This Solicitation opportunity from Georgia was posted on May 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Rfp 240507-000255
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project has a total budget of $120,000, encompassing all construction costs and CMAR fees, with an estimated completion timeline of approximately eight weeks. The owner retains the authority to modify the budget and schedule at their discretion, and all fees and general conditions will be based on these parameters. The scope of work includes creating new single-user restrooms in the lobby, subdividing an existing instructional support room into a boardroom and conference room, and modifying the admin office wing by removing a restroom, expanding an office, and enlarging the nurse’s office with new interior partitions. Additional tasks involve upgrading the HVAC system with new supplies and returns, constructing two small offices for therapy services, and making minor modifications to existing rooms, including door replacements and electrical wiring adjustments. The project also entails installing new flooring in specific areas, evaluating and modifying the kiln room with new finishes and potentially a ductless mini-split system, adding interior glazing to stained glass windows, and replacing water closets in the main bathroom with wall-hung units. The contract is associated with a solicitation titled Rfp 240507-000255, posted on May 9, 2024, with a response deadline of June 4, 2024. It is managed by the Georgia Charter Educational Foundation for Coweta Charter Academy, located in Georgia. The project falls within the NAICS code 238220, indicating it involves specialty trade contractors. The estimated construction cost ranges from $100,000 to $140,000. A conceptual design plan dated May 2, 2024, is available for reference, and interested proposers can contact Beth Duncan via email or phone for further details.
General Info
Place of Performance
GA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
ANTICIPATED PROJECT SCOPE The work for this project is expected to include the following: 1. Creation of at least two single-user restrooms in the existing lobby (adjacent to the existing restrooms and admin office). 2. Subdivision of Instructional Support Room 129 to create a boardroom and a small conference room, keeping the existing sprinkler riser room in place. 3. Modifications to the layout of the admin office wing, including removal of the existing unisex restroom to create an additional workstation / copy area, expansion of one existing office, addition of an interior partition with a door to create a larger nurse¿s office. 4. Add supplies and returns to the HVAC distribution system in office areas. 5. Creation of two small offices between the existing Instructional Support Office and the Multipurpose Room, to accommodate occupational therapy and speech therapy. 6. Minor modifications to Instructional Support Room 165A (replace out-swinging door and separate electrical device wiring that is connected to the adjacent room). 7. New flooring in the hallway outside the Multipurpose Room and inside the Multipurpose Room. 8. Evaluation of existing kiln room and modifications to interior finishes. Remove existing VCT and install ceramic tile. Evaluate fire sprinkler and HVAC system. Probably add a stand-alone ductless mini-split system to the room. 9. Install interior glazing at stained glass windows (about 16 each). 10. Replace water closets in the main bathroom with wall-hung water closets.
A conceptual design plan dated 5/2/2024 (for reference only) is available upon CMAR registration as a proposer. Actual Construction Documents
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
