Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on August 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roof Waterproofing and Membrane Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
Aluminum Roofs for Fire Station 7 and Fire Station 9
Solicitation # 2026-27-015
The City of Hialeah, through its Finance Management Purchasing Division, is soliciting quotes for the turnkey design and installation of custom insulated aluminum roof structures at Fire Station 7 and Fire Station 9. The project requires a licensed and insured contractor to provide all labor, materials, and supervision to construct pergola-style all-aluminum frameworks. Key technical specifications include the use of 3-inch insulated aluminum roof panels with a current Miami-Dade County Notice of Acceptance for wind load resistance, matching bronze aluminum fascias, and stainless steel or corrosion-resistant hardware. The contractor is responsible for obtaining all necessary permits, ensuring a 100 percent watertight tie-in to existing buildings, and installing seamless aluminum gutters and downspouts. If existing concrete slabs are insufficient, the contractor must provide compliant concrete footing installation. All work must strictly adhere to the Florida Building Code and High-Velocity Hurricane Zone requirements specific to Miami-Dade County. Final acceptance is contingent upon passing all municipal building inspections, closing the building permit, and a successful final walkthrough by the City Project Manager. Required closeout documentation includes signed and sealed structural engineering as-built drawings, manufacturer warranty certificates, and a one-year workmanship warranty. Responses must be submitted electronically via the City of Hialeah e-Procurement Portal by December 9, 2026, at 11:00 am. Bidders must comply with various legal mandates, including the Cone of Silence, E-Verify employment eligibility, and public entity crime certifications. A bid bond is required for bids exceeding 100,000 dollars, and performance and payment bonds are required for contracts exceeding 200,000 dollars.
Finance Management, Purchasing Division

POSTED

about 18 hours ago

DEADLINE

in 22 days
NAICS: 238160
New
SLED
Roofing Job Order Contracts (JOC 2710 and 2711) - Class C39 License
Solicitation # 2027-RFP-00200
The County of San Mateo Department of Public Works is soliciting proposals for Roofing Job Order Contracts JOC 2710 and 2711 under solicitation 2027-RFP-00200. The agency seeks up to two qualified contractors holding an active Class C39 license to perform roofing repair and refurbishment services across various County-owned facilities. Each contract has a one-year term with a maximum fiscal obligation of 2,000,000 dollars. Compensation is managed through a Job Order system utilizing the Gordian Construction Task Catalog, where pricing is determined by multiplying published unit prices by installation quantities and a contractor-specific Adjustment Factor. Award decisions are based on the lowest responsive and responsible bidder, determined by a weighted Evaluation Criteria Figure. Contractors must adhere to strict regulatory and operational requirements, including a mandatory 1 percent JOC System License Fee paid to Gordian. Financial security is required via a 25,000 dollar bid bond, with performance and payment bonds initially set at 1,000,000 dollars. The agreement mandates compliance with the San Mateo County Project Labor Agreement, Equal Employment Opportunity programs, and ordinances regarding Equal Benefits and Employee Jury Service. Additionally, contractors must follow Ordinance 4099 for the recycling and diversion of construction and demolition debris. Technical performance is governed by CSI Divisions 01-26, with final acceptance contingent upon a County inspection and the submission of all required warranties and documentation.
Public Works - Capital Projects

POSTED

about 20 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Santa Clara Valley Water District is seeking a subcontractor for a roof waterproofing and membrane installation project. The scope of work involves the installation of a 45-mil TPA single-ply membrane on a water treatment plant roof, which includes comprehensive surface preparation, heat-welding of seams, and full integration with existing flashings, drains, and coping. This opportunity was posted on August 26, 2025, and requires responses by the deadline of September 17, 2025. The project falls under NAICS code 238160, focusing on specialized roofing activities to ensure the structural integrity and waterproofing of the facility.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of VW0612.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

STWTP Roof and Gutter Waterproofing

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Firestopping SpecialistOpen now, due in 17 days
  • Thermal & Moisture ProtectionOpen now, due in 17 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install a 45-mil TPA single-ply membrane on the water treatment plant roof, including surface prep, heat-welding seams, and integration with flashings, drains, and coping.

More opportunities from California → Santa Clara Valley Water District

Same awarding agency

NAICS: 237990
New
SLED
Tularcitos Creek Downstream North Hillview Drive Levee RepairThe Tularcitos Creek Downstream North Hillview Drive Levee Repair Project, managed by the Santa Clara Valley Water District, focuses on repairing approximately 2,932 linear feet of the west bank levee in Milpitas, California. The project aims to address erosion and damage caused by rodent burrowing to protect public safety and property. Reconstruction will utilize SMP-2 Method 1A, which involves installing a buried rock buttress to stabilize the channel embankment and provide a stable foundation over saturated soils. The scope of work includes dewatering, the installation and removal of two temporary access ramps, and bank stabilization, with a total temporary disturbance area of approximately 2.7 acres. A key objective is to restore the levee to design elevation to support a Letter of Map Revision and achieve FEMA accreditation. Construction is anticipated to take place from summer to fall 2027. The project is subject to strict environmental compliance under CEQA and NEPA, with specific requirements for equipment emissions. Contractors must use diesel engines meeting U.S. EPA Tier 4 Final standards and CARB-certified Level 3 filters for equipment over 50 horsepower, and haul trucks must be 2010 model year or newer. Additional mandates include the use of electric or alternative-fueled equipment where feasible, strict hazardous material containment protocols, and the performance of nesting bird surveys by a qualified biologist. The project also requires rigorous dust control measures and the submission of all equipment specifications for agency confirmation prior to the start of construction.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS