Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

River West Fresno E-pond Habitat Enhancement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The River West Fresno E-pond Habitat Enhancement Project, managed by the San Joaquin River Conservancy, focuses on the revegetation of approximately 23 acres of annual grassland to establish native upland and riparian habitats. This initiative aims to improve habitat connectivity and fulfill the requirements of the WCB Grant Agreement WC-1962HW Work Plan. The project is located in Fresno, California, approximately one mile downstream of the State Route 41 bridge on the south side of the city. Key project activities include the installation of irrigation systems for plant establishment, the implementation of plant protection measures to reduce herbivory, ongoing weed management, and replanting as necessary. The project is classified under NAICS code 115112 and is designated as categorically exempt under Class 4, Section 15304 for minor land alterations, as it involves no significant grading, tree removal, or structural construction. Primary administration is led by Kari Kyler Daniska, Chief Executive Officer of the San Joaquin River Conservancy.

General Info

San Joaquin River Conservancy restores 23 acres of habitat in Fresno via WCB Grant.

Agency

California → San Joaquin River Conservancy

Place of Performance

Fresno, CA, 93711

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin River Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin River Conservancy
Office AddressN/A
Contacts
Kari Kyler DaniskaChief Executive Officer
Sharon WeaverExecutive Director

Full Description

Show more
his project activities are such to fulfill terms of WCB Grant Agreement WC-1962HW Work Plan. This project includes revegetation of annual grassland with upland and riparian plants to create native habitat and improve habitat connectivity on approximately 23 acres of land commonly known as River West Fresno. The actions of the project may involve, but are not limited to, a irrigation system during planting and plant establishment, installation of plant protection to reduce herbivory, weed management, and replanting as needed throughout.

Similar Contracts

Same NAICS industry code

NAICS: 115112
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Utah

POSTED

8 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS