Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Roofing and Waterproofing Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of roofing membranes, flashings, insulation, and waterproofing systems as part of the building envelope for a project located in Spring Valley, California, with a ZIP code of 91978. The work is classified under NAICS code 238160, indicating it is a subcontract for roofing and waterproofing services. The solicitation was posted on August 4, 2026, and responses are due by August 24, 2026, at 11:00 PM Pacific Time. The contracting entity is the Otay Water District, operating under the state of California, and all performance of the work must occur at the specified location in Spring Valley. No set-aside designation or organization type is provided, and there is no designated point of contact listed in the contract data. The full details and submission process can be accessed through the provided online portal.

General Info

Roofing and waterproofing subcontract for Spring Valley, CA project due August 24, 2026, by Otay Water District.

Agency

California → Otay Water DistrictView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Spring Valley, CA, 91978, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Otay Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Otay Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of roofing membranes, flashings, insulation, and waterproofing systems for the building envelope.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
Terminal Envelope Upgrade - Roof Replacement Project (DBB)The Port of Seattle’s Aviation Facilities & Infrastructure division is preparing to undertake a roofing replacement project at a terminal facility, targeting the demolition and removal of approximately 13,600 square feet of existing roofing membrane and insulation, along with the associated flashing and roof drains. The project will involve complete removal and installation of a new roofing system to ensure structural integrity and weather resistance, with work scoped to include all related components critical to proper drainage and sealing. This initiative falls under NAICS code 238160, indicating it is a roofing contract, and is being managed as a design-bid-build procurement under the Terminal Envelope Upgrade program. The solicitation is listed as a forecast with a posted date of July 31, 2026, and is not currently open for bids, but interested parties should monitor the official portal for formal release. Primary contact for inquiries is Angela Peterson, reachable via phone or email, with John McWilliams serving as the project manager for technical coordination. Although specific location details are not provided in the data, the work will occur at a Port of Seattle aviation facility, and all performance activities are expected to align with federal and local building standards. No set-aside provisions are indicated, suggesting the contract is open to all eligible contractors.
Aviation Facilities & Infrastructure

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
SLED
Pier 69 Third Floor Terrace RepairThe contract entails the complete demolition of the existing roof system on the third floor east terrace at Pier 69, including removal of pavers, drainage mat, and waterproof membrane. It requires installation of a new roof system using a pedestal-supported design with thinner pavers to improve drainage efficiency and prevent water accumulation. A new barrier wall will be constructed and installed around the structural steel beams to protect them from future corrosion caused by moisture exposure. All materials removed during demolition, including planters and other components, must be carefully staged and reinstalled using a crane due to their size and weight. The work is scoped to ensure long-term durability and performance of the terrace structure while meeting drainage and structural integrity standards. The project is managed by the Port of Seattle through its Waterfront Project Management division and is classified under NAICS code 238160 for roofing contractors. The solicitation was posted on July 31, 2026, and is currently in forecast status with no set-aside type specified. Primary point of contact is Todd Rehm, reachable at 206-491-2899 or rehm.t@portseattle.org, with Samuel Hansen serving as the project manager. The full details and documentation are available through the Port of Seattle’s online solicitation portal, though no physical address or geographic specifics beyond Pier 69 are provided in the data.
Waterfront Project Management

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
Dormitory Roof Replacement in Iowa
Solicitation # dormitory-roof-replacement-iowa
The Ottumwa Job Corps Center is seeking qualified roofing contractors to replace the existing mechanically attached TPO roofing system on Building 7 Dormitory in Ottumwa, Iowa, covering approximately 16,250 square feet of roof area and 1,600 square feet of parapet wall assemblies. Contractors must evaluate the current roof and propose either a complete tear-off and replacement or a recover system, with detailed technical justification for their recommendation. The new roofing system must consist of a fully adhered single-ply membrane—either EPDM or TPO—installed over tapered insulation and high-density cover board to ensure proper drainage, with all edge securement, flashing, coping, and penetration details meeting ANSI/SPRI ES-1 standards and current IBC and ASCE 7 wind design codes. The scope includes removal and disposal of existing materials, repair of the steel roof deck, modification of drains and scuppers as needed, installation of walk pads, and comprehensive repair of deteriorated parapet components including sealants, terminations, coping, and masonry. The contractor must use manufacturer-certified installers to qualify for a minimum 20-year No Dollar Limit manufacturer warranty, in addition to a 2-year contractor workmanship warranty. All work is subject to the Davis-Bacon Act, requiring compliance with prevailing wage rates and certified payroll reporting for both the prime contractor and all subcontractors. Proposals must include an itemized breakdown of materials and labor, a proposed construction schedule, warranty documentation, installer certification credentials, and clear delineation of any assumptions or exclusions. The solicitation is restricted to small business concerns under SBA set-asides, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, with proposals due by August 20, 2026. Point of contact for inquiries is Michelle Hayes of the Ottumwa Job Corps Center.
Ottumwa Job Corps

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238160
New
Federal
Repair by Replace Roof, B512
Solicitation # W50S9G26QA012
This solicitation, identified as W50S9G-26-Q-A012, is a combined synopsis and solicitation for commercial construction services directed at the 128th Air Refueling Wing at General Mitchell Air National Guard Base in Milwaukee, Wisconsin. The work involves the complete removal and replacement of approximately 23,100 square feet of built-up roofing on Building B512 with a new 90-mil EPDM membrane system including R-30 insulation, as well as replacement of gutters and downspouts under CLIN 0001. Two optional tasks are available: CLIN 0002 covers tuck-pointing 15% of CMU walls, painting 6,600 square feet of exterior surfaces, and re-caulking penetrations; CLIN 0003 includes the removal and replacement of seven exterior doors and the construction of one new interior CMU security wall with a corresponding door assembly. All optional work, if exercised, must be performed concurrently with the base requirement, and the entire project—base and options combined—must be completed within 180 calendar days. The requirement is a 100% total small business set-aside under NAICS code 238160 with a size standard of $19.0 million, and the anticipated budget range is $500,000 to $900,000. Funds are not currently available but are expected to be obligated prior to award, as the project is on the National Guard priority list. A site visit is scheduled for July 28, 2026, requiring registration by July 22, 2026, due to security protocols. Questions and submissions must be emailed exclusively by the stated deadlines: RFIs by August 6, 2026, and full quotes—containing pricing, technical approach, past project history, proposed resources, and a completed Source Sought Information Request Form—by August 13, 2026. All submissions are limited to five typewritten pages and must include entity identification via CAGE code and Unique Entity ID, affirmation of small business status, evidence of bonding capability, and SAM registration. The government anticipates awarding a firm-fixed price contract, with inspection and acceptance occurring at the performance site in accordance with UFC 3-110-03 roofing standards and manufacturer specifications. No formal
W7N8 Uspfo Activity Wiang 128

POSTED

about 14 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → Otay Water District

Same awarding agency

NAICS: 100007
New
SLED
1485-1 Reservoir Interior/Exterior Coating & Upgrades
Solicitation # CIP P2657
The Otay Water District is soliciting bids for the interior and exterior coating and structural upgrades of the 1485-1 Reservoir, a 0.3 million-gallon, above-ground, welded steel reservoir built in 1962 located in Spring Valley, California. The scope requires full removal and disposal of existing coatings, surface preparation to SSPC-SP10 near-white metal standards on all interior and exterior surfaces including ceiling, rafters, columns, shells, floor, roof, and appurtenances, followed by application of new protective coatings. Additional work includes installation of new magnesium anodes, a 10-inch steel overflow pipe, a 1-inch corporation stop with locking metal box, safety climb systems, OSHA-compliant safety gates, roof railing, and structural modifications. All materials must be delivered in original, unopened containers with full manufacturer markings, batch/lot numbers, and date of manufacture, and Material Safety Data Sheets must be provided for all chemicals. Work must comply with AWWA D100 and API 650 standards, with interior dehumidification during coating and curing and thorough flushing with potable water upon completion. The project is subject to California public contract laws, including prevailing wage requirements, apprentice utilization, and labor non-discrimination provisions. Bids are due by 4:00 PM local time on August 24, 2026, and must be submitted exclusively through the PlanetBids portal. The award will be made to the lowest responsive and responsible bidder based on bid items 1 through 27, with no weighted scoring factors. Mandatory submittals include a bid bond of at least 10% of the bid amount, performance and payment bonds for 100% of the contract value issued by a California-admitted surety with a Best rating of A VII or better, and proof of insurance including $5 million commercial general liability, $1 million business auto liability, and statutory workers’ compensation with employer’s liability coverage of at least $1 million per occurrence. Insurance policies must name the District as an additional insured and be primary. Contractors must submit safety plans and qualifications of a safety supervisor for approval before starting work, and must certify in writing that no coatings contain prohibited VOCs such as PCE, TCE, or MEK. Contractors must provide calibrated inspection tools on-site for dry film thickness and holiday testing, which will be verified by an independent AMPP PCS Level 3 inspector hired by the District

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details