Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on October 8, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S218--Snow and Ice Removal

Closed
36C24121Q0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. The scope of work encompasses a comprehensive range of services including demolition, site and soil preparation, irrigation, planting, concrete work, lighting, and low-voltage electrical work. The project must be completed within 45 working days and adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and specific guidelines for tree preservation and Caltrans thermoplastic specifications for pavement markings. The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal, and the submission must include a bid security of at least 10 percent of the bid amount. Successful bidders are required to provide performance and payment bonds within ten business days of the award. Compliance with the California Department of Industrial Relations for prevailing wages, the City's Living Wage Ordinance, and Equal Employment Opportunity regulations is mandatory. The City offers local business preferences, including a 2 percent preference for businesses with a local office and an additional 4 percent for those with at least 50 percent local ownership within Santa Cruz County.
Economic Development and Housing

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 2 hours ago

DEADLINE

in about 6 hours
NAICS: 561730
New
SLED
Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF
Solicitation # PD 25-26.118
Solicitation PD 25-26.118 is an Invitation to Bid issued by Escambia County for the Dune Matrix Enhancement project at Pensacola Beach, Florida. Funded by the National Fish and Wildlife Foundation National Coastal Resiliency Fund, the project aims to improve coastal resiliency and biodiversity through the installation of approximately 78,710 units of native vegetation, including sea oats, panic grass, and diversity groundcover. The scope of work also includes the installation of sand fencing, post-and-rope fencing, and signage, as well as the removal of asphalt debris across approximately 24,004 square yards. All planting must utilize a super absorbent polymer pre-hydrating gel and adhere to specific root ball and depth requirements. The contract requires substantial completion within 150 consecutive calendar days from the Notice to Proceed, with total completion due within 180 days, excluding documented weather delays. Bids are evaluated based on responsiveness, responsibility, and price, with the County reserving the right to award on an all-or-none or lot-by-lot basis. Because of the federal funding source, the project must comply with the Davis-Bacon Act for prevailing wages, the Copeland Anti-Kickback Act, and Build America, Buy America requirements for iron, steel, and construction materials. Contractors must provide performance and payment bonds, maintain general liability insurance, and ensure all work complies with OSHA standards and the Americans with Disabilities Act.
Purchasing

POSTED

about 3 hours ago

DEADLINE

in 5 days

General Info

NAICS

561730 - Landscaping Services

Place of Performance

150 SOUTH HUNTINGTON AVE, Boston, ME, 02130, USA

Set-Aside

NONE

Documents

1

36C24121Q0012.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
John ShawkiContract Specialist

Full Description

Show more
THIS SOURCES SOUGHT/REQUEST FOR INFORMATION IS ISSUED FOR INFORMATION AND PLANNING PURPOSES ONLY AND IS NOT CONSIDERED A SOLICITATION. The purpose of this sources sought/RFI is to gain knowledge of businesses that are capable of satisfying the following work requirements: Statement of Work General Description of Work: This contractor will provide all supervision, labor, tools, equipment, materials, fuel and plant necessary to remove snow on walkways, stairs, ramps, landings, building entrances, pad mount generators access, Siamese connections, fire hydrants, roads, perimeter sidewalks and parking garages, treat surfaces, load piles of snow and transport to a snow dump. The work is located at the Jamaica Plains facility grounds and perimeter sidewalks. Bituminous asphalt surfaces shall be treated with rock salt. Concrete and masonry surfaces shall be treated with concrete safe ice melt products. When snow storage is full or directed by the COR, load and haul stockpiled snow off site, off load and dispose of snow at the contractor s offsite snow dump. Contract includes all tolls, costs and fees. Contract contains unit costs and not to exceed quantities in accordance with schedule. Contractor shall provide daily documentation to demonstrate manpower, equipment and material used per day and per storm, quantities of salt per day and per storm, quantities of ice melt per day and per storm and the quantity removed from the site per day and per storm. Contractor shall invoice for work performed, quantities removed from the site and offloaded at a snow dump. The medical center must remain clear of snow and operational for all patient visits and its required staff. General Requirements: 1. Site is located at the VA Boston Healthcare System, Jamaica Plain campus, 150 South Huntington Ave. 2. Provide snow plowing, snow hauling, snow blowing, snow shoveling and surface treatment for roadways, parking lots, parking garages, walk ways, stairs, entrances, stairs, steps, ramps, fire hydrants, Siamese connections, generator walkways, pad mounted transformers and perimeter walkways. For snow fall and snow/ice/sleet greater than on half (1/2) inch the contractor shall respond within 1 hour of snow fall. 3. For trouble calls and emergency service, the contractor shall respond within 1 hours after receiving notification from the Contracting Officer s Representative (COR) or the Engineering Service Grounds Supervisor to commence snow and/or ice removal and surface treatment. Contractor shall respond during normal business hours (6am-6pm), nights, weekends (Saturday or Sunday) and holidays. The contractor shall furnish the COR with a list of telephone numbers where the contractor or his authorized representative may be contacted seven (7) days a week, 24 hours a day, for the required services. 4. The facility has a snow dump area(s) that are shown on the snow removal plan. The contractor shall pile and stack snow in a safe and efficient manner. Piles shall be stacked to maintain safety and maximum usable parking area. Once the area is full, the contractor schedules a weekend to haul snow off site to a snow dump. The contractor shall provide a minimum of 7 days notice to initiate off site snow haul services. 5. The contractor shall maintain, repair, fuel and utilize the governments model SND580, Snow Dragon, thermal snow recycler. The unit shall be placed in the the pit area of lot 9 and used to melt snow during snow storms. 6. The removal of stockpiled snow from the top garage decks shall be performed after 6pm or prior to 4am, weekdays and weekends. Remove garage stockpiles after each storm. The contractor shall block off area at grade prior to dumping top deck snow (to prevent unauthorized entry to the dumping area). Provide spotter(s) at grade to prevent unauthorized entry. 7. Contractor is authorized one, 20-yard storage box. Fuel and flammable liquids shall be stored in approved containers and stored for a single day use. Overnight or short-term storage is not authorized unless scheduled in advance as part of the snow haul requirement. Contractor shall remove storage box for annual April 15 completion date. Asphalt patch and repair any damage caused by the delivery and removal of the storage box. 8. Contractor shall share the governments , Building 5, salt storage bin for the delivery and storage of rock salt. The contractor shall provide all rock salt for roadway, bituminous parking surface treatment and bituminous walkways/sidewalks. Coordinate deliveries around medical center operations. Salt deliveries are limited to tri-axle dumps truck (no trailers). From time to time, the government shall draw from the building 5 salt storage bin. Notification will be provided prior to government draw. The contractor shall maintain an adequate supply on site. 9. All equipment shall have operable snow removal lights, day time and night time running lights. Lights shall be used whenever equipment is in operation. 10. Contractor personnel shall wear appropriate personal protective equipment while performing contract work (Shows, eye protection, coats, hats, gloves, High visibility vests, etc.). 11. For off-site snow haul services, the Contractor may stage snow removal equipment on site and at the contractor s own risk. Locations is the VA contractor s parking lot and VA lot 9. Equipment shall be removed from the site prior to normal business hours. The area is shared space. Equipment shall be protected against unauthorized access. 12. On site Snow and Ice Removal. The contractor shall provide snow removal, (including drifts, piles and ice) the full width of roadways, parking lots, parking garages, walkways, landings, stairs, entrances, perimeter walkways, fire hydrants, Siamese connections, site emergency generators and building transformers. Areas shall be free of snow and ice and shall be treated with rock salt and ice melt to provide safe travel for vehicles and pedestrians. Rock salt and ice melt material shall be granular. Contractor shall spread product uniformly and in sufficient quantity to cover and melt the snow or ice for the area. 13. For onsite snow removal, the contractor shall move and efficiently stockpile snow on site. Areas are marked on attached site plan. Stockpiles shall consist of on-site snow that has been removed from on-site parking lots, roadways, garages, walkways and entrances. Once stockpile areas are full, the contractor shall remove stockpiled snow offsite. 14. Offsite snow removal, the contractor shall schedule removal with the VA COR, the contractor shall load; haul, off load and dump snow at an approved offsite snow dump. 15. The off-site snow loading and hauling option shall be provided off hours, Saturday, Sundays and Holidays. 16. All trucks and motor vehicles shall possess a valid registration (any state) and insurance for the intended use. 17. Truck, motor vehicle and equipment operators shall possess valid licenses to operate. Provide copy of license and proof of training to COR. 18. Provide copy of equipment safety inspections to COR prior to use. 19. Snow dump shall meet Massachusetts Department of Environmental Protection regulations and be approved by the State and local municipality as a snow dump. 20. Submit address of snow dump with a map of location with the intended haul route. 21. Prior to submitting invoice provide all required written documentation. In addition to licensure, safety inspections, insurance and registration, provide the following: equipment logs, operator logs and dump tickets. All logs and tickets shall identify equipment, operator, quantity, location with date and time(s), start and stop times. Contractor shall certify that written documentation has been reviewed for accuracy and is complete. 22. The COR and VA Grounds foreman shall be the VAMC official responsible for monitoring contract compliance. Monitoring mechanisms shall include: written documentation; reports and locations of all complaints regarding surfaces; verification of quantities for rock salt and ice melt treatment (cu yards material and quantity of spreaders used); log of equipment on site and in use with full name of operator; registration, model and size of equipment, trucks and loader(s); and verification that the contractor has completed and provided all written documentation. 23. Prior to invoicing, the contractor shall provide the COR with a log that shows the following: name of each contract personnel; equipment description; equipment quantity; plow size with corresponding plate number; truck size with corresponding plate number; approximate time load left site; Approximate time of delivery to dump; approximate quantity of load; driver full name and total snow removed (cubic yards) for the day. A print out of the applicable snow total from the National Weather Service is required to be submitted with all invoices. 24. The VA Jamaica Plain is an active medical center. Contractor shall exercise care and courtesy in order to minimize impact on medical center operations. 25. The parking lots, roadways and site are utilized by patients, staff, public and contractors. The off-site snow haul operations, shall be conducted off hours, weekends and holidays. Work areas shall be restored at the completion of work each day. Material, debris and tools shall be removed from the work site and secured. 26. Ice removal of grounds including handrails 27. Smoking: VA grounds and buildings are smoke free. Smoking is prohibited on site. 28. Dispose of waste and debris in accordance with NFPA 241. Remove from the building daily. 29. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with VA COR and facility Safety Manager. 30. Contractor is authorized the use of the medical center public restroom at building 1, B wing, basement. 31. After entering a building, the contractor shall mop, clean and dry internal areas after use by its employees or contractors. This is to prevent patient and staff slips and falls. 32. Contractor shall have on hand its own spill clean-up kits for fuel, oil or solvent spills. Report all spills immediately to the COR and VA Grounds Foreman. 33. Security Procedures: Contractor s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. No photography of VA premises is allowed without written permission of the Contracting Officer. c. VA reserves the right to close down or shut down the project site and order General Contractor s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. 34. Fire Safety-Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only. a. American Society for Testing and Materials (ASTM): E84-2007 .............................Surface Burning Characteristics of Building Materials b. National Fire Protection Association (NFPA): 10-2006................................Standard for Portable Fire Extinguishers 30-2003................................Flammable and Combustible Liquids Code 51B-2003 .............................Standard for Fire Prevention During Welding, Cutting and Other Hot Work 241-2004..............................Standard for Safeguarding Construction, Alteration, and Demolition Operations c. Occupational Safety and Health Administration (OSHA): 29 CFR 1926 .......................Safety and Health Regulations for Construction Place of Performance: 150 SOUTH HUNTINGTON AVE, BOSTON, MA 02130 Period of Performance: One(1) base year plus four(4) option years. The options may or may not be exercised. Responses to this sources sought will be used by the Government to make appropriate acquisition decisions. After review of the responses to this sources sought, a solicitation announcement may be published. Responses to this sources sought notice are not considered adequate responses for a solicitation announcement. Responses to this sources sought/RFI are due by 12 pm EST time on October 14, 2020. Responses to this notice shall be submitted via email to contact@example.gov. Telephone responses shall not be accepted. If a solicitation is issued it shall be announced at a later date, and all interest parties must response to that solicitation announcement separately from the responses to this request for information. Responses to this notice are not a request to be added to a prospective bidders list or to receive a copy of the solicitation. The NAICS code for this requirement is 561730 and a small size standard of $8,000,000.00.

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 238990
New
Federal
Replacement-in-Kind Repair of Existing Perimeter Security Fence (Ameristar Impasse Trident) Brand Name or Equal
Solicitation # 36C24127Q0041
The Department of Veterans Affairs VA Boston Healthcare System is soliciting a contract for a localized replacement-in-kind repair of the perimeter security fence at the Brockton VA Campus in Massachusetts. The project focuses on restoring five affected fence bays and six associated post locations that were damaged by winter snow-removal activities. The objective is to return the damaged sections to their original alignment, configuration, appearance, structural stability, and security function. The benchmark product is the Ameristar Impasse Trident system, and while genuine components are preferred, equal alternatives may be proposed if they meet all salient characteristics, including the use of corrosion-resistant tamper-resistant hardware and the maintenance of a continuous security boundary. This procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238990. The period of performance is scheduled from December 1, 2026, to January 31, 2027. Award decisions will be based on the most advantageous offer, considering price, technical capability, and past performance, with a requirement for three relevant references. Proposals must be submitted in three separate PDF volumes (Technical, Past Performance, and Price) to the contract specialist by November 5, 2026. Final acceptance is contingent upon a satisfactory installation inspection, which may include a review by VA Police to ensure operational security.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS