Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Rock Slope Protection (RSP) & Erosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Caltrans District 9 in Bishop focuses on the supply and installation of rock slope protection and erosion control for drainage projects. The scope of work includes placing riprap or engineered rock slope protection and installing alternate flared end sections to stabilize culvert ends and stream banks. All operations must strictly comply with CDFW environmental requirements to prevent stream bed degradation. The project falls under NAICS code 238990 and is designed to support prime contractors in delivering stabilized slopes and functional flared end sections. The contract was posted on June 15, 2026, and is managed by the state of California.

General Info

Caltrans District 9 subcontract for rock slope protection and erosion control in Bishop.

Agency

California → Caltrans, District 9 - Bishop

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of Keene Pavement Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 9 - Bishop
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 9 - Bishop
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs rock slope protection for prime contractors on Caltrans drainage projects. Places riprap or engineered rock slope protection (RSP) and installs alternate flared end sections (AFES) to stabilize stream banks and culvert ends. Complies with CDFW environmental requirements to prevent stream bed degradation. Delivers stabilized slopes and installed flared end sections.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Shell Point Tennis/Pickleball Court Resurfacing
Solicitation # 102026
Beaufort County Procurement Services has issued Invitation for Bid IFB 102026 for the inspection, repair, and resurfacing of the tennis and pickleball courts at Shell Point Park in Beaufort, South Carolina. The project is necessitated by safety concerns and structural damage caused by root intrusion. The scope of work includes site preparation, demolition, and the application of a multi-layer sports surfacing system with a specific color scheme of blue in-bounds, light blue non-volley, and green out-of-bounds areas. Additionally, the contractor must install new pickleball net posts, center anchors, and nets for two courts, ensuring all work meets USAPA standard specifications for texture, slip resistance, and dimensional requirements. Bids must be submitted electronically by 2:00 pm on October 20, 2026. The award will be based on a formal sealed bid process, typically favoring the lowest responsive and responsible bidder. Requirements for submission include a bid bond for at least five percent of the total bid, and the awarded contractor must provide performance and payment bonds equal to one hundred percent of the contract amount. The project must be completed within 180 calendar days from the Notice to Proceed. Contractors are required to comply with Title VI of the Civil Rights Act and must provide a Proposed Utilization Plan for Small and Minority Business Enterprise participation unless they are self-performing one hundred percent of the work. Payment is structured monthly at ninety percent of the cost of work in place, subject to approval by the County Representative.
Capital Projects/Facilities

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS