Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Roundabout at Ward Avenue and Salado Avenue Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Patterson is seeking a contractor for the Roundabout at Ward Avenue and Salado Avenue Project, identified by solicitation number 50-2025-155. The primary objective of this project is to mitigate traffic congestion through the installation of a mini traffic circle at the intersection of Ward Avenue and Salado Avenue. The scope of work includes the design and implementation of asphalt overlay, dig-outs, and striping along Ward Avenue from American Eagle Avenue to 9th Street, and along Salado Avenue from Ward Avenue to 7th Street. Additionally, the project requires the full-depth reconstruction of severely damaged pavement surfaces using aggregate base and asphalt concrete, as well as the reconstruction of 13 curb ramps to ensure compliance with current Americans with Disabilities Act standards. The project will be performed within the City of Patterson right-of-way in California, with a specific requirement to evaluate a potential conflict involving a TID power pole and guy wire at the northeast corner of the intersection. This project is categorized as a forecast under NAICS code 237310 and has been granted a Notice of Exemption from CEQA under Class 1 for the preventive maintenance of public road segments. The primary point of contact for this effort is Tiffany Rodriguez, the Director of Engineering for the City of Patterson.

General Info

City of Patterson seeks contractor for roundabout installation and road repairs at Ward/Salado.

Agency

California → City of Patterson

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Ward Avenue/Salado Avenue: American Eagle/9th Street, Salado Avenue: Ward Avenue/7th Street,, Patterson, CA, 95363

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Roundabout at Ward & Salado Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Patterson
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Patterson
Office AddressN/A
Contacts
Tiffany RodriguezDirector of Engineering/City Engineer

Full Description

Show more
This project will consist of installing a mini traffic circle/roundabout at the intersection of Ward Avenue and Salado Avenues to mitigate the congestion that accumulates along both roads. The Project will also include design of asphalt overlay necessary dig-outs, and striping along Ward Avenue, from American Eagle Ave to 9th St and Salado Ave from Ward Ave to 7th St. Before overlaying, pavement surfaces with severe conditions will be reconstructed to full section depth, including excavation and reconstruction with aggregate base and asphalt concrete. In addition, 13 curb ramps within the project limits will be reconstructed to meet the most current Americans with Disabilities Act (ADA) Standards. The improvements are expected to be located within the City of Patterson right-of-way, though a potential conflict with a TID power pole and guy wire at the northeast corner will need to be evaluated.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS