Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on July 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SBU / SAC ADA Compliant Main Lobby Entrance Vestibules

Closed
SUNY-26/27-003MCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict material handling and labeling standards, particularly for wood products and electrical wiring. Compliance with the Americans with Disabilities Act, Buy American requirements, and prevailing wage rates for Glynn, Brantley, and McIntosh counties is mandatory. Proposals must be submitted electronically in separate price and technical volumes to the Contracting Officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, with evaluation factors including compliance with the Buy American Act. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and requires adherence to ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems. Quality assurance is managed through a multi-stage inspection process involving punch-out, pre-final, and final acceptance inspections. Monthly invoicing must be submitted via Wide Area Work Flow with required NAVFAC certifications and supporting documentation.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 25 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must comply with six specific GFEs, with several mandatory requirements for a bid to be deemed responsive. Specifically, proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be included in the bid package. Documentation for outreach efforts may be submitted up to three business days after the bid closing date. Failure to meet these specific GFE requirements will result in the bid being deemed non-responsive.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utilities. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties should contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the November 30, 2026, deadline.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, with Massachusetts state regulations prevailing if they are more stringent than federal requirements. The contract is a small business set-aside and requires a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a Massachusetts contractor's license, a W9, a completed vendor questionnaire, a wage rate certification, and a minimum 90-day bid guarantee. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Additionally, the selected contractor must provide payment and performance bonding for the full project value within ten days of award and maintain general liability insurance of at least one million dollars per occurrence. Pricing submitted in proposals must remain firm for 60 calendar days.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort with a duration of 1828 calendar days. The scope involves the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines, featuring reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. Technical requirements include extensive site preparation such as rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. The project also encompasses the installation of primary and secondary electrical distribution systems, telecommunications infrastructure, and the construction of access roads and paved loading areas, with specific requirements for wetland mitigation. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB, and is managed by J & J Contractors, Inc.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The State University of New York at Stony Brook is soliciting bids to replace the North and West Vestibules with new main lobby entrance vestibules that fully comply with ADA Standards for Accessible Design. The project requires complete labor, materials, equipment, and services delivered NET FOB Destination under Solicitation Number SUNY-26/27-003MC, with all terms governed by a comprehensive set of standard contract clauses, including affirmative action, non-collusive bidding, MWBE participation, vendor responsibility, prevailing wage requirements, and environmental recycling mandates. Proposals must be submitted by August 21, 2026, and attendance at the mandatory pre-bidders conference on July 20, 2026, is required for eligibility. All submitted bids will be evaluated for responsiveness, responsibility, and lowest cost, with the award going to the lowest qualified bidder whose proposal meets all specifications and compliance requirements. Prices must be fixed for the life of the contract with no price escalation or fuel surcharges permitted. The contract term is up to 540 days from the Notice to Proceed and requires approval from the New York State Attorney General and Office of the State Comptroller. All workers on site must hold valid OSHA 10-hour Construction Safety and Health certifications, and wage rates must conform to the NYS Department of Labor’s prevailing wage schedule identified as PRC#2026018648. The successful bidder must ensure all installations include unloading, assembly, testing, and debris removal, and must maintain adequate inventory and secure materials on-site. Payments are contingent upon receipt of properly formatted electronic invoices and certified payroll records upon request, with no payment permitted otherwise unless authorized in writing. Substitutions, pricing changes, or modifications are prohibited without prior University approval, and vendors must comply with all SUNY policies and state regulations, including recycling requirements and lobbying restrictions. The University reserves the right to reject any or all bids, negotiate terms, or make partial awards, and all proposals constitute a binding offer valid for 90 days after the submission deadline.

General Info

Replace vestibules per ADA, comply with prevailing wage, MWBE, OSHA, and SUNY contract terms by August 2026.

Documents

1

26/27-003MC ADA Compliant Main Lobby Entrance Vestibules IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState University of New York
Contacts1 person available
OfficeNY
Organization / AgencyState University of New York
Office AddressNY
Contacts
Jill Mccahill

Full Description

Show more
Overview: This Event is issued by the State University of New York at Stony Brook (herein after referred to as "SUNY”) to solicit proposals to provide all labor, material, equipment and services necessary to replace the North and West Vestibules with new main lobby entrance vestibules that will fully meet current ADA Standards for Accessible design at the State University of New York at Stony Brook, Stony Brook, NY 11794 services, as herein described delivered NET FOB Destination in accordance with SUNY at Stony Brook 26/27-003MC and Exhibits A (Standard Contract Clauses), A-1 (Affirmative Action Clauses), Exhibit D (Non-Collusive Bidding Certification), Exhibit M (MWBE Forms), Exhibit N (Subcontracting Form), Exhibit L (Procurement Lobbying Law), Exhibit SDVOB (Service-Disabled Veteran-Owned Business), Exhibit R (Certification Under Executive Order No.16), Exhibit T (ST-220) Exhibit V (Vendor Responsibility), Exhibit E (EO 177 Certification) , Exhibit H (N.Y. State Finance Law §139-l Certification), and PRC#2026018648 attached hereto and made part of this proposal. Background: Stony Brook University, part of the State University of New York system, is located 60 miles from New York City on Long Island's North Shore. Our 1,100-acre campus is home to almost 26,000 undergraduate, graduate, and doctoral students and more than 14,500 faculty and staff. Stony Brook University is a comprehensive research-intensive university and a member of the prestigious Association of American Universities (AAU). It consists of 12 schools and colleges and a teaching hospital that provides state-of-the-art healthcare in the Long Island region. The University consists of approximately 4,962,878 square feet of building space and over 16 miles of roadway. Key Events: Mandatory In-Person Pre-Bidders Conference/ Site Visit: July 20th, 2026 at 10:00 AM (SHARP) Conference Room A, Procurement Office, Research and Development Park Building 17, 1512 Development Drive, Stony Brook, NY 11794 Bidder Questions: Last day to post question to Q&A Board. All questions must be posted to the Sourcing Q&A Board to be considered. Question after the question period will not be addressed. July 29th, 2026 at 12:00 PM Proposals Due Date and Time: (Any proposal received after the deadline will not be considered) August 21st, 2026 at 12:00 PM RESTRICTED PERIOD: In accordance with the requirements of New York State Finance Law Sections 139j and 139k (“Lobbying Law”), the RESTRICTED PERIOD for this procurement is now in effect. Therefore, all communications regarding this procurement must be handled through Stony Brook University’s “Designated Contacts” ONLY. See Exhibit L for additional information. Please see below for the DESIGNATED CONTACT. Acceptance of Bid Content: The contents of the Bid and the Bidder’s response to this Bid shall become contractual obligations if a contract ensues. Failure of the Bidder to accept these obligations may result in the rejection of the Bidder’s response. Any additional vendor terms which are attached or referenced with a submission shall not be considered part of the bid or proposal but shall be deemed included for informational purposes only. SUNY reserves the right, in its sole discretion, to modify the above schedule. Bidders will be notified via email of any changes in a timely manner. Bidder Questions: Questions regarding the electronic bidding process should be directed to the Question and Answer board on the Sourcing System. DESIGNATED CONTACT: Jill McCahill Assistant Director of Strategic Sourcing +1 (555) 000-0000 contact@example.gov OR Taylor Nappie Contract Officer +1 (555) 000-0000 contact@example.gov All questions should be submitted on the Q&A Board citing the particular event section where applicable. Bidders should make efforts to ensure all questions are submitted no later than the date listed in the Key Events section as questions received after the closing date for questions may not be responded to prior to the proposal due date. Bidder identifying information will not be included in the response. Only answers posted on the Q&A Board are official. Responses to inquiries that substantially change or clarify the event in a substantial manner will be posted as an addendum. It is the responsibility of the Bidder to inquire about any requirement of this event that is not understood. SUNY will not be bound by oral responses to inquiries or written responses other than addenda. Mandatory Pre-Bidders Conference/ Site Visit: The Mandatory Pre-bidders Conference is scheduled for JULY 20, 2026 at 10:00 AM (SHARP) at Procurement, Conference Rm A, 1512 Development Drive, Research and Development Park, Building 17, Stony Brook, NY 11794-6010. **Failure to attend the Mandatory Pre-Bidders conference/site visit will result in rejection of your proposal.** Bid Opening: SUNY reserves the right to not hold a public bid opening or at any time to postpone or cancel a scheduled bid opening. In the event a public bid opening is scheduled, Bidders will be notified. If a public bid opening is not held, the University will release the names of the companies that submitted a bid and the unaudited total of each bid to those who submitted a bid. Method of Award (IFB): This IFB is part of a competitive procurement process designed to serve the best interests of the SUNY and the People of the State of New York. It is also designed to provide all bidders with a fair and even opportunity to have their products and services considered. SUNY will conduct a comprehensive review of each responsive bid submitted in accordance with the terms of this IFB. Award will be by grand total to the lowest responsible, qualified bidder who meets all qualifications and specifications. Bidder must respond as requested. Administrative Review: Each proposal received by the due date and time will be screened for completeness and conformance with requirements for proposal submission as set forth in this IFB. Cost Evaluation Phase: The lowest cost proposal needs to meet the bidder’s references and will be evaluated. The responsive and responsible Bidder submitting the proposal with the lowest prices/rates will be selected to contract with SUNY. The award shall be made by issuance of an award notice. SUNY contracts may be subject to approval by the New York State Attorney General and the Office of the State Comptroller. Bidder’s References Review: The lowest cost proposal after Administrative Review will advance to a committee to review the response to the Bidder’s References. Information provided in the proposal will be used to validate Bidder’s References and SUNY reserves the right to contact client references to validate required experience. If review of responses and reference checks determine the Bidder does not meet the Bidder’s References, the proposal will be deemed inadequate and will not be considered further. Finalist Review: In accordance with Section 163 (9) f of the NYS Finance Law, prior to making a contract award each contracting agency shall make a determination of responsibility of the proposed Contractor as discussed in Vendor Responsibility Section. SUNY will conduct a review of vendor responsibility for the Bidder earning the highest final composite score, and any proposed subcontractors. SUNY will consider any information that raises issues concerning the vendor’s responsibility, with consideration given to its relevance to the scope of work. The review will include factors such as financial and organizational capacity, legal authority, integrity and previous contract performance. Pricing Page Submission Instructions: Bidder must respond to all items as requested with a numerical value, otherwise the University reserves the right to consider the bid submission as non-responsive. No modifications may be made to the Pricing Page Submission Form. Bidders are encouraged to seek clarification during the question period. Modifications to the Pricing Page Response Form may result in disqualification. Items: Price shall be in accordance with the items listed or on the Cost Proposal Submission Form, if provided. No other charges, other than those listed in the items or on the Financial Proposal Submission Form shall be allowable under the agreement. Price Adjustment: The prices are to remain fixed for the life of the contract. There is no price escalation. The University will not accept any fuel surcharges or increases based on fuel. The Department of Procurement, Purchasing Section, will be the interpreter of all contract documents. FOB: Price shall be FOB (Free on Board) Destination, Freight Prepaid. Preparation Costs: Bidder is responsible for all costs, direct or indirect, that it incurs related to the preparation and submission of a proposal in response to this event. Prevailing Wage: Bidder agrees that their bid shall be submitted with the requirement that all wages paid to the workers shall be no less than the minimum prescribed by the New York State Department of Labor for the specific crafts used in the area where the work is performed. The NYS prevailing wage rate schedule is PRC# 2026018648 and is included in these specifications. See https://labor.ny.gov/workerprotection/publicwork/PWContents.shtm. OSHA 10-hour Construction Safety and Health Course – S1537-A: This provision is an addition to the existing prevailing wage rate law, Labor Law §220, section 220-h. It requires that on all public work projects of at least $250,000.00, all laborers, workers and mechanics working on the site, be certified as having successfully completed the OSHA 10-hour construction safety and health course. Pricing: All prices and conditions must be included in the original proposal. Prices and conditions not included in the original proposal will be rejected. Quote Hold: The submission of a proposal constitutes a non-revocable, binding offer to perform and provide said services. Such binding offer shall be firm and not revocable for a period of ninety (90) days from event close date. Subsequent to such ninety (90) days, the proposal is subject to withdrawal communicated in writing and signed by the Bidder. Tax Exempt: SUNY is exempt from sales tax. All prices should be quoted without the sales tax. Standard Clauses: Any contract resulting from this Proposal shall include Exhibit A (Standard Contract Clauses), Exhibit A-1 (attached - the Affirmative Action Clauses), Exhibit D (Non-Collusive Bidding Certification), Exhibit M (MWBE Forms), Exhibit L (Procurement Lobbying Law), Exhibit T (ST-220), Exhibit V (Vendor Responsibility Questionnaire), Exhibit E (EO 177 Certification), and Exhibit H (N.Y. State Finance Law §139-l Certification), Exhibit R (Certification Under Executive Order No.16), the provisions of which shall take precedence over any provision in the Proposal. These clauses relate to, among other things, assignment of the contract, availability of funds, non-discrimination, affirmative action, non-collusion, worker’s compensation. Compliance: The successful Bidder shall comply, and shall cause each of its employees, agents, subcontractors and the employees and agents of such subcontractors, if any, to comply, with all applicable laws, ordinances, rules, orders, regulations, and requirements of Federal, State and Municipal governments, and all applicable rules, regulations and policies of SUNY, including the policies of Stony Brook University. University policies may be found at https://www.stonybrook.edu/policy/. Award Protest: Upon notification of the selection and award of the contract, the bidder or offeror whose bid or proposal was not selected as the successful bid or proposal is entitled to submit a Bid Protest in accordance with SUNY’s Contracts Award Procedure (Document # 7561). The SUNY’s Protest Procedure is available at http://www.suny.edu/sunypp/documents.cfm?doc_id=699. The University's Protest Officer is Assistant Vice President Procurement Services, RSS Bldg., Stony Brook, NY, 11794-6000. The Appeals Officers is Vice President for Finance & Administration, Administration Bldg., Rm 221, Stony Brook NY, 11794-1002. Contract Term: The term of this agreement shall be within 540 days after the date of the Notice to Proceed. For the contract to be effective, the contract requires the approval of the New York State Attorney General and Office of the State Comptroller. Legislature Changes: In the event any governmental restrictions are imposed which would necessitate alteration of the material, quality, workmanship or performance of the items and/or services offered in this proposal whatsoever, prior to their delivery or thereafter, it shall be the responsibility of the successful bidder to immediately notify the University in writing of the specific regulation which requires alteration. Upon acceptance of such alteration by the University, it shall be the responsibility of the successful bidder to give effect to such alterations in accordance with terms and conditions of the agreement entered into hereinafter. Any price adjustments occasioned due to any alterations shall be subject to the approval of the University. Parking and Other Regulations of the University: It will be the responsibility of the successful contractor to contact the Traffic Office at +1 (555) 000-0000 to make arrangements for parking passes or permits if required. Illegally parked vehicles are subject to ticketing and/or towing. Bidder will operate vehicles responsibly under campus rules and regulations and will not park vehicles in unauthorized areas. Illegally parked vehicles will be towed. Successful bidder will abide by all the applicable rules and regulations of the University, and breach whereof shall make vendor liable under such rules and regulations. Recycle Clause: In accordance with the provisions of Section 177 of the State Finance Law, the State University is required to purchase recycled products, if available, made with significant recycled content in accordance with standards established by the State Department of Environmental Conservation. The law provides that if the price of a recycled product is within 10% of the price of a comparable product made without significant recycled content, or within 15% of such comparable product if the recycled materials used in such products are generated in New York State, the recycled product must be purchased. If you believe any products you will provide hereunder should be considered as qualifying recycled products under this law, please attach a copy of the authorization from the Department of Environmental Conservation confirming that such product has been approved for inclusion in the State recycling program. In the absence of such written confirmation, the product(s) will not be considered as qualifying for purposes of determining the selected vendor hereunder. Payment Terms: Payments under the resulting contract award shall be made to the Contractor, upon receipt of goods/services and properly approved and completed valid and proper invoice/s (Go to attached link to ensure you are meeting New York State proper invoicing requirements: https://osc.state.ny.us/agencies/guide/MyWebHelp/Content/files/XII.4.Fatt.pdf) and State of New York Department of Labor, Bureau of Public Works, Certified Payroll submitted to the attention of Accounts Payable, SUNY at Stony Brook. Payment may be withheld if a contractor has outstanding data, sales or MWBE reports. The Contractor shall provide complete and accurate billing valid and proper invoice/s to the University in order to receive payment for its services. Billing valid and proper invoice/s submitted to the University must contain all information and supporting documentation required by the University and OSC (All valid and proper invoice/s must be submitted with contractor’s Federal ID number). Payment for valid and proper invoice/s submitted by the Contractor shall only be rendered electronically unless payment by paper check is expressly authorized by the Vice President for Administration or designee, in her/his sole discretion, due to extenuating circumstances. Such electronic payment shall be made in accordance with ordinary New York state procedures and practices. The Contractor shall comply with the OSC procedures to authorize payments. Authorization forms are available at the OSC website at www.osc.state.ny.us/vendors/index.htm, by email at contact@example.gov or by telephone at +1 (555) 000-0000. The Contractor acknowledges that it will not receive payment on any valid and proper invoice/s submitted under this contract if it does not comply with the OSC’s electronic payment procedures, except where the Vice President or designee has expressly authorized payment by paper check as set forth above. Customs Clearance: If the product is being manufactured in another country and will require customs service, the cost of such service and any applicable importation fees shall be born by the vendor and incorporated in the price bid. Date/Time Warranty: Contractor warrants that Product(s) furnished pursuant to this Contract shall, when used in accordance with the Product documentation, be able to accurately process date/time data (including, but not limited to, calculating, comparing, and sequencing) transitions, including leap year calculations. Where a Contractor proposes or an acquisition requires that specific Products must perform as a package or system, this warranty shall apply to the Products as a system. Where Contractor is providing ongoing services, including but not limited to: i) consulting, integration, code or data conversion, ii) maintenance or support services, iii) data entry or processing, or iv) contract administration services (e.g., billing, invoicing, claim processing), Contractor warrants that services shall be provided in an accurate and timely manner without interruption, failure or error due to the inaccuracy of Contractor’s business operations in processing date/time data (including, but not limited to, calculating, comparing, and sequencing) various date/time transitions, including leap year calculations. Contractor shall be responsible for damages resulting from any delays, errors or untimely performance resulting therefrom, including but not limited to the failure or untimely performance of such services. Reserved Rights: SUNY Reserves the right to: Reject any and all proposals received in response to this IFB, make a contract award in whole or in part. Make no contract award. Reject any or all portions of any proposal, to negotiate terms and conditions consistent with this IFB and to make an award for any or all remaining portions. Withdraw the IFB at any time, at SUNY’s sole discretion. Disqualify any Bidder whose conduct or proposal fails to conform to the requirements of the IFB. Use proposal information obtained through site visits, management interviews and the state’s investigation of a Bidder’s qualifications, experience ability or financial standing, and any material or information submitted by the Bidder in response to SUNY’s request for clarifying information, in the course of evaluation and/or selection under the IFB. Prior to the bid opening, amend the IFB specifications to correct errors of oversights, or to supply additional information, as it becomes available. Upon University request, Prospective Bidder shall provide certified and/or non-certified audited financial statements with a letter from a CPA firm that GAAP was followed and they are not aware of any material misstatements for the past three (3) completed fiscal years, and/or other appropriate supplementation including, but not limited to, interim financial statements and credit reports as evidence of its ability to meet the service and requirements of the SUNY Stony Brook. Request references and contact any or all references and perform other related due diligence. Adjust or correct cost or cost figures with the concurrence of the Bidder if mathematical or typographical errors exist. Waive requirements or amend this IFB upon notification to all Bidders. Mandatory requirements may be eliminated if unmet by all Bidders. Negotiate with Bidders responding to this IFB within the requirements necessary to serve the best interests of SUNY. Require clarifications from Bidders for purposes of assuring a full understanding of responsiveness, and permit revisions from all Bidders determined to be susceptible to contract award prior to award. Miscellaneous Instructions: Delivery: Deliveries made to the University departments must be pre-established with the departments prior to orders being submitted to suppliers. Locations: Failure of contractor to familiarize him/herself with each separate location will not relieve contractor from responsibilities under the resulting contract award Installation: Delivery shall include unloading, moving to point of use, uncrating, assembling, complete installation, adjusting, connecting all services, testing, demonstrating and leaving ready to operate to the full extent of its design capabilities. Debris Removal: All accumulated debris, cartons, packing, etc. stemming from the installation shall be removed and disposed daily in the Contractor’s trash receptacles. Use of SUNY trash receptacles will not be allowed. Ordering: SUNY must be able to return, change, or cancel orders at any time before shipment without penalty or up to seven (7) days of receipt of delivery for any reason including, but not limited to, contractor error, damaged goods, “decided we don’t need,” etc. The terms of goods returned after seven (7) days will be mutually agreed upon by both parties. The Contractor shall honor all manufacturers’ guarantees. Inventory: The Contractor shall stock adequate inventories to service SUNY. Material and Equipment: Security of contractor’s material and equipment shall be the responsibility of the contractor. Payroll Documentation: SUNY and the New York State Department of Labor (NYS DOL) reserve the right to request Certified Payroll documentation for any work performed on this contract from the Contractor. SUNY does not require submittal of Certified Payroll documentation with invoicing; however, the Contractor shall provide such documentation immediately upon request. Substitutions: During the contract, substitutions will not be made without the approval of the University. In order to access the bid documents you will need to register your company on our web-based solution powered by Jaggaer: Jaggaer Supplier Registration: https://solutions.sciquest.com/apps/Router/SupplierLogin Public Site URL: https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=SUNY Tutorial Video on registration process https://www.youtube.com/watch?v=EPwSanSotkw Bid Opportunities https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=SUNY

More opportunities from State University of New York

Same awarding agency

New
SLED
AV Upgrade Math 1-125 SBU IFB AV IT Category
Solicitation # 222692510
The State University of New York at Stony Brook has issued solicitation number 222692510 as an Invitation for Bid for an audiovisual upgrade at Math Tower Room 1125. The project requires the selected vendor to provide all necessary services and equipment, with the award being granted to the lowest responsible, qualified bidder based on the grand total. The evaluation process involves an administrative review for completeness, a cost evaluation, and a subsequent technical review including bidder references, information security, and accessibility assessments. Finalists are further vetted for financial and organizational capacity, legal authority, and past performance. Bids must be submitted electronically via the Jaggaer platform by November 19, 2026, and must include numerical values for all items to be considered responsive. The contract stipulates that pricing is FOB Destination, Freight Prepaid, and payments will be rendered electronically upon receipt of valid invoices and approved services. Key administrative requirements include the submission of quarterly spend reports to the Contract Officer, compliance with New York State recycled product standards under Section 177 of the State Finance Law, and the potential requirement for certified payroll documentation. Additionally, the university maintains the right to return change orders without penalty within seven days of delivery.

POSTED

4 days ago

DEADLINE

in 20 days
View Details
NAICS: 238990
SLED
SBU / Engineering Research Center at Heavy & Old Engineering
Solicitation # 26/27-022MC
The State University of New York at Stony Brook is soliciting proposals for solicitation number 26/27-022MC to provide all labor, materials, equipment, and services necessary for the installation of equipment at the SBU Engineering Research Center at Heavy and Old Engineering. The scope of work includes delivery NET FOB Destination, unloading, assembly, connection of services, testing, and demonstration to ensure equipment is fully operational. The contract term is 180 days from the Notice to Proceed. Contractors are strictly required to remove all installation debris daily using their own receptacles and must provide certified payroll documentation upon request. The award will be granted based on the grand total to the lowest responsive and qualified bidder following a multi-phase review consisting of administrative screening, cost evaluation, reference checks, and a final vendor responsibility determination. Bidders must attend a mandatory pre-bidders conference on November 5, 2026, and submit proposals via the electronic sourcing system by December 11, 2026. Compliance with New York State prevailing wage rate schedule PRC# 2026029431 is required, and for projects exceeding 250,000 dollars, all on-site workers must hold OSHA 10-hour construction safety health certification. Submissions must include various mandatory certifications, including non-collusive bidding, MWBE forms, and vendor responsibility questionnaires.
All Other Specialty Trade Contractors

POSTED

7 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS