This Subcontract opportunity from Washington was posted on June 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roadway Excavation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

about 23 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

about 23 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to improve roadway structure and pedestrian safety. The scope of work includes removing and reconstructing asphalt concrete pavement using rubberized asphalt concrete, installing ADA access ramps, sidewalks, curb and gutter, and adjusting utility pull-boxes. The project also encompasses the installation of striping, signage, and pavement markings. Work is located on Katella Avenue from Auburn Way to Douglass Road and State College Boulevard from Katella Avenue to Gene Autry Way. The estimated construction cost has been updated to 5,041,243.00 dollars, with a performance period of 70 working days from the Notice to Proceed. The contract is governed by the 2024 Standard Specifications for Public Works Construction and specific project special provisions. Award will be granted to the lowest responsive and responsible bidder holding a General Engineering (A) license. Bidders must be registered with the Department of Industrial Relations and agree to be bound by the Community Workforce Agreement. Key submission requirements include a 10 percent bid bond, a non-collusion declaration, and the use of the OpenGov portal for proposals. Performance is subject to strict scheduling, with work affecting CALTRANS Right-Of-Way restricted to overnight hours between 10:00 p.m. and 5:00 p.m. Monday through Friday. Final payment is contingent upon the approval of As-Built Plans submitted 21 days prior to the final invoice.
Public Works

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety (DPS) has issued Invitation for Bids (IFB) solicitation 405-26R0027374 for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. The project requires a comprehensive remove and replace approach, involving the milling of all existing asphalt surfaces to a minimum depth of 2.5 inches, prepping the area, and installing new asphalt with a minimum finished depth of 2.5 inches compacted to approximately 98 percent. The scope also includes full restriping of the lot, including handicap and fire lane markings, and the removal and resetting of wheel stops. To maintain operational continuity, the contractor must perform work during off-hours and provide a work phasing plan for agency approval. Bids are due electronically by 5:00 P.M. CT on November 13, 2026, via the DPS Online Bid Room or designated email. Responses must be organized into four volumes covering required contract forms, information bid details, a subcontracting plan, and a mandatory pricing schedule. Award decisions will be based on the best value standard, with a significant emphasis on past performance. Key requirements include adherence to Texas Government Code Chapter 2258 prevailing wage rates, the provision of performance and payment bonds for contracts exceeding specific thresholds, and the completion of fingerprint-based criminal history background investigations for personnel. All work must be performed by qualified craft persons with at least three years of field experience and comply with all state and local codes.
Department of Public Safety

POSTED

1 day ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract involves the excavation of 80 cubic yards of earth specifically for roadway stabilization, which includes activities such as trenching and grading. This subcontract, titled "Roadway Excavation," is issued by the Public Works - Roads agency in Washington and falls under the NAICS code 237310, which covers highway, street, and bridge construction. The solicitation was posted on June 6, 2026, and responses are due by June 25, 2026, at 7:15 PM. While no set-aside type or specific organizational details have been indicated, the scope centers on earthwork necessary to support road construction and maintenance. The work is intended to secure and prepare the roadway area by removing and shaping earth materials to proper specifications, ensuring stability and durability for transportation infrastructure. Although specific location details and points of contact are not provided, interested subcontractors may find more information through the procurement portal link. This contract provides a clear opportunity for contractors specializing in excavation and earthmoving services to participate in a public works project in Washington state.

General Info

Excavation of 80 cubic yards earth for Washington roadway stabilization, responses due June 25, 2026.

Documents

This scope was carved out of 90-21F782700026.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Carr Road MP 0.26-0.28 Slide Repair Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works- Roads
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation of 80 cubic yards of earth for roadway stabilization, including trenching and grading.

More opportunities from Washington → Public Works- Roads

Same awarding agency

NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Jones Road MP 1.71 Culvert Replacement Project
Solicitation # 90-21F171900171
The Jones Road MP 1.71 Culvert Replacement Project is a public works initiative managed by the Board of County Commissioners of Lewis County, Washington. The primary scope of work involves improving Jones Road at milepost 1.71 by replacing an existing culvert with a 38-foot long by 33-foot wide pre-stressed slab girder bridge featuring steel pipe abutments. The project also includes related infrastructure improvements such as shoulder finishing, the application of 195 tons of HMA, the installation of beam guardrails, and the implementation of erosion and water pollution control measures. All construction must adhere to the 2021 International Building and Residential Codes, the Washington State Energy Code, the Lewis County Master Site Plan, and WSDOT and City of Centralia standards. Proposals must be submitted by 12:15 p.m. on December 3, 2026, to the Public Works Contract Team in Chehalis, WA. Required submission documents include a bid bond, a non-collusion declaration, certification of wage law compliance, a local agency subcontractor list, and company UBI and UEI numbers. The contract mandates strict quality controls, including hydrostatic pressure testing of pipes at 25 PSI and compaction of backfill to 95 percent density. Payments are to be made via certified check to the Lewis County Treasurer, and the Lewis County Engineer serves as the primary authority for contract alterations.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS