Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Sanitary Sewer Main Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Carrollton is seeking a subcontractor to install a new 8-inch sanitary sewer main line along with associated manholes, requiring the reconnection of existing sewer services and coordination of utility relocations. This project involves the replacement of aging infrastructure with new piping to enhance system capacity and reliability, ensuring compliance with sanitary standards and minimizing future disruptions. Work must include careful handling of existing utilities and restoration of affected areas to original or approved conditions following construction. The solicitation was posted on July 10, 2026, with a response deadline of August 11, 2026, at 3:00 PM. The project falls under NAICS code 237110 for sewer and utility line construction and is classified as a subcontract opportunity. The work is to be performed within the jurisdiction of the City of Carrollton, Georgia, though specific location details are not provided in the posting. Interested parties must submit proposals by the stated deadline, and all work must adhere to relevant municipal codes and construction standards without specified set-aside provisions.

General Info

Install 8-inch sanitary sewer main, manholes, reconnect services, restore areas, Carrollton Georgia.

Agency

Georgia → City of CarrolltonView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Carrollton
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Carrollton
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of new 8-inch sanitary sewer main piping and manholes, including reconnection of existing services and utility relocations.

Similar Contracts

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle's Aviation Project Management Group is seeking to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This project focuses on preserving the aging water infrastructure through a minimally invasive rehabilitation method that eliminates the need for extensive excavation, ensuring continued service while reducing disruption to surrounding traffic and facilities. The work will involve lining the existing pipeline with a resin-saturated felt tube that is cured in place to form a durable, seamless new pipe within the old one. The solicitation is posted as a forecast with a NAICS code of 237110, indicating it falls under underground petroleum and natural gas pipeline construction, which aligns with utility rehabilitation efforts. No set-aside provisions have been specified, and the project will be managed by the Port of Seattle, with Moraa Omwega serving as the primary point of contact and Ray Moreno as the project manager. All performance is expected to occur within the vicinity of the Airport Expressway, though exact geographic details are not provided. Interested parties should review the full solicitation details on the Port’s official portal for submission requirements, timelines, and technical specifications.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details