SC Fire System Upgrade

Active
RFI_07102026-001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the upgrade of the existing Edwards EST-3 fire alarm system at the Supreme Court Building to a modern Edwards EST-4 system, ensuring continued compliance with national fire safety codes and maintaining reliable life safety operations. The project involves full replacement and integration of control panels, annunciators, FireWorks monitoring stations, networking components, and associated hardware, with all work required to be performed in accordance with NFPA 70, NFPA 72, NFPA 101, IBC, IFC, and OSHA standards. The contractor must conduct a mandatory site visit within 30 days of award to validate existing conditions against as-built drawings, submit detailed equipment and phased work schedules for government approval, and coordinate all activities to minimize operational disruption, particularly during Court sessions and special events. Work must occur primarily during off-hours—nights and weekends—with advance notice required for any noise-producing activities, and all personnel must undergo rigorous security clearance and background checks, including fingerprinting and E-Verify compliance. The contract is a firm-fixed-price agreement with a 360-day period of performance, extendable by up to six months if necessary, and includes comprehensive deliverables such as as-built documentation, operational and maintenance manuals, test reports, and training packages for both Architect of the Capitol staff and Supreme Court Police personnel. The contractor is required to provide on-site training using submitted documentation, obtain written approval for all submittals before proceeding with procurement or installation, and ensure that all equipment is delivered and staged according to strict federal site protocols, including mandatory prescreening at the Off-Site Delivery Center. Key personnel must hold NICET Level II certification and manufacturer-specific training on the EST-4 platform, and substitutions require 15 days’ written notice and government approval. Final acceptance is contingent upon successful testing, completion of all punch-list items, and submission of complete documentation, with a mandatory one-year warranty on all newly installed equipment and workmanship. All deliverables must be submitted electronically in Microsoft-compatible formats and are the property of the federal government upon submission.

General Info

Upgrade Supreme Court’s fire alarm system to EST-4 with strict compliance, off-hour work, security vetting, and 360-day timeline.

Agency

Architect Of The Capitol → Acquisition & Material Man DivisionView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Washington, DC, 20515, USA

Set-Aside

NONE

Documents

(1)

RFI 07102026-001 SC Fire System Upgrade

DOCother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArchitect Of The Capitol → Acquisition & Material Man Division
Contacts1 person available
OfficeWashington, DC, 20515, USA
Organization / Agency
Architect Of The Capitol → Acquisition & Material Man Division
View Agency Profile
Office AddressWashington, DC, 20515, USA

Full Description

Show more

The Supreme Court of the United States has a requirement for a contract for Supreme Court Building with a period of performance of a one-year base.



  1. PROJECT TITLE

Fire Alarm System Upgrade, SCBG


  1. Background

Established as a permanent office in 1876, the Architect is provided permanent authority for the care and maintenance of the United States Capitol based on Section 1811 of Title 2 of the United States Code.  The Architect is responsible for the maintenance, operation, development and preservation of 18.4 million square feet of buildings and more than 580 acres of land throughout Capitol Hill.  This includes the U.S. Capitol, House and Senate Office Buildings, the U.S. Capitol Visitor Center, the Library of Congress, the Supreme Court of the United States (SCOTUS), the U.S. Botanic Garden, the Capitol Power Plant, and other facilities.  The Architect also provides professional expertise with regard to the preservation of architectural and artistic elements entrusted to his care and provides recommendations concerning design, construction and maintenance of the facilities and grounds.


The SCOTUS’s existing fire alarm system is an Edwards EST-3 system that has reached the later stages of its service life. The system has two annunciators as well as two FireWorks stations. The EST-3 platform is no longer actively supported to the same extent as newer systems, and replacement parts, software support, and qualified service availability are becoming increasingly limited. For example, one of the existing fire alarm annunciator screens is non‑functional and no longer supported by the manufacturer. Replacement parts are no longer available. To maintain a reliable, code-compliant life safety system and to support long-term operational needs, an upgrade to the Edwards EST-4 fire alarm system is required. The EST-4 platform provides enhanced processing capability, improved system diagnostics, expanded networking and integration options, and ongoing manufacturer support. Upgrading to the EST-4 system will improve overall system performance, ensure continued compliance with applicable codes and standards, and provide a sustainable solution for future facility requirements.


  1. Scope of Work

The Contractor shall provide all labor, materials, equipment, tools, supervision, and services necessary to upgrade the existing Edwards EST-3 fire alarm system to a fully operational Edwards EST-4 fire alarm system. The work shall include, but is not limited to, furnishing, delivering, installing, programming, testing, and placing into service a complete EST-4 system that complies with all applicable codes, standards, and manufacturer requirements.


The Scope of Work includes the procurement and installation of all required fire alarm system components, including control panels, power supplies, interface modules, network components, and associated hardware. The Contractor shall coordinate removal, replacement, or reuse of existing devices as applicable to ensure full system functionality and compatibility with the EST-4 platform.


Work shall include updates, replacement, or reprogramming of annunciator panels as required to ensure proper operation, system visibility, and compliance with current code and operational requirements. The Contractor shall also integrate, reprogram, or update FireWorks graphical monitoring system, to ensure full compatibility with the new EST-4 system and accurate system representation.


The Contractor shall perform all required testing, including acceptance, to demonstrate that the system functions as designed. All work shall be performed in a manner that minimizes disruption to facility operations and maintains required life safety coverage throughout the duration of the project. The contractor shall also be responsible for training on-site personnel on the new system.


All associated work must be coordinated with the AOC and the Supreme Court Marshal’s Office. This includes but is not restricted to any necessary shutdowns, noise producing work, inspection and testing.


  1. Applicable Policies and Standards

The contractor shall comply with the following applicable documents in order to complete the scope of work outlined in the statement of work.


  • NFPA70 - NEC – National Electric Code
  • NFPA72 – National Fire Alarm and Signaling Code
  • NFPA101 – Life Safety Code
  • IBC - International Building Code
  • IFC - International Fire Code
  • OSHA CFR 1926
  • OSHA CFR 1910

In addition, all work shall comply with manufacturer installation requirements, recommendations, and best practices for the Edwards EST-4 fire alarm system and associated components, including annunciator panels and FireWorks systems.


The contractor shall not deviate from any of the above documents without express written approval from the contracting officer.


  1. TASKS
    1. Post Award Site Visit, Existing Conditions and As-Built Drawing Review

The contractor that is awarded this requirement must visit the building to conduct a site visit to review existing conditions, verify system configuration, assess device inventory, evaluate annunciator and FireWorks system requirements, and identify any constraints that may impact installation. The Contractor shall also review all original installation (circa 2004) as‑built drawings and bill of materials provided by the Government; however, it is the Contractor’s responsibility to verify all existing field conditions during the mandatory site walk. Any discrepancies between the drawings and actual site conditions shall be documented and brought to the Government’s attention prior to procurement or installation activities. The Contractor shall coordinate with the AOC to confirm system phasing, access requirements, and operational considerations.


The visit will be coordinated by the PM/COR and CO and will take place within thirty (30) days after contract award.


    1. Equipment and Schedule Submittals

The Contractor shall prepare and submit a complete equipment submittal package for review and approval prior to procurement and installation. Submittals shall include manufacturer data cut sheets, system architecture diagrams, network layouts, panel wirings, interface diagrams, annunciator updates, FireWorks system modifications, and any proposed deviations from existing configurations.


A preliminary draft materials list is provided in APPENDIX C solely for reference. This list shall not be considered complete or validated. The Contractor is fully responsible for independently verifying all system requirements, existing field conditions, as‑built drawings, and equipment compatibility before procuring any materials. Any purchases made without prior verification shall be at the Contractor’s own risk, and no additional cost to the Government will be accepted for discrepancies arising from Contractor‑failed validation.


In addition to equipment and technical documentation, the Contractor shall submit a detailed phased work schedule identifying sequencing of work, anticipated system impairments, duration of outages, and areas affected. The phased work schedule shall be designed to minimize fire alarm system impairments and limit outages to the smallest practical area and shortest duration possible.


All submittals, including the phased work schedule, shall be reviewed and approved in writing by the AOC prior to the start of installation activities. No installation work shall begin until written approval is received.


    1. Equipment Procurement and Delivery

Upon submittal approval, the Contractor shall procure all required Edwards EST-4 equipment and associated components. The Contractor shall coordinate delivery, staging, and storage of equipment in accordance with site requirements and manufacturer recommendations.


Due to limited storage capacity on-site, the contractor shall ensure that materials are delivered and directly installed. Deliveries must be coordinated to the installation site to avoid congestion and disruption.


All deliveries may be required to undergo prescreening. Deliveries may be rejected unless the vehicles have been processed and x-rayed at the Off-Site Delivery Center (OSDC) located at 4700 Shepherd Parkway SW, Washington, D.C. 20032. The hours of operation are 4:30 AM until 3:00 PM, Monday through Friday. The facility is closed on all Federal holidays unless specifically noted.


    1. System Installation and Configuration

The Contractor shall remove existing EST-3 components as required and install all EST-4 system components in accordance with approved submittals, schedule, manufacturer requirements, and applicable codes. This task includes mounting and wiring of control equipment, power supplies, network components, annunciator panels, and interfaces. The Contractor shall program and configure the system, including any required FireWorks system updates, to ensure full operational functionality.


    1. Test Plan Development, Substantial Completion Inspection and Final Acceptance Testing

The Contractor shall develop a detailed fire alarm system test plan outlining testing procedures, sequences, responsibilities, and acceptance criteria. The test plan shall be submitted to the AOC for review and approval prior to the start of testing. Additionally, prior to Final Acceptance Testing, the Contractor shall conduct a Substantial Completion Inspection. All parties shall participate in the inspection and the Contractor shall prepare a punch-list of outstanding work items, and items requiring re-work.


Upon approval of the test plan by the AOC and completion of the Substantial Completion Inspection punch-list items, the Contractor shall conduct final acceptance testing in the presence of the AOC. All deficiencies identified during the final acceptance test shall be corrected by the Contractor and retested accordingly.


    1. Documentation and Closeout Submittals

The Contractor shall provide complete system documentation upon completion of testing, including as-built drawings, system programming files, operation and maintenance manuals, manufacturer literature, warranty information, and test reports, in both hard copy and electronic formats as required by the government in Section 6.0.


    1. Onsite Training

The Contractor shall provide onsite training for AOC personnel covering system operation, basic troubleshooting, annunciator operation, FireWorks system navigation and routine maintenance.


The Contractor shall compile all training materials used for AOC training into a consolidated Training Documentation Package. This package shall be submitted to the Government and shall include the topics described above.


The Contractor shall also provide onsite training for Supreme Court of the United States Police Department (SCUSPD) first responders on covering system operation, annunciator operation, and FireWorks system navigation.


The Contractor shall compile all training materials used for the SCUSPD training into a consolidated Training Documentation Package. This package shall be submitted to the Government and shall include the topics described above. The SCUSPD’s Training Documentation Package shall be used as a quick reference guide for SCUSPD officers and be left at the Police Operation Center (POC)


    1. Final Acceptance and Warranty

Final acceptance shall occur upon successful completion of all tasks outlined in this Statement of Work, including installation, approved testing, documentation submittals, training and completion of all punch-list items. The Contractor shall submit Final Inspection Reports certifying that all work as specified is complete and the project is in conformance with building codes and that all punch-list items are complete.


All newly installed equipment, system components and workmanship shall be warranted for a minimum period of one (1) year from the date of final acceptance.


  1. Deliverables and Delivery SChedule 
    1. Kick-Off Meeting

The contractor shall schedule a virtual kick-off meeting within fifteen (15) days after contract award.  The meeting shall include an overview of the project team, scope of work, and next steps.


    1. Transition-In Plan

This section does not apply.


    1. Project Management Plan

This section does not apply.


    1. Weekly Status Report

This section does not apply.


    1. Senior Management Status Report

This section does not apply.


    1. Architecture Design Diagrams

This section does not apply.


    1. Government Furnished Equipment / Property (GFE/GFP) Inventory Report

This section does not apply.


    1. Transition-Out Plan

This section does not apply.


Table 1 - Deliverables and Delivery Schedule


Deliverable/Description


Type


Delivery Method(s)


Delivery Date/Frequency


Substantial Completion Inspection Punch-List (5.5)


Document


MS Word or MS Excel and PDF


Within 2 days of Substantial Completion Inspection


Final Document Submittal (5.6)


Document


MS Word and PDF


Within 7 days of final inspection of corresponding elevator


AOC Training Documentation Package (5.7)


Document


PDF pages in a binder


At the day of AOC training


SCUSPD Training Documentation Package (5.7)


Document


PDF pages in a binder


At the day of SCUSPD training


Final Inspection Report (5.8)


Document


MS Word and PDF


Within 2 days of Onsite Training


Kick-Off Meeting (6.1)


Virtual Meeting


Virtual Meeting


15 days after contract award


    1. Instructions for Delivery of Deliverables

The contractor shall provide all deliverables via electronic methods, unless directed by the COR to provide hard copies, for review, approval, and appropriate action.  Electronic copies shall be delivered via email attachment to the CO and COR as appropriate.  The electronic copies shall be compatible with Microsoft Office 2010 or other applications as appropriate and mutually agreed to by the parties.  Once created, deliverables and work products are considered the property of the Federal Government.


The deliverables shall be considered final upon receiving Government approval.  The Government shall provide written notification of acceptance or rejection of all deliverables within two days of receipt.  All notifications of rejection will be accompanied with an explanation of the specific deficiencies causing the rejection.  Deliverables must be approved by the CO and COR to be considered “accepted.”


Deliverables shall be deemed acceptable if the document adequately covers all required topics, meets general quality measures, and is professionally prepared in terms of accuracy, clarity, format, and timeliness.  Quality measures, as set forth below, shall be applied to each work product received from the contractor. 


  • Accuracy:  Documents shall be accurate in presentation, content, and style;
  • Clarity:  Documents shall be clear and concise;
  • Format:  Documents shall be transmitted via mutually agreed upon media; and
  • Timeliness:  Documents shall be submitted on or before scheduled due date.

  1. QUALITY ASSURANCE SURVEILLaNCE PLAN (QASP) / QUALITY CONTROL PLAN (QCP)

This section does not apply.


  1. Government Furnished Equipment / PROPERTY (GFE/GFP)

This section does not apply.


  1. CONTRACT TYPE

The selected contract type is a single-award, firm-fixed-price contract.


The Government will accept progress payment requests; however, all such requests must include copies of purchase receipts, invoices, or other proof of material and equipment procurement. Progress payments will be reviewed and approved by the Government prior to issuance, and incomplete documentation may result in rejection of payment. Advance payments or “deposits” are not approved and will be rejected.


  1. Period of Performance

The period of performance for this requirement shall be 360 days from the contract award date.


This requirement will also include an option to extend services to six months, if necessary, in accordance with FAR 52.217-8.


Should unforeseen delays occur, the period of performance may be amended or extended at the Government’s discretion through formal contract modification.


Contractor must also be aware of all scheduled Court or Special Event Days. Planned Court Days are red, blue or green colored dates shown on the anticipated October Term 2025 & 2026 Supreme Court Calendars. Contractors shall do everything in their power to minimize noise-producing work on Panned Court Days and Special Event Days.


All project schedules must be approved in writing by the Government before work can begin. All work must be coordinated to ensure timely completion within the designated seasonal windows.


  1. Place of Performance / HOURS OF OPERATIONS

Work under this requirement shall be performed at:


The Supreme Court of the United States


1 First Street, NE, Washington DC 20543


Daily work hours shall be approved by the COR; however, core working hours for the contractor for this requirement shall be outside of normal weekday business hours or weekends. Weeknight work is typically conducted from 10 PM – 6 AM. Any contractor under this contract shall be required to perform work during these hours unless otherwise authorized. Saturday work is typically conducted from 5 AM to 8 PM.


However, the site walk, and kick-off meeting can occur during normal weekday business hours.


Work may be cancelled with no advance notice to accommodate the Courts schedule on weekends.


The Contractor shall provide advance notification to the Government for all noise-creating work activities. Such activities include, but are not limited to, demolition, heavy equipment operation, rigging, drilling, cutting, or any work likely to generate disruptive noise. The Contractor must obtain Government approval prior to initiating any noise-creating tasks. In general, noise-creating work shall only occur before 8:00 AM, unless otherwise authorized in writing by the Government.


  1. TELEWORK

This section does not apply.


  1. Other Direct Costs (ODC)

Other direct costs are not authorized. Any change orders must be submitted and formally approved prior to any purchases being made.


  1. Travel

This section does not apply.


  1. KEY Personnel
    1. Program Manager

The Program Manager shall have overall responsibility of the contract activities to include planning, organizing, directing, controlling, staffing and reporting status, deliverables and schedules to the government.  The PM shall be a full-time corporate employee of the prime contractor.


    1. Installation Team

The contractor’s installation team shall consist of qualified personnel holding appropriate industry certifications, including NICET Level II (minimum) for fire alarm installation and testing. Team members must be trained and certified by the fire alarm system manufacturer for the Edwards EST-4 platform. Only technicians meeting these qualifications shall perform installation, programming, and system commissioning activities.


  1. SUBSTITUTION OF KEY PERSONNEL

Key personnel are critical to performance under this requirement.  During the period of performance, key personnel shall only be replaced with people of comparable education and experience levels.  The contractor shall obtain approval from the Government prior to replacement of any key personnel.


No changes in key personnel shall be made unless the contractor can demonstrate that the qualifications of prospective replacement personnel are equal to or better than the qualifications of the key personnel being replaced.  The CO shall be notified in writing of any proposed substitution at least 15 calendar days in advance of the proposed substitution.  Such notification shall include:


•     An explanation of the circumstances necessitating the replacement;


•     A resume of the proposed substitute that outlines their education, and basic and specialized experience; and


•     As requested by the CO or COR, any other information which will enable them to judge, whether or not the contractor is maintaining the same level of high-quality key personnel.


The Government will evaluate key personnel substitutions.  The CO will promptly notify the contractor of their approval or disapproval in writing.  All disapprovals will require submission of another substitution to fill key positions within 15 calendar days from the date the contractor was notified.


Additionally, the contractor shall immediately replace any individual under this statement of work who fails to perform their duties adequately, is chronically absent/late, or conducts themselves in a manner that is inconsistent with AOC policies and practices or engages in practices that are disruptive to the working environment.


  1. Personal Services

Personal services are not authorized under this contract.


  1. INVOICING

The contractor shall follow the invoicing instructions outlined in clause AOC52.232-1 when submitting invoices.  The AOC will approve or reject an invoice within 30 days.


  1. Security

All contractor employees will be required to submit clearance forms and IDs to the Supreme Court of the United States Police Department. Clearance forms will require Personal Identifiable Information (PII) such as names, date of birth, social security numbers, and residence of personnel assigned to visit the site.  All contractor employees may also need to be fingerprinted as part of the clearance process.


If requested by the Government, all contractor employees shall be prepared to submit an E-Verify form and a United States Capitol Police background check form (CP-491) prior to the performance of work.  Contractor employees may also need to complete a contractor badging request form. 


The AOC does not follow certain exceptions as described in the E-Verify federal contractor rule.  Contractors may be required to use E-Verify to verify that all employees working on AOC contracts are authorized to work in the United States.


All contractors working on site shall be required to wear an identification badge and/or contractor sticker at all times.  On site work may be interrupted because of Congressional events, Supreme Court of the United States events, Supreme Court of the United States Police requirements or U. S. Capitol Police requirements. All work to be performed is subject to government interruptions.


Onsite parking is not guaranteed.


  1. SAFETY

The contractor shall implement and maintain strict safety protocols throughout the duration of the work effort. All work shall be performed in accordance with all AOC safety policies, applicable OSHA standards, and site-specific safety requirements. The contractor shall require all employees to wear appropriate clothing apparel, including personal protective equipment (PPE), for the assigned tasks.  No sandals or any style of open toe shoes shall be allowed.


The Contractor shall conduct a safety briefing before starting work and provide appropriate PPE to all workers. Any incidents, near misses, or unsafe conditions shall be reported to the Government immediately.


  1. ENERGY EFFICIENCY / COMPLIANCE

There are no special energy efficiency requirements under this requirement.  The contractor shall minimize energy use while on a government site.


  1. SUSTAINABILITY

There are no sustainability considerations or concerns under this requirement.


  1. POINTS OF CONTACT

Contracting Officer


TBD at time of award


Contracting Specialist


TBD at time of award


Contracting Officer Representative


Contractor Representative


TBD at time of award


  1. APPENDIX A - aCRONYMS

CO                                Contracting Officer


COR                              Contracting Officer’s Representative


CUI                               Controlled Unclassified Information


GFE                              Government Furnished Equipment


MS                                Microsoft


ODC                             Other Direct Costs


O&M                            Operations and Maintenance


POC                              Point of Contact


POP                              Period of Performance


PM                                Project Manager


PPE                               Personal Protective Equipment


SCBG                           Supreme Court Building and Grounds


SOP                              Standard Operating Procedure



  1. APPENDIX B – CONFIDENTIALITY AGREEMENT

______________________________________ (“Contractor”) shall perform services pursuant to a contract between the Contractor and the Architect of the Capitol, in connection with work related to the Supreme Court of the United States. The Contractor agrees not to disclose, advertise, or otherwise use any confidential information except as necessary for the proper performance of its obligations under the contract. For the purposes of this agreement, “confidential information” shall refer to any information pertaining to the Supreme Court of the United States or its employees that is not publicly available through authorized channels of the Supreme Court. The Contractor further agrees that this obligation of confidentiality shall survive the termination or completion of the contract.



____________________________                            ____________________________


Signature                                                                                 Date


____________________________


Name (Print)


  1. APPENDIX C – DRAFT Material lIst

Appendix C has been removed from this Sources Sought notice due to sensitive content. The full appendix will be provided in the final solicitation to qualified contractors.












Instructions for Responding to this RFI:



1) Please provide a response to the following questions from the Government:



a) Would your company be interested in submitting a proposal for this contract in the event that a solicitation is issued?



b) Is your company able to perform this scope of work under its GSA Schedule contract? If so, please provide the applicable GSA Schedule contract number. Additionally, under which SIN is this type of work typically performed? If it falls under multiple SINs, please indicate which ones apply?



c) Please provide NAICS, and PSC.



c) What questions do you have for the Government? (You may either list your questions in the RFI response, or you may email the questions to Donald Fuqua at donald.fuqua@aoc.gov any time if it helps you to provide a better response with the answers known)



d) What is the typical duration of contracts for this type of work? In other words, what period of performance does the Government customarily establish for similar requirements?


e) Please provide examples of contracts from the past three years—either completed or currently ongoing—that involve the same or similar scope of work. For each example, please include the awarded contract dollar amount.


f) Any other information you believe will be of interest to the Government.



Please email responses to Donald Fuqua at donald.fuqua@aoc.gov by noon on April 24, 2023.



Thank you,



Donald Fuqua


Contracting Officer


Architect of the Capitol


Supplies, Services, and Material Management Division (SSMMD)


www.aoc.gov

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the full spectrum of design, permitting, and construction services required to install 50 high-resolution surveillance cameras across 43 distinct locations in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance security and operational oversight by replacing outdated systems with advanced imaging technology that supports detailed forensic investigations and enforces the Port’s movement rules and regulations. In the Bagwell area, the new camera network will expand coverage to include key drive lanes and entrances, areas currently under-monitored as existing units focus on conveyor systems and security doors. In the North Cargo Operations zone, the solution will introduce flexible, user-controlled Pan Tilt Zoom units to deliver dynamic, broad-area surveillance that adapts to varying operational needs. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for coordination. The effort aligns with NAICS code 238210 for electrical contractors and is posted as a forecast with no set-aside designation. The installation will significantly upgrade the Port’s existing security infrastructure, ensuring comprehensive visual monitoring of critical cargo movement corridors and operational zones to improve safety, accountability, and regulatory compliance. All work must be completed in accordance with Port requirements and timelines, with no detailed solicitation number yet assigned but available through the official portal link for ongoing updates.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Field Installation Supervision and Technical OversightThe contract involves on-site supervision of electrical installations for municipal park projects under the City of Issaquah, Washington, with a focus on ensuring quality assurance, adherence to applicable electrical codes, and seamless coordination with contracted vendors and crews. The work requires technical oversight to guarantee that all electrical systems are installed correctly, safely, and in full compliance with local and national standards. Supervisors will be responsible for monitoring progress, reviewing workmanship, identifying and resolving deviations, and serving as the primary point of technical contact between the city and field teams to maintain project integrity and timeline. This subcontract is open for bidding with a response deadline of August 14, 2026, and is classified under NAICS code 238210 for electrical contracting services. The work will be performed exclusively at municipal park sites within Issaquah, requiring a strong local presence and familiarity with regional building regulations. Although no specific set-aside provisions or point of contact are provided, interested parties must respond by the stated deadline to be considered for award. The contract emphasizes hands-on field presence over remote management, demanding experienced personnel capable of making real-time technical decisions and ensuring compliance under dynamic construction conditions.
City of Issaquah

POSTED

about 12 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238210
New
SLED
Temporary Electrical and Plumbing Services for EventsThe City of San Antonio Convention and Sports Facilities Department is seeking qualified electrical and plumbing contractors to provide temporary services for events at the Henry B. Gonzalez Convention Center, including the Lila Cockrell Theatre, and the Alamodome, including the Illusions Theater, with potential inclusion of future facilities. Contractors must be licensed and experienced in delivering safe, reliable temporary electrical and plumbing systems tailored to the unique demands of large-scale events. The solicitation, identified as RFQ26-108 and RFx 6100019795, falls under product categories 91438 for Electrical and 91468 for Plumbing, and all responses must be submitted by August 10, 2026, at 11:00 a.m. Central Time. A pre-submittal conference is scheduled for July 27, 2026, at 10:00 a.m. Central Time via Microsoft Teams, and while attendance is optional, it is strongly recommended for clarity on expectations and requirements. Proposals must demonstrate proven capability, adherence to safety standards, and the ability to respond promptly to event-specific needs. The contract will support operations for a variety of public and private events held within the designated venues, requiring contractors to be flexible, available on short notice, and fully compliant with all city codes and protocols. Questions regarding the RFQ should be directed to Stephanie Nouman or Troy Elliott through the contact details listed, and all submissions must be made through the designated Texas SmartBuy portal. The procurement is issued under the City of San Antonio’s authority, with performance expected within San Antonio, Texas, and no set-aside provisions are specified.
CITY OF SAN ANTONIO

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Architect Of The Capitol → Acquisition & Material Man Division

Same awarding agency

NAICS: 238290
New
Federal
Indefinite Delivery Indefinite Quantity (IDIQ) contract for Elevator, Escalator, and Accessible Lifts Maintenance, Repair, Inspection, and Modernization ServicesThe Architect of the Capitol is seeking a single award for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide comprehensive maintenance, repair, inspection, and modernization services for elevators, escalators, and accessible lifts across federal facilities in Washington, D.C. The contract has a base period of one year with four one-year options, potentially extending performance through five years, and includes a minimum guarantee of $10,000 with a maximum ceiling of $80,000,000. Task orders may be awarded as Firm Fixed Price, Labor Hour, or Time and Materials, and may extend up to one year beyond the final IDIQ ordering period. All work must be performed at locations within Washington, D.C., with the contractor required to maintain 24/7 availability to respond to emergency and non-routine conditions. Proposals must be submitted by August 10, 2026, at noon ET, and must adhere to strict formatting requirements including two separate volumes: a technical volume with no pricing and a price volume containing the SF33 and all cost data. Offerors must be registered in SAM with an active UEI and CAGE code, comply with all applicable FAR and AOC-specific clauses, and demonstrate compliance with labor standards including the Davis-Bacon Act and prevailing wage requirements. Evaluation will be based on a best value tradeoff process where technical merit—specifically Technical Approach, Corporate Experience, and Key Personnel—are pass/fail gates and must be rated “Acceptable” for a proposal to proceed to price evaluation, which is considered less important than the combined non-price factors. Key personnel requirements include specific roles such as Account/Program Manager, Senior Field Engineer/Supervisor, Mechanic/Adjuster, Elevator Construction Mechanic, and Helper, each with defined hourly ceilings for pricing purposes. The contractor must submit detailed deliverables including a Kick-Off Meeting, Transition-In and Transition-Out Plans, Weekly and Quarterly Status Reports, and comply with stringent documentation standards requiring editable, government-friendly formats. All submissions must include proof of insurance, security clearance compliance, E-Verify enrollment for personnel, and adherence to CUI handling protocols. Contractors are subject to government inspections at any time, must maintain comprehensive inspection records, and are responsible for correcting non-conforming work at their own expense. The contract incorporates multiple FAR and AOC-specific clauses covering gratuities, anti-kickback provisions, government property, warranty, termination rights, and liability limitations, with invoicing
Other Building Equipment Contractors

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541690
Federal
Comprehensive CCTV System Improvement PlanningThe contract seeks to develop a strategic improvement plan aimed at modernizing the Closed-Circuit Television System to enable 24/7 operational continuity, with a strong emphasis on risk mitigation, system redundancy, and alignment with current technology standards. The scope requires a comprehensive evaluation of existing infrastructure, identification of vulnerabilities, and the formulation of actionable recommendations to enhance reliability, scalability, and resilience across the CCTV network. The plan must address potential failure points, incorporate failover mechanisms, and ensure compliance with evolving security and technical benchmarks to support uninterrupted surveillance operations. The work is to be performed primarily in Washington, D.C., under the oversight of the Architect of the Capitol’s Acquisition & Material Man Division, with all deliverables due by August 24, 2026. This subcontract opportunity is classified under NAICS code 541690, indicating it pertains to other scientific and technical consulting services. Interested parties must submit proposals prior to the deadline, and while no set-aside designation is specified, the nature of the work suggests a need for specialized expertise in surveillance system modernization, cybersecurity integration, and large-scale operational planning within a federal environment.