Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from South Carolina was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S-70 Stuart Point Road Sidewalk

Closed
IFB 102226State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal construction project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of MSE retaining walls, steel H-piles, drilled shafts, and specific trackwork components such as transition tie spacing and rubberized gap fillers. The project is governed by a hierarchy of specifications, with Job Special Provisions taking precedence, followed by standards from the City of St. Louis, the Missouri Department of Transportation, and the Metropolitan St. Louis Sewer District. The contract carries a performance responsibility value of approximately 27.41 million dollars and a completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must provide a 5 percent bid deposit and ensure surety companies have a policyholder rating of A- or better and a financial rating of V or higher. Compliance requirements are extensive, including mandatory E-Verify participation, adherence to the Buy America Certification for iron and steel, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, the project mandates strict adherence to Disadvantaged Business Enterprise (DBE) goals and the payment of the higher of the Missouri state or federal Davis-Bacon prevailing wage rates. Submissions must be made electronically via the Bid Express Online Portal, accompanied by a comprehensive package including a signed bid proposal, various affidavits, and detailed DBE participation forms. Final acceptance of the project is contingent upon meeting ADA and PROWAG standards, with specific quality control requirements for EPS fill and AASHTO accreditation for third-party concrete testing facilities.
City of St. Louis Board of Public Service

POSTED

about 13 hours ago

DEADLINE

in about 9 hours
NAICS: 237310
New
SLED
Construction of Sun Mountain Boulevard
Solicitation # 26-009
The City of Pueblo has issued solicitation 26-009 for the West Side Improvements Project, which primarily involves the construction of Sun Mountain Boulevard. This project consists of building a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert at the Wildhorse Creek Drainageway. Additionally, the broader initiative includes the implementation of three bus stop packages covering 67 locations. The project is funded through a U.S. Department of Transportation Federal Highway Administration RAISE Grant, necessitating strict adherence to federal requirements, including the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America (BABA) domestic sourcing preferences, and Title VI of the Civil Rights Act of 1964. The contract will be awarded to the responsible bidder providing the lowest and most responsive total base bid plus any selected alternates. Bidders must provide a bid bond for five percent of the grand total, and the successful contractor must furnish performance and payment bonds within ten business days of notice. Key performance requirements include a minimum of 100 training hours dedicated to workforce development and labor-management partnership programs. Technical compliance is governed by CDOT Standard Specifications and specific project addenda, with particular emphasis on geotechnical recommendations and strict packaging and storage standards for biotic soil amendments. Bids are submitted electronically via the OpenGov portal, with a final deadline of November 4, 2026.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The S-70 Stuart Point Road Sidewalk Project, issued by Beaufort County Procurement Services under solicitation IFB 102226, involves the construction of a new 8-foot wide sidewalk approximately 2 miles in length. The project extends from the US 21 Trask Parkway intersection to the Seacrest Lane, Delaney Circle, and Abdullah Lane intersection, providing critical pedestrian connectivity to Whale Branch Elementary and Middle Schools. While the design primarily utilizes existing right of way, some new right of way may be acquired for tree preservation and drainage improvements. The engineer's estimate for the main construction is 1,950,500 dollars, with an additional 8,335 dollars estimated for BJWSA utility relocation. Bids must be submitted electronically by October 22, 2026, at 3:00 pm, with the contract awarded to the lowest responsible bidder. The project requires a 180-day delivery timeline and adherence to SCDOT 2025 Standard Specifications for Highway Construction and ADA guidelines. Because the project is funded in part by the Community Development Block Grant Program, contractors must be registered in the System for Award Management and comply with Davis-Bacon Act labor standards and Title VI non-discrimination requirements. Mandatory submissions include a 5 percent bid bond, certifications regarding the Build America, Buy America Act, and the South Carolina Illegal Immigration Reform Act. The contractor is responsible for hiring an independent testing laboratory for all required inspections and must submit a progress schedule two weeks before starting work. Environmental constraints prohibit tree felling between December 15 to February 15 and April 15 to July 30 to protect bat species. Additionally, the prime contractor must submit monthly compliance status reports regarding small and minority business participation. Awarded contractors must provide performance and payment bonds equal to 100 percent of the contract amount and ensure all subcontractors are SAM registered.

General Info

Beaufort County sidewalk project, 2 miles long, estimated 1.96 million, bids due October 2026.

Documents

5
PDF, High priority: read this first82 pages · ifb
High
PDF, High priority: read this first82 pages · ifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority1 page · compliance-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Engineering
Contacts2 people available
OfficeBeaufort, SC, 29902, USA
Organization / AgencySouth Carolina → Engineering
Office AddressBeaufort, SC, 29902, USA
Contacts
Robert SloanProject Manager
Victoria MoyerDeputy Director

Interested Companies (34)

THCDuluth, GA
ConstructconnectCincinnati, OH
Southern Commercial DevelopmentLexington, SC

See All 34 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The S-70 (Stuart Point Road) Sidewalk Project is a new 8' sidewalk on Stuart Point Road from US 21 (Trask Parkway) intersection to Seacrest Lane/Delaney Circle/Abdullah Lane intersection. This sidewalk is approximately 2 miles long and will connect to Whale Branch Elementary and Middle Schools. The proposed design will remain within present right of way, but there are areas of new right of way for drainage improvements or to save trees.

More opportunities from South Carolina → Engineering

Same awarding agency

NAICS: 237310
New
SLED
Beaufort County 2027 Resurfacing
Solicitation # IFB 111726
The Beaufort County 2027 Resurfacing project, solicitation IFB 111726, is a formal sealed bid effort to maintain county roads and assist the South Carolina Department of Transportation (SCDOT) in ensuring roadway safety. The scope of work includes road preparation, milling asphalt pavement for transitions, restoring shoulders to prevent drop-offs larger than two inches, and applying thermoplastic pavement markings and raised pavement markers. All work must adhere to the SCDOT 2025 Standard Specifications for Highway Construction and the 2009 Manual on Uniform Traffic Control Devices. Performance deadlines are set for June 1, 2027, for all SCDOT roads and September 30, 2027, for all Beaufort County roads. The contract will be awarded to the lowest responsible bidder based on the total price for items listed in the schedule, which includes significant quantities of asphalt surface course and milling. Bidders must submit electronic proposals via the OpenGov Procurement Portal by November 17, 2026, including a bid bond for five percent of the total bid amount. Awarded contractors are required to provide performance and payment bonds within fourteen days of notification. Key administrative requirements include the use of an independent third-party SCDOT Certified Level 1 inspection laboratory, submission of monthly applications for payment, and strict adherence to Small and Minority Business Participation reporting through monthly compliance status reports.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS