Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SB Minor B 05A2704 Culvert Liners and Culvert Repairs in Kern County

Closed
05A2704State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
General Paving and Drainage Pricing Agreement
Solicitation # PD 25-26.113
Solicitation PD 25-26.113 is an Invitation to Bid issued by Escambia County, Florida, for a General Paving and Drainage Pricing Agreement to replace contract PD 22-23.126. The agreement establishes a framework for various as-needed projects, including drainage, roadway widening, resurfacing, dirt road paving, traffic calming, and community improvement projects. To be eligible, contractors must hold a General Contractor’s or Underground Utility Contractor’s License. A key constraint of the agreement is that no single project may exceed a total value of $250,000, and no more than 25 percent of a project's value may consist of Balance-of-Line items. The contract has an initial term of 36 months, with options to renew for two additional 12-month periods, totaling a maximum of 60 months. Award decisions will be based on the lowest responsive and responsible bid, with the possibility of multiple awards. Selected contractors must mobilize within 10 days of a Notice to Proceed and provide performance and payment bonds within 10 days of a project award. Bidders are required to submit firm unit prices and provide various certifications, including anti-human trafficking affidavits and certifications regarding scrutinized companies. Following several extensions due to Hurricane Isaias, the final response deadline is November 13, 2026, at 9:30 am CST, with submissions required electronically via the OpenGov portal.
Purchasing

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
General Aviation Apron Rehabilitation
Solicitation # 7385 25
The Hillsborough County Aviation Authority is soliciting bids for the General Aviation Apron Rehabilitation project at Tampa International Airport, identified as Project Number 7385 25. The project aims to restore a 34-year-old asphalt apron in the Fixed Base Operators area that has exceeded its structural design life and exhibits widespread weathering. The scope of work includes milling and overlaying asphalt surfaces, adjusting or removing tie-downs, reestablishing pavement markings, and modifying airfield signage. The estimated value includes a base bid of approximately 100 million dollars, a subdivision bid of 50 million dollars, and an additive alternate of 50 million dollars. Bids must be submitted electronically via the e-Procurement Portal by November 16, 2026, at 2:00 p.m. E.T. The anticipated Notice to Proceed date is January 4, 2027. Qualified bidders must provide a bid bond, financial statements, and a current contractor's license, while certifying compliance with E-Verify, non-collusion, and anti-human trafficking laws. Performance will be monitored through a Contractor Quality Control Program, with the Construction Manager handling all quality assurance testing. The contract incorporates FAA Construction Contract Clauses for federal grant funding and requires adherence to Davis-Bacon wage rates and Equal Employment Opportunity standards.
Procurement

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
SLED
Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project
Solicitation # IFB27-0003
The City of Orlando is soliciting sealed electronic responses for the Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project (IFB27-0003). This infrastructure project involves roadway and pedestrian improvements across approximately 2.6 miles between State Road 527 (Orange Avenue) and Bennett Road. The scope includes drainage, landscaping, lighting, signalization, signing, and pavement markings, with a requirement for all work to meet ADA compliance and the Trench Safety Act. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Submissions must be uploaded via the OpenGov portal by 2:00 pm local time on November 19, 2026. The project timeline requires substantial completion within 1,095 days and final completion within 1,130 days, with mobilization required within 10 calendar days of the Notice to Proceed. Contractors must utilize the Critical Path Method for scheduling and adhere to FDOT Standard Specifications and the City of Orlando's Engineering Standards Manual. Key compliance requirements include the Davis-Bacon Act for wages, Build America, Buy America (BABA) sourcing preferences for steel and iron, and FHWA 1273 federal contract provisions. Payment is processed through signed Applications for Payment with a 20-business-day payment period, requiring surety consent and weekly certified payroll submissions. Successful bidders must provide performance and payment bonds and certificates of insurance within two weeks of the notification of intended award.
Public Works

POSTED

about 4 hours ago

DEADLINE

in 21 days

General Info

Documents

3

Addendum No 1 for County Change in DOT Procurement

PDF, High priority: read this firstamendment
High

California DOT Price Quote Proposal for Unit Items Contract 05A2704

PDF, High priority: read this firstprice-quote-proposal
High

Caltrans Solicitation 05A2704 Small Business Minor B Package

PDF, High priority: read this firstifpq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This is a SB Minor B Contract Advertisement.
The Contractor must be a certified Small Business under section 2-1.04.
The Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation.
DO NOT SEND A HARD COPY BID TO THE DIVISION OF PROCUREMENT & CONTRACTS. IT WILL NOT BE ACCEPTED.
Bid submittals will be accepted by email only at: contact@example.gov
If your bid is over $461,000.00 it will be rejected per Public Contract Code 10105(b).
Payment Bonds and Insurance will be required at time of Award if your Company is low bidder and awarded the contract.
The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request at http://bit.ly/dpac-ada or call +1 (555) 000-0000.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation is soliciting bids for Contract 07-381404 to modify existing traffic control signals on State Highway Route 213 at Del Amo Boulevard in the City of Torrance, Los Angeles County. The project has an estimated cost of 780,000 dollars and requires bids to be submitted on a unit price basis by November 17, 2026. The scope of work includes modifying signal and lighting systems, implementing temporary signal systems and pedestrian access routes, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. Contractors must also submit a Lead Compliance Plan and adhere to specific technical standards for electrical systems and roadside signs. Performance must begin within 180 days of contract approval, with a 72-hour notice required before starting job site activities. The contract mandates compliance with Buy America requirements for certain department-furnished materials, such as traffic controller cabinets and camera assemblies, and requires adherence to California prevailing wage rates. Quality assurance involves source inspections for equipment enclosures and functional testing of cameras in the presence of an Engineer. Administrative requirements include submitting payment information through the department's prompt payment monitoring system, with strict payment timelines for subcontractors and material suppliers.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS