San Bruno Creek Detention Basin Flap Gate Installation DDO (EA 4X110)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation Caltrans District 4 is seeking to implement the San Bruno Creek Detention Basin Flap Gate Installation project, identified as EA 4X110. Located on SR-380 at post mile 6.22 in San Mateo County, the project aims to mitigate flooding on 7th Avenue caused by tidal backflow during King Tide events. The scope of work includes removing debris from the outfall and detention basin and installing a flap gate at the 24-inch pipe outlet to prevent creek water from flowing back into the basin. Temporary traffic control will be implemented throughout the construction process to ensure public safety. The project is classified as a forecast with a posted date of August 8, 2025, and is categorized as exempt under the California Environmental Quality Act CEQA pursuant to 14 CCR 15301 Class 1(c) for existing facilities. Juliane Smith, a Senior Environmental Scientist with Caltrans District 4, serves as the primary point of contact. While the project is situated in San Bruno, California, the provided documentation does not specify a contract value, formal period of performance, or specific evaluation factors for award. All work is expected to follow standardized Caltrans practices for existing facility maintenance.

General Info

Install flap gate at San Bruno Creek detention basin to prevent tidal flooding, remove debris, exempt under CEQA.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Bruno, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for San Bruno Creek Detention Basin Flap Gate Installation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
The California Department of Transportation (Caltrans) proposes to remove debris and install a flap gate adjacent to the San Bruno Creek Detention Basin in San Mateo County on SR-380 at post mile 6.22. The detention basin attenuates stormwater runoff from portions of the interchange and adjacent streets prior to discharging into San Bruno Creek. A 24-inch pipe outlet connects the basin to the creek. During the recent King Tide events, 7th Avenue on the west side of the detention basin was flooded since it is in a low-lying area. This project will install a flap gate at the outlet to prevent backflow from the creek into the detention basin. Debris from the outfall and detention basin will also be removed. Traffic control will be implemented during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS