This Solicitation opportunity from California was posted on August 24, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Rfp 7044 - Construction Manager At Risk With A Guaranteed Maximum Price For El Cajon Family Resource Center Staff Office Area And Hvac Upgrades Project
Closed
7044State & Local
Submission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
HighAI Summary for EC FRC Facility Renovation Preliminary Schedule: This document is the preliminary schedule for the EC FRC Facility Renovation project. It outlines the timeline and sequence of tasks including CMAR selection, pre-construction, construction phases, commissioning, and closeout activities. The schedule details task durations, baseline start and finish dates, and task dependencies, covering the period from May 2015 through May 2016. Key phases include HVAC upgrades, staff office area upgrades, and functional performance testing.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for RFP 6999 Section C Draft Contract Agreement: This document is a draft contract agreement for RFP 6999, detailing the contractual relationship between the County of San Diego and the Contractor for a specified project. It includes recitals, definitions, and articles outlining the scope of work in two phases: pre-construction services and construction. The contract specifies payment terms, contract timeframes, liquidated damages, compensable delays, and authorization for execution. The document serves as the formal agreement incorporating various contract documents and conditions, establishing the terms for project execution and contractor obligations.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for RFP 6999 Section C Draft General Conditions: This document is the draft of the General Conditions for RFP 6999, detailing the contractual provisions governing the construction project. It includes articles on general provisions, roles and responsibilities of the County and Contractor, contract administration, subcontractors, changes in the work, contract time, payments, protection of persons and property, insurance and bonds, correction of work, termination, statutory requirements, and miscellaneous provisions. Key definitions such as Legal Requirements, Application for Payment, Change Order, Claim, and Contractor's Fee are provided. The document serves as a critical part of the contract outlining the legal and procedural framework for project execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 7044 Addendum 1 - Construction Manager at Risk El Cajon Family Resource Center: This document is Addendum No. 1 to Request for Proposals (RFP) 7044 issued by the County of San Diego for Construction Manager at Risk with a Guaranteed Maximum Price for the El Cajon Family Resource Center Staff Office Area and HVAC Upgrades Project. Dated September 9, 2015, the addendum revises the 'Experience of Firm' section on Page 30, clarifying that the Offeror must have completed or be under contract for at least three comparable projects within the last ten years, all located in the United States. The addendum includes detailed criteria for comparable projects and instructions for submission. Contact information for questions is provided.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 7044 Addendum 2 - Construction Manager at Risk Project Schedule Revision: This document is Addendum No. 2 dated September 14, 2015, for Request for Proposals (RFP) 7044 issued by the County of San Diego Department of Purchasing and Contracting. It revises the original RFP by deleting the entire Section C Preliminary Schedule and replacing it with a revised schedule. The revised schedule details the timeline for the Construction Manager at Risk with a Guaranteed Maximum Price project for the El Cajon Family Resource Center Staff Office Area and HVAC Upgrades. The addendum includes a detailed task schedule with durations, start and finish dates, and dependencies for phases such as CMAR selection, pre-construction, construction, commissioning, and closeout. Contact information for the procurement officer is provided for questions regarding this addendum.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 7044 Construction Manager at Risk El Cajon Family Resource Center HVAC Upgrades: This Request for Proposals (RFP) 7044 issued by the County of San Diego on August 24, 2015, solicits qualified firms to provide Construction Manager at Risk services for the El Cajon Family Resource Center Staff Office Area and HVAC Upgrades project. The project involves renovations including office space improvements, HVAC system replacement, asbestos abatement coordination, and construction of new exterior features. The contract includes a preconstruction phase to develop a Guaranteed Maximum Price (GMP) not to exceed $3,000,000, with an optional construction phase. Proposals are due by September 22, 2015, with a pre-proposal conference held on August 31, 2015. The RFP includes detailed instructions for submission, evaluation criteria, and contractual requirements.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 7044 Pre-Proposal Conference Slides Aug 31 2015: This document contains the pre-proposal conference slides for Request for Proposal (RFP) 7044 dated August 31, 2015, for the Construction Management at Risk project with a Guaranteed Maximum Price (GMP) for the El Cajon Family Resource Center staff office area and HVAC upgrades. It provides an overview of the project, solicitation process, schedule, proposal submission instructions, evaluation criteria, and contact information. Key details include a GMP not to exceed $3,000,000, bonding requirements, proposal due date of September 22, 2015, and instructions for submitting questions and addenda. The document aims to guide potential offerors through the solicitation and proposal process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 7044 Section C Construction Documents: This document is part of the RFP 7044 package, specifically Section C, containing construction documents. It includes mechanical diagrams such as chilled water flow, heating hot water flow, and control diagrams, along with a sheet index and symbols and abbreviations. The document is intended to provide detailed technical specifications for the construction project, supporting the solicitation process.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 7044 Section C - Division of Costs: This document is Section C of Request for Proposals (RFP) 7044, titled 'Division of Costs.' It outlines the allocation of direct pass-through costs, contractor's fees, and owner-paid costs for various categories including project jobsite staff, cost of the work, job site temporary facilities, and general requirements such as temporary utilities and cleaning. The document includes detailed tables specifying which costs fall under direct pass-through, contractor's general conditions, contractor's fee, or are paid by the owner. This section is critical for understanding the financial responsibilities and cost divisions related to the scope of services and any change orders for the project.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 7044 Section C - Insurance and Bonding Requirements: This document is Section C of Request for Proposals (RFP) 7044, detailing insurance and bonding requirements for contractors. It specifies the types and minimum limits of insurance coverage contractors must maintain during the contract term, including Commercial General Liability, Automobile Liability, Workers' Compensation, Professional Errors and Omissions Liability, and Builder's Risk insurance. The document outlines coverage scope, minimum liability limits, deductibles, self-insured retentions, and additional insurance provisions such as additional insured endorsements, primary insurance endorsements, notice of cancellation, severability of interest, and loss payee clauses. The insurance requirements ensure protection against claims arising from contractor operations and compliance with County of San Diego standards.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 7044 Section C Scope of Preconstruction Services: This document is a Request for Proposals (RFP) 7044, Section C, detailing the scope of preconstruction services. It outlines tasks such as collaboration with County representatives and Architect/Engineer, preparation of construction cost estimates, schedules, investigation of existing conditions, risk identification, constructability review, and preparation of a Guaranteed Maximum Price (GMP) package. The GMP package includes a signed cover letter, GMP, list of subcontractors and contract values, preconstruction services, contractor's fee, general conditions, allowances, contingencies, construction schedule, jobsite staff identification, and other related components. The document serves as a critical part of the solicitation process for preconstruction services.
TXT
TXT
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.