Right-of-Way (ROW) Fencing Contractor

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for a Right-of-Way fencing contractor to support prime contractors on Oregon Department of Transportation projects located in Salem. The scope of work involves the removal of 22,476 linear feet of existing right-of-way fencing and the subsequent installation of 22,476 linear feet of replacement fencing, along with 850 linear feet of Type 2 fencing and one 12-foot single swing gate. All deliverables must be fully functional and strictly adhere to the 2024 Oregon Standard Specifications and Drawings RD810 and RD850. The solicitation was posted on November 5, 2026, with a response deadline of November 19, 2026. Classified under NAICS code 238990, this project requires a contractor capable of meeting specific state transportation standards to ensure the successful delivery of the fencing infrastructure.

General Info

Subcontract for removing and installing 22,476 feet of ODOT right-of-way fencing in Salem.

Place of Performance

Salem, OR, 97301, USA

Set-Aside

NONE

Documents

This scope was carved out of S-73000-00018261.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ESB I5 Albany ROW Fencing

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and installation of right-of-way fencing for prime contractors on Oregon Department of Transportation (ODOT) projects. Removes 22,476 linear feet of existing ROW fence and installs 22,476 linear feet of replacement ROW fence, 850 linear feet of Type 2 fencing, and one 12-foot single swing gate. Work must adhere to 2024 Oregon Standard Specifications and Drawings RD810 and RD850. Delivers fully installed and functional ROW fencing.

Similar Contracts

Same NAICS industry code

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238220
New
SLED
ODOT Bldg. A HVAC Controls Replacement
Solicitation # S-73000-00018356
The Oregon Department of Transportation (ODOT) is soliciting quotes for the design and implementation of a like-for-like Direct Digital Control (DDC) system at Building A in Salem, Oregon. The primary objective is to replace outdated American Auto-Matrix controllers with Automated Logic Systems to improve energy efficiency and simplify operational control. The scope includes replacing GPC1 controllers in the boiler room and specific roof top units, ensuring that Building B can operate independently upon completion. To avoid disrupting building climate control, all work must be performed between 5 PM and 6 AM while maintaining a temperature of 70 degrees plus or minus 2.5 degrees. The contract will be awarded to a single responsible offeror based on price, experience, expertise, product functionality, and suitability for the project. Awardees must be certified as an Emerging Small Business via COBID and commit to performing at least 51 percent of the labor using their own workforce. The project is subject to BOLI prevailing wage requirements and strict safety standards, including compliance with federal and Oregon OSHA regulations. Detailed technical requirements include specific labeling for wiring, pneumatic tubing, and control panels, with equipment meeting MIL-STD 810C for shock and vibration. Contract administration involves monthly invoicing by the 10th of each month, with a 5 percent retainage potentially withheld by the owner. Payments are typically issued within 30 calendar days of receiving a conforming invoice. The contractor must provide a detailed work schedule within one month of the award and submit monthly status reports. Substantial completion is defined by 30 continuous days of successful, trouble-free operation, and failure to meet the substantial completion date will result in liquidated damages. Final acceptance requires the submission of all demonstration checklists and written certification from the engineer.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS