Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Rock Slope Protection Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of Class I, 20 lb rock slope protection using Method B to control erosion on highway slopes, covering a volume of 21 cubic yards. This work is part of a subcontract under the California Department of Transportation and is intended to stabilize slopes along a designated highway segment in Alameda. The material specification requires rock weighing 20 pounds per piece, meeting Class I standards for durability and sizing, and the application must follow Method B, which dictates specific placement techniques to ensure long-term erosion resistance and structural integrity. The solicitation was posted on September 17, 2026, with the same date set as the response deadline, indicating a rapid procurement timeline. The project falls under NAICS code 237120, classifying it as highway and street construction, and is being executed within California’s transportation infrastructure framework, with performance located specifically in the city of Alameda.

General Info

Install 21 cubic yards of Class I 20-lb rock slope protection via Method B in Alameda for Caltrans highway erosion control.

Agency

California Department of TransportationView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Alameda, CA, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of Class I, 20 lb rock slope protection using Method B over 21 cubic yards to prevent erosion on highway slopes.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 237120
New
Federal
4CAB Service Petroleum Oils and Lubricant Shelter Repair
Solicitation # W911RZ26QA032
The contract solicitation W911RZ26QA032, titled “4CAB Service Petroleum Oils and Lubricant Shelter Repair,” is a Firm Fixed Price (FFP) acquisition under the North American Industry Classification System (NAICS) code 237120, with a total small business set-aside as indicated by clause 52.219-6. The work involves comprehensive repair and modernization of petroleum, oil, and lubricant storage shelters at Fort Carson, Colorado, specifically BLDG 9630. Primary tasks include removing and replacing outdated 10kW, 34K BTU electric heaters in Shelters 1 and 2, installing new non-explosion-proof lighting and fan switch kits in all applicable shelters, and providing explosion-proof interior lighting assemblies in Shelters 2 and 3. All work must ensure full operational compliance for safe storage of petroleum products and restore reliable environmental control systems. Work is performance-based, governed by a Performance Work Statement (PWS), and requires strict adherence to Quality Control Plan (QCP) and Quality Assurance Surveillance Plan (QASP) requirements, with 100% compliance mandated for all deliverables. The contract has a 31-day period of performance from August 10 to September 10, 2026, with delivery and acceptance occurring at the destination address in Fort Carson. FOB Destination terms apply, and all equipment must be marked with a Unique Item Identifier (UUI) using a two-dimensional Data Matrix symbol compliant with MIL-STD-130 and ISO/IEC 16022, incorporating enterprise identifier, serial number, and issuing agency code. Shipment and container labeling must follow MIL-STD-129. Proposals must be submitted electronically via email by 10:00 AM MDT on July 31, 2026, and evaluated based on technical capability, schedule adherence, and price without cost analysis, using a best-value trade-off method. Contractors are required to maintain active DOD security clearances, comply with all DoD personnel security standards including DD Form 254 and NISPOM, complete annual cybersecurity training, and meet DoD 8570.01-M certification requirements for IT personnel. Key personnel must be designated, and contractor staff must wear uniforms and proper identification. Invoicing must be performed exclusively through WAWF, and all subcontractor and
W6QM Micc-Ft Carson

POSTED

3 days ago

DEADLINE

in about 12 hours
View Details
NAICS: 237120
New
SLED
California Endangered Species Act Incidental Take Permit No. 2081-2022-064-04 for the eTS 58713.01 Line 85 Milepost 75.85 Remediation Digs Project
Solicitation # 2081-2022-064-04
The California Department of Fish and Wildlife issued an amended Incidental Take Permit to Southern California Gas Company for activities related to the inspection, repair, and integrity enhancement of Line 85 near Milepost 75.85 in Kern County, California. The permit authorizes the incidental take of three state-listed species: the endangered Tipton kangaroo rat, and the threatened San Joaquin antelope squirrel and San Joaquin kit fox, under the California Endangered Species Act. The project involves repairing five pipeline segments, installing cathodic protection systems, constructing a new concrete pad for a cabinet rectifier, rerouting and burying a former gas tap to restore cathodic protection, and expanding Work Area 6 to accommodate additional laydown and parking space. The permit amendment extends the expiration date by six months and adds eighteen months to complete habitat mitigation requirements, while the overall habitat impact remains unchanged, with temporary disturbance to 0.76 acres and permanent impact limited to a negligible 2.67 square feet. All activities occur within existing disturbed areas and previously approved project boundaries, avoiding new habitat conversion. The project is exempt from the California Environmental Quality Act under the categorical exemption for emergency repairs and maintenance. The permit holder must comply with all conditions outlined in the permit, including monitoring, reporting, and mitigation measures, and all actions are subject to oversight by the California Department of Fish and Wildlife’s Central Region based in Fresno. Project coordination is managed by Sarah Bahm and Chloe Phan, who serve as the primary environmental and project contacts, respectively. No federal procurement clauses, pricing details, or contract administration structures are present, as this is a state environmental permit rather than a federal acquisition contract.
Fish and Wildlife, Region 4 - Central, Fresno

POSTED

3 days ago

DEADLINE

N/A
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Temporary Traffic Control SystemThe contract seeks qualified vendors to provide and manage temporary traffic control systems using MASH-compliant barriers and approved traffic control plans, ensuring safety and compliance during roadway operations in California. The work is classified under NAICS code 237310, indicating it falls within the highway and street construction sector, and is structured as a subcontract opportunity issued by the California Department of Transportation. Bidders must adhere to strict technical specifications for barrier deployment and traffic management, with all systems meeting current federal safety standards to protect workers and the traveling public. The solicitation was posted on July 29, 2026, with responses due by August 6, 2026, leaving a limited window for submission. The place of performance is within California, though specific locations are not detailed, implying the work may occur across multiple regions depending on project needs. While no set-aside provisions or organization type restrictions are specified, interested parties must be prepared to demonstrate experience in temporary traffic control, familiarity with Caltrans protocols, and the ability to mobilize and maintain compliant equipment swiftly. All proposals must align with established traffic control plans and ensure continuous compliance throughout the duration of the contracted work.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
Install wildlife exclusionary fencing and outriggers.
Solicitation # 07-1A7204
The California Department of Transportation is soliciting proposals to install wildlife exclusionary fencing and outriggers along Route 101 in Los Angeles and Ventura Counties, with work focused on specific segments LA-101-31.1/38.2 and LA-101-32.8/33.8. The contract has an estimated value of $1,060,000 and requires the installation of 6,520 linear feet of Type CL-12 wildlife fencing, 4,490 linear feet of Type CL-14 wildlife fencing, and 1,100 wildlife outriggers, with a corresponding removal of 7,740 linear feet of existing fencing. The project must be completed by November 16, 2026, and demands strict adherence to Caltrans specifications including the California MUTCD, ASTM standards for materials and testing, and MASH Test Level 2 or 3 requirements for temporary barriers based on roadway speed. Full-scale mock-ups of all fencing installations must be constructed and approved by the Engineer prior to proceeding, and fence layouts must be staked and approved four weeks in advance. Environmental Product Declarations for hot mix asphalt and concrete must be registered in the DIME system, and compliance with Buy America provisions is mandatory. Contractors are required to submit a resource-loaded Critical Path Method schedule and biweekly activity updates, and must promptly pay subcontractors within seven calendar days of receiving progress payments, reporting all such disbursements electronically via Caltrans’s monitoring system. Compliance with reporting obligations for Disabled Veteran Business Enterprises and Small Businesses is mandated, including submission of weekly working days reports and baseline schedules for eligible participation. Packaging and marking requirements include permanent labeling on temporary steel barrier segments with manufacturer name, serial number, lot number, and month/year of manufacture, all centered on the top width and not exceeding six inches in height and twelve inches in length. Inspection and acceptance occur on-site, with the Engineer holding final authority, and all material testing must be performed by SWRCB-ELAP certified laboratories using approved methodologies including ProUCL software for statistical analysis. Payment is processed electronically through Caltrans’s system, with payment terms of seven days for motor carriers and thirty days for material suppliers. No unit prices are provided, and the contract includes no options, extensions, or explicit contract type determination, but operates under federal-aid compliance with no identified solicitation response deadline beyond the posted date of July 29, 202
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 541512
SLED
System Access Credential ManagementThe California Department of Transportation is seeking a subcontractor to provide complete software and hardware access credentials for all installed systems, with a strict requirement that these credentials be delivered no later than 14 days prior to the final completion of the project. This obligation ensures seamless transition and operational readiness upon project closeout, enabling ongoing maintenance, monitoring, and support without delays. The contract falls under NAICS code 541512, indicating it is related to custom computer programming services, and is structured as a subcontract under the agency's procurement process. All necessary access details, including user accounts, authentication keys, system configurations, and security protocols, must be fully documented and handed over in a timely manner to meet the deadline. The solicitation was posted on July 20, 2026, with a response deadline of August 27, 2026, giving potential vendors approximately six weeks to prepare and submit their proposals. There is no specified set-aside status, meaning the contract is open to all qualified entities regardless of size or ownership characteristics. While the exact location of performance is not detailed, the project is managed by the California Department of Transportation, suggesting work will be conducted at various state infrastructure sites across California. Interested parties should reference the official UI link for additional submission guidelines and requirements, though no point of contact information is provided in the data.
Computer Systems Design Services

POSTED

11 days ago

DEADLINE

in 27 days
View Details