This Government Contract opportunity from California was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RFQ - LASC - Central Plant Improvements - Phase 2, Infrastructure - Campus-Wide Hydronic Lines Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Los Angeles Southwest College Central Plant Improvements Phase 2 and Infrastructure Campus-Wide Hydronic Lines Replacement project focuses on upgrading mechanical and electrical systems to support current and future campus utility loads. Key objectives include increasing system reliability, capacity, and efficiency, while building redundancy into the plant and improving control systems. A significant portion of the work involves replacing campus-wide hydronic lines to ensure a reliable supply of hot and chilled water, which will include integrating the swimming pool into the central heating system. Additional site improvements include the construction of a 1,074 square foot building and equipment yard secured by new fencing and gates, along with the installation of new electrical and telecommunications services. The scope of work encompasses site preparation, excavation, system connections, and site restoration, all while adhering to LACCD sustainability standards and minimizing campus disruptions. This solicitation, numbered CS-25-12-S, was posted on September 26, 2025, with a response deadline of November 7, 2025.
General Info
Place of Performance
See Zoom Details in the Documents Tab., CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
- Water Pump ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Also, the project includes the replacement of the existing campus-wide hydronic lines to ensure adequate, efficient, and reliable hot and chilled water supply throughout the campus.
In summary, the project’s goals are as follows: • The enhanced system will increase the plant and campus hydronic distribution system reliability and capacity. • Build redundancy into the plant. • Increase efficiency of the plant. • Improve control systems at a building and system level. • A new fence and gates around the East and South side of the site will also be installed around the newly configured small building (1,074 SF) and equipment yard. A new telecommunications and electrical services will be installed into the new building. • Site preparation, excavation, installation of new hydronic lines, connection to existing building systems, testing, quality assurance, site restoration, and project closeout. Minimizing disruptions to campus activities will be crucial to the success of this project. • Adhere to the LACCD Board of Trustees clean energy and sustainability
Bid Bond: 0.00%
More opportunities from California → Contracts Department of Los Angeles Community College District
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
