SCE Encroachment Permit 12-25-6-US-0710

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Encroachment Permit 12-25-6-US-0710, managed by Caltrans District 12 in Orange County, authorizes the removal and replacement of one wood transmission pole on the BARRE-SHAWNEE-TRASK 66KV line. The project is located on the west side of Beach Boulevard in the City of Stanton, approximately 890 feet south of Chapman Avenue. The scope involves replacing a 70-foot pole with a new 75-foot pole, with all work occurring within a 50-foot buffer. The estimated project duration is two working days, and while no vegetation removal is required, traffic and pedestrian controls may be necessary. The project is categorically exempt under CEQA Class 1(b) and qualifies for a NEPA categorical exclusion. Compliance is required with Caltrans Standard Specification 14-9 (2024) for construction impacts, as well as the Encroachment Permit General Provisions (TR-0045) and Stormwater Special Provisions (TR-0400). Environmental mandates include adherence to the Caltrans Statewide NPDES Permit and the Statewide NPDES General Permit for Construction and Land Disturbance Activities. Strict protocols are in place for hazardous materials, requiring the submission of a Sampling and Analysis Plan and a Health and Safety Plan by a Certified Industrial Hygienist. Additionally, the permittee must stop work and notify the State Permit Inspector if contaminated materials or cultural and paleontological resources are encountered.

General Info

Replace 70-foot pole with 75-foot pole on BARRE-SHAWNEE-TRASK line, comply with Caltrans and environmental regulations.

Agency

California → Caltrans, District 12 - Orange

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

est side of Beach Boulevard, approximately 890 feet south of Chapman Avenue, Stanton, CA

Set-Aside

NONE

Documents

(1)

Encroachment Permit 12-25-6-US-0710 CEQA/NEPA Determination

PDFenvironmental-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Carmen LoAssociate Environmental Planner

Full Description

Show more
The Proposed Project is located on the BARRE-SHAWNEE-TRASK 66KV transmission line in the City of Stanton, Orange County, California. The Proposed Project consists of the removal and replacement of one (1) transmission pole. The existing pole has an AGL height of 70 feet. The replacement pole will have an AGL height of 75 feet. The Proposed Project is located along the west side of Beach Boulevard, approximately 890 feet south of Chapman Avenue.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
Repair, Maintenance, Replacement, Refurbishment, Installation, Testing, And Inspection Of Embedded Piping And Associated Piping Systems In Hydroelectric And Other Related Facilities
Solicitation # 10213669
The California Department of Water Resources is soliciting bids for as-needed repair, maintenance, replacement, refurbishment, installation, testing, and inspection of embedded piping and associated systems within the State Water Project. The scope of work supports 29 hydroelectric power and pumping plant facilities, focusing on water, air, and oil piping, as well as control wiring conduits typically ranging from 2 to 12 inches in diameter. The anticipated contract term is three years with an option for three additional one-year renewals. Performance will take place across several field divisions, primarily in Oroville, Byron, and Gustine, with occasional work in Bakersfield and Pearblossom. The contract will be awarded to the lowest responsible bidder meeting all specifications. Key requirements for bidders include registration as a Public Works Contractor with the Department of Industrial Relations, ASME Pressure Piping Certification, and the submission of a 10 percent bidder's bond. Additionally, a minimum 3 percent commitment to the Disabled Veteran Business Enterprise program is mandatory. Bidders must provide a Quality Assurance/Quality Control program, an Injury and Illness Prevention Program, and three customer references from the last five years. Payment is based on hourly rates for various labor classifications, with purchased materials and subcontracted work invoiced at cost plus 15 percent. Hourly rates are subject to escalation on July 1 of 2027, 2028, and 2029 based on the US Department of Labor Employment Cost Index. Bids are due by September 28, 2026, and must be submitted as both a hardcopy and an electronic version on a USB drive under sealed cover. Final project deliverables include a project schedule and a comprehensive final report documenting all work performed.
Department of Water Resources

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS