This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on October 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rope Access Bridge Inspections

Awarded
W912ES24Q0078Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves providing a three-person rope access inspection team to perform comprehensive inspections of multiple USACE bridges and dam service structures at Lower and Upper St. Anthony Falls, Lock and Dam No. 7, and Lock and Dam No. 8 along the Mississippi River. The inspections include routine and fracture critical member assessments, with final reports generated for each structure, incorporating current structural data. The team, led by a certified Level III SPRAT or IRATA supervisor, must meet strict qualification standards, including NICET certification and OSHA-compliant safety training, and work collaboratively with USACE personnel during a scheduled 60-day window, with work expected to take approximately nine days starting around October 14, 2024. Access to the bridges involves coordination with USACE for safe entry points, with all inspection activities adhering to rigorous safety standards outlined in EM 385-1-1. The contractor is responsible for developing detailed operation, rigging, and safety plans, including rescue procedures, which must be approved prior to work commencement. Deliverables include digital photographs documenting the condition of bridge components, submitted within a week of inspections, and final reports within 60 days post-inspection. The contract emphasizes strict qualification requirements for personnel, comprehensive safety protocols, and detailed coordination efforts, with all data and reports furnished using USACE templates and forms.

General Info

Rope Access Bridge Inspections at Mississippi River sites by certified inspection team.

Contract Value

$1,933

NAICS

541330 - Engineering Services

Place of Performance

Saint Paul, MN, 55101, USA

Set-Aside

SBA

Award Issued Date

Documents

10

LD7 FCM and FSD Category D Site Plan

PDF, High priority: read this firstspecifications
High

LD8_FCM_updated_drawings - Site Plan

PDF, High priority: read this first7 pages · specifications
High

Lock & Dam 8 Service Bridge Inspection Report (CENM/PWM-00LD08)

PDF, High priority: read this firstspecifications
High

LSAF Site Plan

PDF, High priority: read this firstspecifications
High

W912ES24Q0078 Amendment 0001

PDF, High priority: read this firstamendment
High

W912ES24Q0078 - Rope Access Rigging and Supervision

PDF, High priority: read this firstrfq
High

CEXMVPMMN-00USAF USAF Pedestrian Bridge Inspection Report

PDF, Low priorityspecifications
Low

Lock and Dam No. 7 Inspection Report (CENMVPMN-00LD07)

PDF, Low priorityinspection-report
Low

LSAF Service Bridge (CENMVPMN00LSAF) Inspection Report

PDF, Low priorityspecifications
Low

USAF FCM Plan

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
ROPE ACCESS RIGGING AND SUPERVISION OF THE DAM SERVICE BRIDGES AT LOWER ST. ANTHONY FALLS, LOCK AND DAM NO. 7, LOCK AND DAM NO. 8, AND THE PEDESTRIAN BRIDGE AT UPPER ST. ANTHONY FALLS 1 GENERAL The Contractor shall provide a (3) three-person rope access inspection team, which will work with USACE personnel as a joint team to perform the following tasks: 1.1 BRIDGE INSPECTIONS Perform a combined routine and Fracture Critical Member (FCM) inspection of U.S. Army Corps of Engineers (USACE) lock and dam service bridges over the Mississippi River at: 1.1.1 Upper St. Anthony Falls (USAF) (CEXMVPMN-00USAF) Lock pedestrian bridge located in Minneapolis, Minnesota. Approximate length of bridge is 50 feet. Total number of spans: 1. 1.1.2 Lower St. Anthony Falls (LSAF) (CENMVPMN000LSAF) Lock and dam service bridge located in Minneapolis, Minnesota. Approximate length of bridge is 330 feet. Total number of spans: 6, 3 Tainter Gates, 1 Auxiliary Lock Chamber / Hydro Dam, 1 Main Lock Chamber, and 1 Storage Yard. 1.1.3 Lock and Dam 7 (LD7) (CENMVPMN-00LD07) Lock and dam service bridge located in La Crescent, Minnesota. Approximate length of bridge is 940 feet. Total number of spans: 19, 5 Roller Gates, 11 Tainter Gates, and 3 Storage Yard). 1.1.4 Lock and Dam 8 (LD8) (CENMVPWI-00LD08) Lock and dam service bridge located in Genoa, Wisconsin. Approximate length of bridge is 934 feet. Total number of spans: 18, 5 Roller Gates, 10 Tainter Gates, and 3 Storage Yard). 1.2 DAM SERVICE AND PEDESTRIAN BRIDGE REPORTS: A final Bridge Inspection Report shall be generated for each dam service and pedestrian bridge inspected (4 total). The provided template shall be used to generate the final reports. Each report shall include the current Structural Inventory and Appraisal (SI&A) Data. 2 MVP INSPECTION TEAM MEMBERS The St. Paul District (MVP) will supply two (2) inspectors. One (1) will be a rope access SPRAT Certified Level I bridge inspector, who will serve as an inspection team member and is the current District Bridge Safety Program Manager (BSPM). The second will be one (1) inspector to help coordinate inspection personnel and duties. 3 ACCESS 3.1 BRIDGE ACCESS The pedestrian bridge at USAF is located at the downstream end of the lock chamber and is accessible by the land wall. The service bridge at LSAF is accessible from the land wall, and the dam service bridges at LD7 and LD8 are accessible by crossing the miter gates over the main lock chamber and auxiliary lock chamber. The service bridge at LSAF is accessed from the land wall via a staircase in the pier. Access to the bridge decks is through stairways in the dam piers. The service bridge decks are at least 8 feet wide. All service bridges are equipped with rails to accommodate a crane or lifting carriage. Cranes will be locked out by Government personnel each day prior to the start of the inspection. 4 DURATION AND DATES The above listed bridges are on a 60-month inspection cycle in accordance with ER 1110-2-111, USACE Bridge Safety Program, and as such all on-site inspection work shall be completed no later than November 30, 2024. Inspection duration is estimated at nine (9) total workdays, including one (1) day for contingencies. Inspection days will require ten (10) hour workdays. Work will be required on Saturdays. Work will not be conducted on Sundays. In the event of extreme weather and or unsafe work conditions, work shall be delayed until safe working conditions are present. The target date for commencement of inspection work is October 14, 2024. The inspection commencement date shall be jointly agreed to between the contractor and the government no later than fifteen (15) calendar days after contract award. The final bridge inspection reports shall be submitted to the Bridge Safety Program Manager (BSPM) sixty (60) days after the on-site inspections. 5 CONTRACTOR REQUIREMENTS The Contractor shall complete the following tasks: 5.1 BRIDGE INSPECTOR QUALIFICATIONS The contractor shall provide a three (3) person rope access inspection team, which will work with USACE MVP inspection team as a joint team, to perform visual, hands-on inspections of the bridges. Contractor personnel shall be certified by the National Institute for Certification in Engineering Technologies (NICET), in bridge safety inspection IAW National Bridge Inspection Standards (NBIS). The Contractor shall also comply with the requirements of the Corps Safety and Health Requirements Manual EM 385-1-1. 5.1.1 Team Leader In accordance with 23 CFR 650.309 the inspection team shall have one (1) member designated as the Team Leader. The Team Leader must meet all of the qualifications laid out in 23 CFR 650.309. An individual who has a Level III certification as a Bridge Safety Inspector under the National Society of Professional Engineer's program for NICET and has completed a Federal Highway Administration (FHWA) approved comprehensive bridge inspection training course, such as FHWA-NHI-130055 or FHWA-NHI-130056 Team Leader Training certificate or subsequent FHWA-NHI-130053 refresher training certification, would meet these requirements. The Team Leader shall be on site during all inspection work. Team Leader shall have also successfully completed FHWA-NHI-130078 or equivalent. All certifications shall be current. 5.1.2 Team Members The remaining two (2) team members shall have a minimum of five (5) years of bridge inspection experience and shall maintain a current FHWA-NHI-130055 training certificate or subsequent FHWA-NHI-130053 refresher training certification. 5.2 ROPE ACCESS QUALIFICATIONS 5.2.1 Rope Access Supervisor/Qualified Person (QP) for Rope Access The contractor shall comply with the requirements of the USACE EM 385-1-1, Safety and Occupational Health Requirements. In accordance with EM 385-1-1 at least one (1) member of the contractor's inspection team shall be a Rope Access Supervisor/QP (Team Leader) who is an experienced Rope Access Technician with qualifications stated in 5.1.1 and has completed training and certification to perform complex rigging, advanced rescue, and advanced rope access skills. The Rope Access Supervisor/QP for Rope Access (Team Leader) is responsible for the entire rope access work site, including management and oversight of Rope Access Technicians on the work site and designing, analyzing, evaluating, and specifying the rope access work systems. They must have knowledge and experience to direct rescue operations from rope access systems and be able to perform advanced rescue from rope access systems. An individual with a current Level III SPRAT or IRATA certification meets these requirements as laid out in EM 385-1-1. A Rope Access Supervisor shall be on site during all inspection work. 5.2.2 Rope Access Technician/Authorized Technician All remaining members of the contractor's inspection team shall be Rope Access Technicians in accordance with EM 385-1-1. Person(s) shall have completed training and certification to perform standard rope access operations including operating ascent and descent systems, using fall protection, and have the skills necessary to perform limited rescue from rope access systems. They may only work under the direct supervision of a Rope Access Lead Technician/CP for Rope Access or Rope Access Supervisor/QP. An individual with a current minimum Level I SPRAT or IRATA certification meets these requirements. 5.3 DELIVERABLES The contractor shall record the condition of bridge members using digital photographs and MVPs forms. Photos must be provided to the bridge safety program manager no later than seven (7) calendar days after completion of the inspection via digital format (.jpeg, jpg, pdf) through email. All photos must contain a date, physical location description, and defect or condition description. 6 Government Furnished Data 6.1 Field Book, Coding Guide, and Inspection Forms All necessary field books, coding guide, and forms will be provided by the St. Paul District to the contractor no later than fifteen (15) calendar days prior to the first inspection. 6.2 REPORT TEMPLATES A Microsoft Word document (.docx) of the Corps of Engineers Bridge Inventory System (CEBIS) Standard Report Template along with a PDF copy of the previous Inspection Reports for each site will be furnished to the contractor no later than fifteen (15) calendar days prior to the first inspection. 6.3 LOCK AND DAM MAILING ADDRESSES Upper St. Anthony Falls Lock and Dam United States Army Corps of Engineers 1 Portland Avenue Minneapolis, MN 55454-1027 Lower St. Anthony Falls Lock and Dam United States Army Corps of Engineers 1 Portland Avenue Minneapolis, MN 55454-1027 Lock and Dam No. 7 United States Army Corps of Engineers Route 2 Box 51 La Crescent, MN 55947 Lock and Dam No. 8 United States Army Corps of Engineers 4405 Highway 35 (Box 10) Genoa, WI 54632 6.4 POINT OF CONTACT Provided after contract award 7 ADDITIONAL DETAILED REQUIREMENTS The Contractor shall complete the following tasks and submit to the government: 7.1 COORDINATION OF OPERATION PLAN Operation plan shall include, but is not limited to, travel logistics, rigging plan, safety plan, and site access. Rigging plan and safety plan requirements are described below. The operation plan shall be submitted to the Bridge Safety Program Manager (BSPM) no later than seven (7) calendar days prior to the first inspection, to be finalized before work begins. The Level III Team Leader/Rope Access Supervisor shall lead a teleconference with all members of the joint inspection team at least one (1) week prior to the commencement of the inspection to discuss all aspects of the operation plan. 7.1.1 Rigging/Access Plan and Equipment The contractor shall develop a comprehensive rigging and access plan to allow rope access inspectors to perform hands-on, and close-up visual inspection of all bridge components, including but not limited to the bottom flange, interior bracing members and all Fractural Critical Members (FCMs). The contractor shall also provide any additional equipment necessary for a potential rescue scenario. An up-to-date log of all equipment to be used for the rope access inspections, shall be kept, and maintained by the contractor. Rigging plan should be included as part of the operation plan. 7.1.2 Safety Plan The Contractor may coordinate with the BSPM to develop and provide an individual Job Hazard Analysis (JHA) for each project, including a rescue plan; and host a pre-work safety briefing at each project site before inspection work commences. The preliminary JHAs for the project shall be developed to the extent possible with information available prior to the inspection and shall be submitted for approval to USACE as a draft as part of the operation plan prior to the first inspection. Prior to conducting any rope access work before each shift, the contractor shall hold documented safety meetings, rescue pre-planning, and complete the JHA form. The JHA shall be completed on site together between the contractor and USACE and shall be reviewed and signed by all applicable parties at the pre-work safety briefing prior to the inspection. 8 LIMITING CRITERIA SAFETY STANDARDS All training and equipment must meet or exceed OSHA and ANSI requirements and be in accordance with the current Corps of Engineers Manual EM 385-1-1, entitled Safety and Health Requirements Manual. Contractor personnel shall follow safety guidelines for rope access to meet or exceed EM 385-1-1 (Ex: SPRAT or IRATA) requirements for quality assurance, safety, training, documentation and working practices. At the beginning of each shift, the contractor's employees shall conduct a documented safety meeting. 9 REQUIRED INFORMATION TO BE SUBMITTED WITH COST QUOTE 9.1 BRIDGE INSPECTOR(S) CREDENTIALS: THE NAMES, QUALIFICATIONS, AND PREVIOUS EXPERIENCE RECORDS OF THE INSPECTION TEAM MEMBERS THAT WILL BE ASSIGNED TO THIS PROJECT, TO INCLUDE SPRAT OR IRATA CERTIFICATIONS, AND WORK EXPERIENCE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER ALONG WITH THE CONTRACTOR'S COST PROPOSAL. 9.2 CERTIFICATIONS REQUIRED: 9.2.1 NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET), IN BRIDGE SAFETY INSPECTION IAW NBIS OR EQUIVALENT, PER PARAGRAPH 5.1.1 9.2.2 SPRAT OR IRATA CERTIFIED LEVEL III ROPE ACCESS SUPERVISOR, PER PARAGRAPH 5.2.1. 9.2.3 SPRAT OR IRATA CERTIFIED LEVEL II ROPE ACCESS TEAM MEMBER, PER PARAGRAPH 5.2.2. IF, POST AWARD, THE CONTRACTOR WISHES TO CHANGE PERSONNEL THE NEW TEAM MEMBERS SHALL MEET OR EXCEED THE INDIVIDUAL THEY'RE REPLACING.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 18 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS