Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on August 3, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rock Berm Construction

Closed
30003974International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 15 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Department of Fisheries and Oceans, through the Small Craft Harbours branch, requires the supply and installation of filter rock, riprap, and filter cloth to construct a new rock berm. The project covers approximately 152 linear meters along the northeastern edge of Steveston Island and is accessible only by water. All in-water activities must be completed by October 31, 2023, and must adhere to the least risk to fish work window for the Fraser River Estuary, which runs from July 16 to February 28. This open tender is subject to a conditional set-aside under the Procurement Strategy for Indigenous Business. If at least two compliant bids are received from certified Indigenous businesses listed in the Indigenous Business Directory, the competition will be limited exclusively to those bidders. Non-Indigenous bids will only be considered if fewer than two compliant bids from certified Indigenous businesses are submitted or remain valid.

General Info

Supply and install rock berm at Steveston Island by October 31, 2023.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Fisheries and Oceans Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Karen DolanPoint of Contact

Full Description

Show more
Small Craft Harbours (SCH) branch of Department Fisheries and Oceans (DFO) has a requirement for a the supply and installation of new filter rock, riprap and filter cloth for a new rock berm. The new rock berm is approximate 152 linear meter in length located along the northeastern edge of Steveston island (Shady island) with marine access only. All in water work, undertakings and activities must be conducted during the least risk to fish work window unless otherwise specified by DFO: Fraser River Estuary (from mouth upstream to Oak Street Bridge and the George Massey Tunnel) between July 16 of any given year and February 28 of the following year. The Contractor shall perform and complete the Work by October 31st 2023. CONDITIONAL SET-ASIDE UNDER THE FEDERAL GOVERNMENT PROCUREMENT STRATEGY FOR INDIGENOUS BUSINESS (PSIB) This is an open tender. However, it will be conditionally set-aside under the Government of Canada’s Procurement Strategy for Indigenous Business (PSIB) if two or more bids have been received by Indigenous businesses who are certified under the Procurement Strategy for Indigenous Business (PSIB) criteria and who may be listed in the Government of Canada’s Indigenous Business Directory (https://www.sac-isc.gc.ca/eng/1100100033057/1610797769658 ). If your Indigenous business is not yet registered in the Indigenous Business Directory, please do so at the link provided above. If bids from two or more Indigenous businesses are compliant with the terms of the Request for Proposal, the contracting authority will limit the competition to those Indigenous businesses and will not consider bids from any non-Indigenous businesses that may have been submitted. If the bids from the Indigenous businesses are found to be non-compliant or non-responsive or are withdrawn, such that fewer than two compliant bids from Indigenous businesses remain, bids from all of the non-Indigenous businesses that had submitted bids will then be considered by the contracting authority.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS