Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

DDC System Design, Programming, and Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Portland, OR, 97209, USA

Set-Aside

NONE

Documents

This scope was carved out of S-73000-00018356.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ODOT Bldg. A HVAC Controls Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs design, configuration, and software integration of Automated Logic Systems DDC networks for prime contractors on ODOT facility projects. Configures high-speed peer-to-peer networks, web-based operator interfaces, and GPC1 controllers for RTUs and boiler rooms. Replicates sequences of operations and migrates points from SAGE systems. Requires ANSI/ASHRAE Standard 135 (BACnet) compliance. Delivers operational DDC system and PICS.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is seeking professional design services for the Etnies Skatepark Improvement Project (25P03) located at 20028 Lake Forest Drive. The selected consultant will refine two preliminary concept designs into a final concept and develop a complete, permit-ready, and bid-ready construction package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to the street lane, plaza, and various bowls, the replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing building renovation project and develop a construction phasing plan that minimizes operational disruptions. The contract is structured on a time and materials, not-to-exceed basis, with monthly invoicing and a 30-day payment term. Award selection is based on a multi-phase evaluation involving mandatory compliance checks, a qualitative proposal review, and a weighted final score consisting of interviews (80 percent) and cost proposals (20 percent). Requirements include the identification of key personnel such as a Project Manager, Lead Skatepark Designer, and Civil Engineering Lead, all of whom must hold necessary California professional licenses. Additionally, the consultant must comply with California prevailing wage laws, register with the Department of Industrial Relations, and ensure all designs meet ADA standards. Proposals are due by December 4, 2026, via the City's eProcurement portal.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details
NAICS: 541330
New
SLED
RFP - Professional Engineering Services - Medford Canal Piping Phase 1.
Solicitation # S-Q10026-00018358
The Medford Irrigation District is seeking professional engineering services for the Medford Canal Piping Phase 1 project, located in the Little Butte Creek watershed in Jackson County, Oregon. The primary objective is to advance a planning-level concept for piping approximately 2.7 miles of the Medford Canal below Bradshaw Drop to a 30 percent preliminary design. The scope of work includes project management, existing information review, topographic and boundary surveying, and geotechnical investigations, with a specific focus on unstable clay slopes and the protection of ESA-listed Southern Oregon/Northern California Coast coho salmon. Deliverables must include a complete 30 percent design package and a planning-level opinion of probable construction costs. This solicitation utilizes a Qualifications-Based Selection process, meaning proposers are strictly prohibited from submitting pricing or fee information within their proposals. Evaluation is based on relevant experience and past performance, the qualifications of key personnel, technical approach, project management capabilities, and proposal quality. To be considered, firms must be Oregon-licensed and submit a single searchable PDF by December 4, 2026, to Jack Friend. Required documentation includes residency statements, non-discrimination certifications, and compliance with Oregon tax laws. The project is funded via an Oregon Watershed Enhancement Board Technical Assistance Grant, and the target date for the Notice to Proceed is December 18, 2026.
Medford Irrigation District

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details

More opportunities from Oregon → Department of Transportation

Same awarding agency

New
SLED
ODOT Bldg. A HVAC Controls Replacement
Solicitation # S-73000-00018356
The Oregon Department of Transportation (ODOT) is soliciting quotes for the design and implementation of a like-for-like Direct Digital Control (DDC) system at Building A in Salem, Oregon. The primary objective is to replace outdated American Auto-Matrix controllers with Automated Logic Systems to improve energy efficiency and simplify operational control. The scope includes replacing GPC1 controllers in the boiler room and specific roof top units, ensuring that Building B can operate independently upon completion. To avoid disrupting building climate control, all work must be performed between 5 PM and 6 AM while maintaining a temperature of 70 degrees plus or minus 2.5 degrees. The contract will be awarded to a single responsible offeror based on price, experience, expertise, product functionality, and suitability for the project. Awardees must be certified as an Emerging Small Business via COBID and commit to performing at least 51 percent of the labor using their own workforce. The project is subject to BOLI prevailing wage requirements and strict safety standards, including compliance with federal and Oregon OSHA regulations. Detailed technical requirements include specific labeling for wiring, pneumatic tubing, and control panels, with equipment meeting MIL-STD 810C for shock and vibration. Contract administration involves monthly invoicing by the 10th of each month, with a 5 percent retainage potentially withheld by the owner. Payments are typically issued within 30 calendar days of receiving a conforming invoice. The contractor must provide a detailed work schedule within one month of the award and submit monthly status reports. Substantial completion is defined by 30 continuous days of successful, trouble-free operation, and failure to meet the substantial completion date will result in liquidated damages. Final acceptance requires the submission of all demonstration checklists and written certification from the engineer.

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details
NAICS: 561720
New
SLED
Janitorial and Grounds Maintenance-Ashland Port of Entry
Solicitation # S-73000-00018289
The Oregon Department of Transportation is soliciting bids for a fixed-price contract to provide janitorial and grounds maintenance services at the Ashland Port of Entry. The scope of work covers 2,673 square feet, including the Truck Inspection Bay and Scale House/Enforcement Office, while specifically excluding the parking lot and safety office. Key deliverables include weekly janitorial services performed on Fridays, quarterly hedge trimming, and annual tree trimming as needed. The contractor must complete all initial cleanup within 30 days of the contract award and maintain a one-hour response time for emergency cleaning services. Performance is measured against specific technical standards, with strict prohibitions against the use of certain abrasives, harsh acid products, and Tucker Poles for window washing. The contract will be awarded to the lowest responsive and responsible bidder, with a 5% price preference applied to goods and services fabricated or processed entirely in Oregon. Bidders must submit their proposals through the OregonBuys eProcurement system, including a completed bid cover sheet and at least three references from the last three years. Compliance requirements are extensive, including adherence to OSHA standards, 29 CFR 1910.1200 for hazard communication, and Title VI non-discrimination provisions. The contractor is responsible for providing Safety Data Sheets for all chemicals used and ensuring personnel undergo security screening to mitigate risks to the facility. Invoicing occurs monthly by the 10th of each month, with payment typically issued within 30 calendar days of receipt.
Janitorial Services

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS