgh Mining Research Division within 60 calendar days of the award. The solicitation, numbered 75D301-26-Q-79226, is an unrestricted acquisition under NAICS code 541380. Award is contingent upon technical acceptability, fair and reasonable pricing, contractor responsibility, and the submission of an AI Compliance and Risk Management Plan if artificial intelligence is utilized in the performance of the contract. All information and communication technology products must comply with Section 508 accessibility standards. Quotations must be submitted electronically to the contracting office by September 23, 2026, and must include detailed pricing, manufacturer part numbers, and confirmation of the delivery timeline.
CDC Office Of Acquisition Services

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 541380
New
Federal
Shasta Trinity NF Drinking Water Sampling & Testing
Solicitation # 127EAY26Q0136
Solicitation 127EAY26Q0136 is a total small business set-aside under NAICS 541380 for the USDA Forest Service to acquire water quality sampling, testing, notification, and reporting services for potable water systems within the Shasta-Trinity National Forest. The scope of work includes routine bacteriological sampling, repeat sampling, and chemical testing, such as PFAS and nitrates, for year-round and seasonally open administrative sites, including guard stations and rental cabins. The contract is structured as a firm-fixed price requirements contract consisting of a one-year base period and two one-year option periods, with a total duration not to exceed three years, plus a potential six-month extension. Qualified contractors must utilize a laboratory facility with current certifications from the State of California and/or the US EPA. Personnel performing the sampling must hold a minimum level one California distribution system operator certification or possess equivalent specialized experience and education. Quotes are due by September 25, 2026, at 4:30 pm PDT and should be emailed to margaret.forrest@usda.gov. Award decisions will be based on technical acceptability and a determination of whether the proposed price is fair and reasonable. The contractor is required to use the Government's Invoice Processing Platform for payments and must adhere to specific wage determinations for Shasta, Siskiyou, and Trinity counties.
USDA Forest Service

POSTED

1 day ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS