Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rfp 2026-02 East Perry Sewer Outfall Phase Iiia Construction Manager At Risk

Closed
PE-66243-NONST-2026-000000076State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the installation of a GD Membrane Bio-Reactor wastewater treatment plant, including new process facilities, instrumentation and control systems, electrical infrastructure, and administrative support buildings. The scope of work encompasses comprehensive site preparation, grading, paving, fencing, and improvements to the facility access road, as well as the complete demolition and removal of existing infrastructure once the new plant is accepted. The project includes a 12-month operational support period and requires strict adherence to Department of the Interior cybersecurity requirements, ADA and ABA accessibility standards, and union prevailing wage rates. The contract is a firm-fixed-price award with a magnitude of construction exceeding 100 million dollars. The period of performance is scheduled from February 1, 2027, to February 1, 2030, with a total performance duration of 1095 calendar days after the notice to proceed. Award selection will be based on a multi-factor, best-value tradeoff process evaluating technical experience, past performance, and proposed pricing. Offerors must provide performance and payment bonds and identify key personnel, including a Project Manager, Superintendent, and specialists in quality control, safety, and historic preservation. Proposals are submitted in two volumes, with technical evaluations focusing on the relevance of project experience and the contractor's capability to manage a project of this scope and complexity.
Dsc Contracting Services Division

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The City of Perry has issued a request for proposals for the East Perry Sewer Outfall Phase IIIA project, utilizing a construction management at-risk (CMAR) delivery method. The project involves designing and constructing the sewer outfall in two phases, with the selected CMAR firm providing preconstruction services to assist the design engineer in developing detailed, construction-ready plans. During the preconstruction phase, the CMAR firm will collaborate closely with the design team, and once the design reaches 90% completion, it will present a construction schedule and a guaranteed maximum price or fixed price proposal. This proposal will encompass all costs through commissioning, startup, general conditions, overhead, profit, and a negotiated contingency. If the owner and the CMAR firm agree on the price, construction will commence; otherwise, the owner retains the right to terminate negotiations and seek other proposals. The project’s contract size is estimated to range between five million and fifteen million dollars, with the procurement process closing on August 20, 2025. The project is located in Georgia, and interested parties can contact Claire Swaim via email or phone for further details. The evaluation of proposals will follow a best-value selection process, and the owner will ultimately select a proposer to either award the contract or enter negotiations based on the submitted proposals. The process emphasizes collaboration, transparency, and adherence to the specified format and content guidelines outlined in the RFP.

General Info

Agency

Georgia → City of Perry

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

East Perry Sewer Outfall Phase IIIA CMAR RFP No 2026-02

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66243 PERRY, PE-66243-NONST-2026-000000076 to PE-66243-NONST-2026-000000076.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Perry
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Perry
Office AddressN/A

Full Description

Show more
This request for proposals (RFP) for the East Perry Sewer Outfall Phase IIIA (Project) invites Proposals according to the requirements set forth in this RFP, including the format and content guidelines in Section 5. The Proposals will be reviewed and evaluated using a best-value selection process described in Section 6. At completion of the evaluation process, the City of Perry (Owner) will select a Proposer to award, or enter into negotiations for award of, the CMAR Contract [See Attachment F (Draft CMAR Contract)]. The capitalized terms in this RFP have the meanings as first used in the text of this RFP and/or as defined in Attachment A (Definition of Terms). The Project is to be designed and constructed in two phases using the construction management at-risk (CMAR) delivery method. ¿ Preconstruction phase: CMAR Firm will provide preconstruction services (as described in Attachment B, Scope of CMAR Services) to support the Owner¿s chosen Design Engineer in developing the design. During this phase, the Design Engineer will advance the design to the level of completion necessary to define the project and will provide construction-ready documents prior to the initiation of the construction-phase services. When the engineering firm¿s design reaches 90% completion, the CMAR Firm will present a construction schedule and an open-book guaranteed maximum price (GMP) or fixed price proposal to the Owner in accordance with the CMAR contract, which includes the cost of the work through commissioning and start-up, general conditions pricing, overhead and profit either as a percent (%) mark up, and a negotiated contractor contingency. When the Owner and CMAR Firm have agreed on the construction price, the construction-phase services are authorized and initiated. (If the Owner and the CMAR Firm are unable to agree on a price for construction-phase services, the Owner reserves the right to terminate the existing CMAR Contract and begin negotiations with another CMAR firm, or dire

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS