Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

RVRA invites sealed bids for perimeter litter control fence at the Smith Gap Landfill.

Active
IFB-124278State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Roanoke Valley Resource Authority is soliciting sealed bids for the design and installation of a permanent 30-foot-tall perimeter litter control fence at the Smith Gap Landfill located at 8484 Bradshaw Road in Salem, Virginia. The project requires approximately 1,500 linear feet of engineered fencing, including all structural poles, foundations, netting, attachment hardware, and outrigger assemblies, designed to meet a minimum 20-year service life. All labor, materials, equipment, and incidental costs must be provided by the selected bidder to complete the work in full compliance with the specified requirements. Bids are due by August 13, 2026, at 2:00 PM Eastern Time, with the solicitation numbered IFB-124278 and originally posted on July 13, 2026. Proposals must be submitted in accordance with the official guidelines, and inquiries may be directed to Lorie Bess at lbess@rvra.net or 540-857-5050.

General Info

Design and install 30-foot perimeter litter fence at Smith Gap Landfill, 1,500 linear feet, 20-year life, bids due August 13, 2026.

Agency

Virginia → Roanoke Valley Resource AuthorityView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Smith Gap Landfill, 8484 Bradshaw Rd, Salem, VA 24153, VA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Roanoke Valley Resource Authority
Contacts1 person available
OfficeN/A
Organization / Agency
Virginia → Roanoke Valley Resource Authority
View Agency Profile
Office AddressN/A

Full Description

Show more
RVRA invites sealed bids for the furnishing of all labor, materials, equipment, and incidentals necessary for the design and installation of a permanent perimeter litter control fence at the Smith Gap Landfill, 8484 Bradshaw Road, Salem, VA 24153. The Work consists of approximately 1,500 linear feet of engineered litter control fence, extending from finished grade to a height of thirty (30) feet, complete with all structural poles or posts, foundations, netting, attachment hardware, and outrigger assemblies as specified herein. The Authority anticipates an approximate service life of twenty (20) years for this installation. Bids are due August 13, 2026 at 2PM.

Similar Contracts

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive airfield modernization initiative at the Port of Seattle, focusing on critical infrastructure upgrades to enhance safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with new LED lighting fixtures and signs to improve visibility and reduce energy use. Failing pavement sections and essential utilities will be replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on airfield signage to deter birds, and addressing ponding issues through regrading and the installation of new storm drainage systems. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The work is part of a broader effort under the AIRFIELD 2028 ALL PROJECTS initiative, managed by the Aviation Project Management Group, with performance expected at Seattle-Tacoma International Airport. The solicitation, posted in July 2026, is categorized under NAICS code 237990 for other heavy and civil engineering construction, and Yanet Maldonado serves as the primary point of contact for inquiries.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and safety upgrade of airfield infrastructure at the Port of Seattle, focusing on critical systems that ensure operational efficiency and compliance with aviation safety standards. Key components include replacing aging airfield lighting circuits with low megger readings with new LED lighting fixtures and signs to enhance visibility and reduce maintenance costs, as well as replacing deteriorating pavement and essential utilities to maintain structural integrity and prevent service disruptions. Wildlife hazard management efforts involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on airfield signage to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure to mitigate wildlife attraction and water accumulation. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response teams. The project is classified under NAICS code 237990 and is part of the broader AIRFIELD 2030 initiative, which integrates multiple capital improvement goals under a single procurement. Although the solicitation number is not provided, the forecast was posted on July 14, 2026, with Yanet Maldonado of the Aviation Project Management Group serving as the primary point of contact, reachable via phone or email for inquiries. The work is expected to occur at the Port of Seattle’s airfield facilities, though the precise location details are not specified in the data.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Deaerator (DA) and Condensate System UpgradesThe Port of Seattle’s Aviation Project Management Group is preparing to replace the Deaerator (DA) and Condensate tanks within the Central Mechanical Plant to upgrade critical steam and water system infrastructure. This initiative aims to enhance operational efficiency, ensure regulatory compliance, and extend the service life of essential mechanical systems supporting airport facilities. The work involves the removal of existing outdated equipment and the installation of new, higher-capacity, and more reliable Deaerator and Condensate tanks, along with associated piping, controls, and safety systems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, suggesting a complex, non-building construction scope requiring specialized industrial expertise. Leila Gonzalez-Rigatto serves as the primary point of contact for inquiries, with Matthew Piccolo listed as the Project Manager overseeing execution. The solicitation is currently in forecast status with no set aside type specified, indicating an open competition for qualified contractors. While the exact timeline for bid submission and award is not yet defined, the posted date of July 14, 2026, signals the official notice of upcoming procurement activity. Contractors interested in bidding should prepare detailed proposals addressing technical specifications for equipment replacement, project scheduling, safety protocols, and experience with similar industrial system upgrades in high-availability environments. The location of performance is the Central Mechanical Plant at the Port of Seattle, though full address details are not yet public.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details