Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

San Diego Retreat Meditation Walk at Bayside Park in Chula Vista

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Retreat Meditation Walk at Bayside Park is a proposed three-day event in Chula Vista, California, scheduled for August. Organized by Encephalon Inc. and approved by the San Diego Unified Port District, the event consists of two morning sessions and one evening session each day, with an anticipated attendance of approximately 1,000 people. Participants will walk from the southeastern side of Bayside Park northwest along the Bayshore Bikeway, concluding the route at the Gaylord Pacific Resort and Convention Center. The event is designed to maintain public access to the promenade, requiring no road closures or dedicated staging parking, with participant parking available at the Gaylord Pacific facility. From a regulatory standpoint, the project is classified as a forecast and is categorically exempt under California Environmental Quality Act Guidelines Sections 15301 and 15323, as well as SDUPD Section 3.d. No significant impacts on air quality, greenhouse gas emissions, or traffic are anticipated. The applicant is responsible for adhering to all federal, state, and local laws regarding stormwater, hazardous materials, and construction demolition debris. Administrative processing was handled through the San Diego County Clerk's Office, with the San Diego Unified Port District serving as the lead agency.

General Info

Three-day meditation walk in Chula Vista Park, 1,000 participants, no road closures, parking at Gaylord Pacific.

Place of Performance

Chula Vista, CA, 91910

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Kelly SpragueEvents Director
Betsy ViramontesPlanner I

Full Description

Show more
The proposed project is the San Diego Retreat Meditation Walk at Bayside Park in the city of Chula Vista, California. All event participants would begin the walk on the southeastern side of Bayside Park and walk northwest along the Bayshore Bikeway and finish the walk by looping back towards Gaylord Pacific Resort & Convention Center (Gaylord Pacific). The proposed event would take place over three (3) consecutive days in August and consist of approximately two (2) hour sessions each day: two of which would be held in the morning and one (1) in the evening. Event attendance is anticipated to be approximately 1,000?people. During the event, the promenade shall remain open and available for use. Parking for event participants would be available at Gaylord Pacific. There would be no road closures during the event, and no parking spaces would be required for event staging. Impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Diego Unified Port District

Same awarding agency

NAICS: 237310
New
SLED
As-Needed Sweetwater Bike Path Hardscape And Maintenance Services
Solicitation # 26-23MA
The San Diego Unified Port District is soliciting responses for RFQ 26-23MA to provide as-needed inspection and routine maintenance for the Sweetwater Bike Path and associated hardscape surfaces. The scope of work covers facilities across San Diego, Coronado, National City, Chula Vista, and Imperial Beach, focusing on asphalt crack sealing, minor surface patching, localized pavement preservation, and the maintenance of concrete and decomposed granite surfaces. This agreement is for a five-year term with a tentative start date of July 1, 2027, and a total contract value not to exceed 1,000,000 dollars. Services are performed only upon the issuance of a written Task Authorization, and the provider must adhere to Caltrans traffic control guidelines and prevailing wage laws. The selection process is based on an evaluation matrix, reference checks, and negotiated pricing, with bonus points available for SBE status, veteran status, the employment of staff with disabilities, and the inclusion of ADA scope enhancements. The successful provider must maintain specific insurance levels, implement a comprehensive self-inspection program with yearly reporting, and ensure all employees and vehicles are clearly branded with the company logo. Emergency response requirements are stringent, requiring a response within one hour for immediate safety concerns and onsite performance within four hours, available 24/7. Submittals are due by December 9, 2026, via the eBid system.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238210
New
SLED
Electrical Retrofit Of Bayfront Parking Structure
Solicitation # 2025-22
The San Diego Unified Port District is soliciting bids for the Electrical Retrofit of the Bayfront Parking Structure located at 1 Park Blvd., San Diego, California. This single prime contract involves the demolition and removal of existing non-LED lighting and the installation of new LED lighting fixtures and light poles. The project is structured into a Base Bid covering the first floor, seventh floor, and all stairwells, with five additive bid schedules for the second through sixth floors. To ensure the facility remains operational, the contractor must maintain at least 80 percent of the building floor for public access at all times and ensure continuity for ADA parking, pedestrian egress, and emergency vehicle access. The contract will be awarded to the lowest responsive and responsible bidder. Applicants must demonstrate experience by providing at least two similar projects involving electrical equipment testing, commissioning, and medium-voltage wiring. Required submission documents include a bid bond, noncollusion affidavit, bidder's statement of experience, and certifications for worker's compensation, the Americans with Disabilities Act, and the False Claims Act. Compliance requirements include adhering to prevailing wage rates, utilizing LCPTracker for certified payrolls, and following NETA ATS standards for electrical power equipment testing. Electronic bids are due by December 1, 2026, at 2:00 P.M.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

4 days ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS