Storm Sewer Piping Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Storm Sewer Piping Installation involves the installation of new storm sewer piping for prime contractors on Metropolitan Airports Commission projects at MSP Terminal 1. The scope of work includes the excavation and installation of storm sewer piping systems utilizing specific drainage materials and pipes to deliver a fully installed system. The project is governed by a Project Labor Agreement and requires strict adherence to Prevailing Wage requirements. This opportunity is categorized under NAICS code 238220 and is managed by the Metropolitan Airports Commission in Minnesota. There is no specified set-aside status for this contract.
General Info
Place of Performance
Set-Aside
Documents
This scope was carved out of Solicitation225.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
RFQ MSP Terminal 1 EMC BP#1 Enabling Work
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Read the full solicitation package
This scope is part of a larger contract. Its documents live on the prime.
- 1 document on the prime contractFrom RFQ MSP Terminal 1 EMC BP#1 Enabling Work
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
subcontract
Submission deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Minnesota → Metropolitan Airports Commission
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
