Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Roofing and Exterior Enclosure

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Victor Valley Community College DistrictView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Victorville, CA, 92395, USA

Set-Aside

NONE

Documents

This scope was carved out of FC-071226A.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Two-Story Instructional Building Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Victor Valley Community College District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Victor Valley Community College District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of roofing systems and building envelope components such as windows and cladding.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
Dormitory Roof Replacement in Iowa
Solicitation # dormitory-roof-replacement-iowa
The Ottumwa Job Corps Center is soliciting bids for a comprehensive roofing system replacement for the Building 7 Dormitory in Ottumwa, Iowa. The project encompasses approximately 16,250 square feet of roofing and 1,600 square feet of parapet wall assemblies. Qualified contractors must evaluate the existing mechanically attached TPO system and propose either a complete tear-off and replacement or a recover roofing system using a fully adhered single-ply EPDM or TPO membrane. The scope of work includes steel roof deck preparation, installation of polyisocyanurate and tapered insulation for positive drainage, high-density cover boards, and the installation of new perimeter edge securement, metal flashing, and coping systems. Additionally, the contractor is responsible for repairing deteriorated sealants and masonry on parapet walls and modifying roof drains, overflow drains, and scuppers as needed to ensure a watertight system. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Award requirements include the use of manufacturer-certified installers and the provision of a minimum 20-year Manufacturer No Dollar Limit (NDL) warranty and a 2-year contractor workmanship warranty. All work must comply with current IBC and ASCE 7 wind design requirements and ANSI/SPRI ES-1 edge securement standards. This project is subject to the Davis-Bacon Act, requiring adherence to prevailing wage determinations and the submission of certified payroll reporting. Proposals must include a detailed construction schedule and an itemized breakdown of labor and materials.
Ottumwa Job Corps

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238160
New
SLED
Digester 4 Roof Repair Project
Solicitation # 20260814015
The Digester 4 Roof Repair Project, solicitation number 20260814015, is a lump-sum fixed-price contract issued by the Sacramento Area Sewer District (EchoWater) for the cleaning, preparation, and repair of the floating cover of Digester 4 at the EchoWater Facility in Elk Grove, California. The scope of work includes repairing deteriorated areas where coatings have been compromised or foam exposed, followed by the application of a spray polyurethane foam and cold fluid applied roof system. The contractor is responsible for all labor, abatement, disposal, equipment, and materials. The contract includes a base bid and a 20,000 dollar allowance for unanticipated site conditions and spare parts. Performance is subject to strict technical and safety standards, including compliance with CalOSHA, UFC, and various ASTM and SMAQMD environmental regulations. Key requirements include maintaining valid California State License Board and DIR registrations, providing a noncollusion declaration, and adhering to CARB regulations for diesel equipment. Materials must be delivered in original manufacturer packaging and stored in enclosed structures. Award decisions are based on price, fitness, quality, and a preference for California-made materials. All project administration, including progress payment requests and technical submittals, is managed electronically through the District's Project Controls System.
Sacramento Area Sewer District

POSTED

1 day ago

DEADLINE

in 4 days
View Details

More opportunities from California → Victor Valley Community College District

Same awarding agency

NAICS: 541330
SLED
Two-Story Instructional Building Project
Solicitation # FC-071226A
The Victor Valley Community College District is soliciting construction management services for the development of a new 43,000-square-foot, two-story instructional building on its Victorville, California campus, which includes the demolition of the existing Building 30, along with associated site improvements, utility infrastructure upgrades, and campus enhancements. The project is scheduled for a 350-day construction period beginning February 21, 2028, with substantial completion targeted for June 22, 2029, followed by a punchlist phase through August 17, 2029, and final occupancy on August 20, 2029, with DSA certification to be completed by October 12, 2029. The solicitation, issued under number 20260713028 and posted on July 14, 2026, requires responses no later than August 18, 2026, and is evaluated under a trade-off methodology that prioritizes technical merit over lowest price. The evaluation weighs the respondent’s skills and team capabilities at 35%, experience on similar projects at 25%, experience in higher education at 15%, proposed cost structure at 15%, and availability of personnel at 10%. The contract is structured as a fixed lump sum for basic services with hourly billing for additional services, though exact monetary values are not filled in, and pricing may be subject to negotiation post-evaluation. The Construction Manager must coordinate all phases—from design and bidding through construction and post-construction activities—ensuring compliance with CSI standards, DSA certification requirements, and District procedures, while also managing change orders, safety programs, and stakeholder communication. The Construction Manager is required to maintain minimum insurance coverage including workers’ compensation, employer’s liability, comprehensive general liability, automobile liability, and professional liability, and must verify contractors’ adherence to prevailing wage laws and safety standards, reporting any violations. The CM must not make unauthorized changes to the project scope and is held liable for any such actions to prevent organizational conflicts of interest. Proposals must include detailed documentation of relevant project experience limited to 15 pages, demonstrate prior success in higher education settings, and disclose any pending disputes, legal proceedings, or prior claims against professional liability insurance, with failure to disclose these potentially leading to disqualification. Respondents are expected to submit their proposals in the format outlined, with no formal UEI, CAGE,
Engineering Services

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details