SCI Fire & Life Safety Corrections

Active
S-29100-00017813State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santiam Correctional Institution (SCI) Fire and Life Safety Corrections project, solicitation S-29100-00017813, is an invitation for bids issued by the Oregon Department of Corrections to address fire and life safety deficiencies identified by the State Fire Marshal. The scope of work includes the repair and replacement of specific doors and frames, installation of fire and smoke rated hardware, addition of fire and smoke dampers for existing ducts, and the installation of magnetic hold open devices connected to the fire alarm system. The contract will be awarded to the responsive and responsible bidder who submits the lowest total base bid, with a preference given to products manufactured in Oregon. The project timeline requires a start date within ten calendar days of the Notice to Proceed, with substantial completion due within 150 calendar days and final completion within 180 calendar days. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount and comply with Oregon prevailing wage rates and Construction Contractors Board licensing requirements. Key quality standards include adherence to ANSI/SDI specifications for steel doors and frames, ADA accessibility standards, and ASHRAE energy codes. Additionally, the contract mandates a one-year warranty from the date of substantial completion and requires first-tier subcontractors to be paid within ten days of the owner's payment to the contractor. Bids must be submitted via OregonBuys by October 29, 2026.

General Info

Bids for fire and life safety corrections at Santiam Correctional Institution are requested.

Documents

8

GSD-2023-01 - Santiam Correctional Institution Fire & Life-Safety Corrections

PDF, High priority: read this first9 pages · specifications
High

ITB 18 Bidder Reminders Check Off Sheet

PDF, High priority: read this first1 page · check-off-sheet
High

ITB #S-29100-00017813: SCI Fire & Life Safety Corrections

PDF, High priority: read this first142 pages · itb
High

Santiago Correctional Institution - Asbestos and Lead Paint Survey Report

PDF, High priority: read this first14 pages · specifications
High

SCI Fire & Life Safety Corrections - Summary of Work

PDF, High priority: read this first2 pages · sow
High

ITB# S-29100-00017813 Pre-Bid Walkthrough Attendee List

PDF, Low priorityplan-holder-list
Low

Pre-Bid Pictures

PDF, Low priorityspecifications
Low

17813 ADDENDA 1_Final.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 29, 2026 to Nov 12, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Department of Corrections
Contacts2 people available
OfficeOR, USA
Office AddressOR, USA
Contacts
Dustin SculattiPoint of Contact
Dustin SculattiPurchaser

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with additional finish and lighting upgrades for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior wall surfaces. Technical upgrades involve installing raised flooring, implementing simple dimming electrical controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work complies with ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, where price, past performance, and corporate relevant experience are weighted with equal importance. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and submit a comprehensive safety and quality control plan. Proposals must be submitted electronically to the contracting officer by November 9, 2026, organized into separate price and technical volumes, with pricing provided in a specific Excel bid schedule.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and the removal and replacement of paving. Bidders must adhere to the Buy American statute and Davis-Bacon Act wage determinations. Bonding requirements are tiered, with proposals exceeding 150 thousand dollars requiring bid, payment, and performance bonds. The contractor is required to implement a three-phase quality control plan and provide extensive technical submittals, including shop drawings and test reports. Invoicing is conducted monthly via Wide Area Work Flow, requiring various NAVFAC forms and certified payrolls. All work must comply with ADA accessibility guidelines and specific military standards for piping and cybersecurity for facility-related control systems.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 27 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to submit proof of these specific public notices and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Documentation for general outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB certifications. Bidders must provide pricing for a wide array of scopes ranging from demolition and abatement to specialized mechanical, electrical, and plumbing systems. All work is subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, ADA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 20 days
View Details

More opportunities from Oregon → Department of Corrections

Same awarding agency

NAICS: 311212
New
SLED
Rice White Parboiled
Solicitation # S-29100-00018264
The Oregon Department of Corrections (ODOC) is soliciting bids under solicitation number S-29100-00018264 for the procurement of approximately 85,000 pounds of white parboiled rice. The goods are to be delivered FOB destination to the ODOC Central Distribution Center in Salem, Oregon. The delivery schedule requires the first full truck load to be delivered within 45 days after receipt of order, with subsequent loads delivered every 45 days until the total quantity is fulfilled. The contract will be awarded to the lowest responsive and responsible bidder, with a 5% preference available for resident bidders headquartered in Oregon. Bidders must adhere to strict packaging and labeling standards, including the use of FDA/USDA approved non-breakable containers and the conversion of Julian dates to the Gregorian calendar. All products must be prepared under modern sanitary conditions and comply with 21 CFR Part 110 and FSIS standards. Required documentation for the bid includes a Federal Employee Identification Number or Social Security Number, certification of Oregon tax compliance, and, for imported goods, FDA inspection documentation. Awardees must maintain auto liability insurance of at least 2,000,000 dollars and provide a certificate of insurance within seven calendar days of the award. Bids are submitted via the OregonBuys portal, with the response deadline set for November 16, 2026.
Rice Milling

POSTED

about 22 hours ago

DEADLINE

in 20 days
View Details
NAICS: 424510
New
SLED
Beans, Dried Pinto
Solicitation # S-29100-00018263
The Oregon Department of Corrections (ODOC) is soliciting bids under solicitation S-29100-00018263 for the procurement of approximately 127,500 pounds of dried pinto beans. The goods must be U.S. No 2 grade or better, uniform in color, and triple cleaned. Delivery is required at the ODOC Central Distribution Center in Salem, Oregon, via three full truck loads of approximately 42,500 pounds each. The first load must be delivered within 45 days after receipt of order, with subsequent loads following every 45 days or as scheduled by warehouse staff. All pricing must be fully prepaid by the contractor as FOB Destination. The contract will be awarded to the responsive and responsible bidder offering the lowest total price, with a 5% preference given to qualifying resident bidders headquartered in Oregon. Bidders must adhere to strict packaging and marking standards, including the use of non-breakable, FDA/USDA approved commercial containers and specific 5-digit date coding. Required documentation includes a manufacturer's cleaning certification and, for imported goods, FDA or relevant government agency inspection records. Contractors must maintain comprehensive insurance coverage, including $1 million per occurrence for general commercial liability and $2 million per accident for auto liability. Bids must be submitted through the OREGONBUYS portal by November 9, 2026, at 9:00 AM PST.
Grain and Field Bean Merchant Wholesalers

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details
NAICS: 561621
SLED
Coffee Creek Correctional Facility Camera Replacement and Installation Rebid
Solicitation # S-29100-00017953
The Oregon Department of Corrections is soliciting bids for the Coffee Creek Correctional Facility Camera Replacement and Installation Rebid located in Wilsonville, Oregon. This lump sum contract encompasses all labor, materials, transportation, equipment, and services required to complete the camera upgrade project. The project has a substantial completion deadline of May 1, 2027, and a final completion deadline of June 1, 2027. Award will be granted to the responsive and responsible bidder who submits the lowest total for the base bid, with a reciprocal preference applied to products manufactured in Oregon. Bidders must provide three project references of comparable size and scope and adhere to strict compliance requirements, including a qualifying employee drug testing program, BOLI prevailing wage rates, and ADA standards. The successful bidder must provide performance and payment bonds for 100 percent of the contract amount and submit proof of insurance within 10 calendar days of the intent to award. Due to the sensitive nature of the facility, bidders must execute a confidentiality and non-disclosure agreement and submit background verification data to access technical specifications and plans. All bids must be submitted via OregonBuys by the closing date of October 27, 2026.
Security Systems Services (except Locksmiths)

POSTED

about 1 month ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS