RFQ MSP Terminal 1 EMC BP#1 Enabling Work
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Metropolitan Airports Commission is seeking qualifications for Bid Package #1 – Enabling Work for the MSP Terminal 1 Energy Management Center project in Minnesota. This complex civil airside project involves the phased relocation and replacement of utilities beneath the aircraft parking apron at Gates C6-C11, including the relocation of aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits. The scope includes replacing two 12,000-gallon underground fuel storage tanks, relocating electrical and water services, installing new storm sewer piping, and replacing approximately 25,000 square yards of concrete aircraft apron pavement. Additionally, the project requires the installation of a new Passenger Boarding Bridge at C12 with associated foundations and MEP services, all while maintaining airport operations and limiting gate closures to no more than three at a time. The solicitation was posted on November 23, 2026, with a response deadline of December 15, 2026. Construction is anticipated to begin on April 15, 2027. Bidders must register via the TradeTapp by BuildingConnected system and submit their qualifications to JE Dunn Construction. Selection will be based on a combination of qualifications, price, and small business participation, with specific DBE/SBE/WBE goals set between 3-5%. The project mandates the use of prevailing wages and requires all on-site labor to comply with a Project Labor Agreement. There is no specified set-aside status for this solicitation.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
16 mandatory20 requirements in 4 areas
- Technical11 · 10 must010
Fuel Storage Tank Replacement
Contract notice - Submission5 · 3 must001
Prequalification Process
- Compliance3 · 3 must007
Prevailing Wage Requirements
- 17 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 20 requirementsEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Organization & Contact Information
Interested Companies (27)
See All 27 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Minnesota → Metropolitan Airports Commission
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
