This Solicitation opportunity from Florida was posted on February 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SCWRF Treatment Technology & Flow Management Improvements

Closed
26-8635State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

about 16 hours ago

DEADLINE

in 21 days
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

about 24 hours ago

DEADLINE

in 19 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The contract involves the design and implementation of significant upgrades to the South County Water Reclamation Facility (SCWRF) owned and operated by Collier County Water-Sewer District (CCWSD) in Florida. Originally completed in 1991 and expanded in 2005 to treat up to 16 million gallons per day (MGD) on a maximum monthly average daily flow (MMADF) basis, this project aims to further increase treatment capacity by 5.1 MGD, reaching a total of 21.1 MGD MMADF by fiscal year 2031. These improvements are driven by the need to effectively manage current and projected peak and wet weather flows, maintain regulatory compliance, and enhance the facility’s ability to provide treated reclaimed water for beneficial reuse. Central to the project is the incorporation of advanced treatment technologies such as Membrane Bioreactor (MBR) systems or other approved alternatives to boost peak treatment flows to 56 MGD before flow equalization, alongside preliminary treatment and flow equalization facility upgrades. The scope encompasses comprehensive upgrades across the facility’s infrastructure and processes, including preliminary treatment trains capable of continuous operation during maintenance, enhanced flow equalization tanks and pumping systems, and modifications to accommodate trucked wastewater from vactor and pumper trucks. Critical improvements to aeration basins, clarifiers, tertiary filtration, and effluent disinfection systems are also integral, with options for ultraviolet disinfection evaluation. Electrical and odor control systems will be upgraded to ensure reliability and environmental compliance. Additional storage capacity for reject and reclaimed water, expanded solids handling capabilities, and a new materials storage building are planned. The design process, expected to be completed within one year of Notice to Proceed, requires coordination with the Department and incorporation of future capacity expansions and nutrient removal technology considerations. Legal and procedural oversight is governed by a Professional Services Agreement emphasizing licensing, compliance with Florida statutes, and mutual responsibilities, along with established purchase order terms ensuring vendor and county obligations are met throughout the project’s timeline.

General Info

Upgrade South County Water Reclamation Facility to expand capacity to 21.1 MGD by 2031.

Documents

12

26-8635 Exhibit - Tech Memo #9 Capacity Expansion Considerations Feb 2011

PDF, High priority: read this first13 pages · technical-memorandum
High

26-8635 SCWRF Treatment Technology Insurance Requirements

PDF, High priority: read this first2 pages · insurance-requirements
High

Authorization to Advertise 26-8635 SCWRF Treatment Technology & Flow Management Improvements

PDF, High priority: read this first1 page · authorization-to-advertise
High

Collier County Purchase Order Terms and Conditions Rev.3

PDF, High priority: read this first7 pages · contract-document
High

Collier County Vendor Checklist

PDF, High priority: read this first1 page · vendor-checklist
High

PSA CCNA Single Project Agreement 2025 ver.2

PDF, High priority: read this first31 pages · contract-document
High

Request for Professional Services Instructions Version 2

PDF, High priority: read this first20 pages · rps-instructions
High

RPS 26-8635 SCWRF Treatment Technology & Flow Management Improvements

PDF, High priority: read this first16 pages · rps
High

Collier County Form 2 Conflict of Interest Certification

PDF, Low priority1 page · conflict-of-interest-certification
Low

Collier County Form 4 Reference Questionnaire

PDF, Low priority1 page · reference-questionnaire
Low

Collier County Vendor Declaration Statement Form 1

PDF, Low priority1 page · vendor-declaration-statement
Low

Form 3: Immigration Certification for Collier County Procurement

PDF, Low priority1 page · immigration-certification
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities Engineering & Project Management
Contacts1 person available
OfficeEast Naples, FL, 34112, USA
Office AddressEast Naples, FL, 34112, USA
Contacts
Dania GuerreroProcurement Strategist III

Interested Companies (14)

Trippensee ShawEustis, FL
StantecAtlanta, GA
AquafinElkton, MD

See All 14 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The CCWSD owns and operates the South County Water Reclamation Facility (SCWRF). The SCWRF original construction was completed in 1991. It was expanded to its current maximum month average daily flow (MMADF) permitted capacity of 16 million gallon per day (MGD) in 2005. The 2025 Annual Update and Inventory Report identified a planned treatment technology and flow management improvement project at SCWRF is expected to increase the plant's treatment capacity by 5.1 MMADF MGD resulting in a total treatment capacity of 21.1 MMADF MGD and is anticipated to be online in FY 2031. The goal of this project is to implement the necessary upgrades to manage current and projected wet weather demands effectively. This initiative ensures continuous regulatory compliance and expands the capacity to provide treated, reclaimed water for beneficial reuse to customers. The SCWRF is a modified activated sludge domestic wastewater treatment plant consisting of two (2) 1.25-million-gallon (MG) flow equalization tanks (total capacity 2.5 MG), and odor control system, influent screening, grit removal system, fourteen (14) biological treatment basins consisting of anoxic and aerobic (total capacity 7.0 MG), six (6) turbo blowers and two (2) multi-stage centrifugal blowers to provide process air to the aerations basins, clarifier splitter structure, four (4) circular center feed clarifiers, eight (8) sand filters each 960 sq. ft. (total area 3,840 sq. ft.), sodium hypochlorite chemical feed system, four (4) chlorine contact tanks (total volume 412,000 gallons), two (2) 330,000-gallon aerated sludge holding tanks (total capacity 660,000 gallons), and four (4) belt filter presses for residuals handling. The treatment facility can be operated in modified Ludzack-Ettinger mode or in conventional activated sludge mode. The SCWRF's permitted capacity of 16 MGD MMADF could handle influent flows as high as 40 MGD peak hour (wet weather) through the preliminary treatment facility prior to flow equalization. The wet weather peak flows are managed using two (2) preliminary treatment train facilities, two (2) equalization tanks and the use of four (4) existing aeration basins as additional flow equalization. Effluent disposal consists of the County's slow rate of public access reclaimed water system and two (2) Class 1 injection wells. Treatment Technology and Flow Management Improvements The County has explored the use of Membrane Bioreactor (MBR) to increase peak and average capacity. The selected firm will incorporate MBR technology improvements, or other treatment technology as otherwise approved by the Department, into this project. The primary goal of the project is to improve wet weather plant capacity to treat a minimum peak flow prior to flow equalization of 56.0 MGD with a minimum average capacity of 21.1 MGD MMADF, or as otherwise approved by the County. The goal of the project is to complete construction by 2031. The design shall include preliminary plans for future improvements including increases in capacity, conversion to advanced wastewater treatment for nutrient removal, and additional or full MBR capacity conversion. The firm selected to complete design within one year (365 days) of issuance of the Notice to Proceed, or as otherwise approved by the Department. As outlined in a Technical Memorandum dated February 2011, the conceptual concept for capacity expansion at the SCWRF is the potential conversion of a portion of the aeration basin passes to MBR (membrane bioreactor) mode of operation. The proposed work for this conceptual conversion would be the installation of new equipment in some of the existing aeration basins, thus not requiring construction of new aeration basins. The remaining components of the facility expansion would be those which have the potential to be constructed inside a building and other structures located to the north of the aeration basins. A copy of this memorandum is included as attachment 26-8635 Exhibit -Tech Memo #9 Capacity Expansion Considerations February 2011to this solicitation. The design shall be comprehensive and be integrated and consistent with the entire treatment facility. The firm will be expected to coordinate with the Department (PUD) to define and determine the size, capacity, redundancy, and reliability criteria for the new, existing or improved facilities. Preliminary Treatment Facility Improvements The design shall include reliable new preliminary treatment facilities with the capability to take one (1) new treatment train out of service while maintaining wet weather criterion. The preliminary treatment facilities for the MBR treatment trains shall incorporate coarse screening (6 mm), grit removal, and fine screening (2 mm) or as otherwise approved by the Department. The constructed capacity of the new preliminary treatment facilities shall be large enough to treat the entire plant flow, or to reliably take the existing preliminary treatment trains out of service for rehabilitation. The preliminary design shall include the future expansion of the preliminary treatment facility to handle all plant flow and future consideration of increased peak flow capacity. Flow Equalization Facility Improvements Review and provide recommendations on flow equalization facilities required for the proposed facilities. At a minimum, subject to review and approval by the County: • Addition of at least one additional flow equalization tank shall be included. • Modifications to the existing flow equalization tanks to provide pump stations for each tank dedicated to mixing systems and return of equalized flow to the treatment process. • Review and modification of the existing flow control facilities that send flow to flow equalization. Receiving Facility for Vactor Trucks and Pumper Trucks A facility to receive material from County-owned vactor trucks has been designed by others. The project shall include assumption of this engineering design with a revised location on site at the SCWRF in coordination with the proposed facilities. The design shall be reviewed and modified as necessary to be incorporated in the plant site. Additionally, at times, the plant receives wastewater from pumper trucks hauling sewage from the CCWSD's sewerage system. The design shall include facilities to allow for receiving and preliminary treatment of this wastewater along with pumping to the plant's preliminary treatment facility. Reclaimed Water Pump Station Improvements : Evaluate and design improvements to the existing combined reclaimed water and deep injection well pump station to expand its pumping capabilities. Deep Injection Well Pump Station Design shall include an independent deep injection well (DIW) pump station to provide effluent disposal at the full rated capacity of the existing DIW systems two (2) wells, at approximately 18 MGD each, and reliable backup for reuse pumping to the existing slow rate public access reclaimed water system. Design shall evaluate the need to mitigate hydraulic pressures. Existing Activated Sludge Secondary Treatment Improvements • Evaluate and design improvements to the existing aeration basin tank drainage system including the associated valves and pumping systems. • Design a comprehensive rehabilitation of the activated sludge treatment mixed liquor splitter structure including flow splitting gates, weirs, aeration system, and structural considerations. • Evaluate and as necessary, design improvements to the existing clarifiers, associated return pumping systems, and sludge wasting systems. Provide recommendations for improvements to be included in the design. Tertiary Filtration and Effluent Disinfection The plant utilizes shallow bed traveling bridge sand filters for tertiary filtration and sodium hypochlorite with chlorine contact basins for effluent disinfection. • Evaluate and design improvements and replacement equipment for the existing tertiary filtration systems. • Provide design of tertiary filtration and effluent disinfection to accommodate increased plant average and peak flows as required. • In the preliminary design, evaluate Ultraviolet Light (UV) Disinfection as an alternative means of effluent disinfection. Electrical Service and Power Systems Design shall provide an additional electrical service for the plant including reliable double-ended switchgear, motor control centers, and generators sized for final build out of all passes converted to MBR, as well as meeting all project needs. Odor Control Design to include Odor Control System(s) to treat odors for new or modified facilities, and project improvements. The requirement is to remain in compliance with FDEP requirements and County goals to prevent discharge of odors offsite. Reject and Reclaimed Water Storage The existing plant uses a repurposed oxidation ditch structure for reject water and reclaimed water storage. The outer ring, 3 million gallons (MG), is generally used for reject water storage, which can either be disposed of by pumping into the deep injection wells or drained to the reject pond for retreatment. The inner passes (3 MG) are used for reclaimed water storage. The effluent pump station draws from the tanks and discharges to either the CCWSD's slow rate public access reuse system, or to the deep injection wells. The plant has a 4 MG reject water storage pond. Reject water from the pond is returned to the plant though a plant drain pump station. This project includes modifications of existing tanks and ponds to provide minimum of 3 MG of additional reclaimed water storage (minimum of 6 MG of reclaimed water storage is required) and a minimum of 3 MG of reject water storage in a tank(s) to allow for pumping to the DIW system or retreatment though the plant. The existing reject pond can be modified, retained or eliminated as required for the comprehensive facility design. Solids Handling Improvements • Design to include additional aerated sludge holding tank(s) and associated pumping systems to supplement the existing systems as required to provide the required capacity for the facility. • Design shall include and allocate space for the ultimate future capacity expansion. • Additional sludge dewatering system(s) potential using belt filter press or screw press technology to provide additional sludge dewatering capacity. Material Storage Building Design a material storage building on the SCWRF site. Conceptual size is minimum 40' x 60', or as otherwise approved by the Department. Comprehensive Services and Components The improvements include, but are not limited to the following components: • Tanks • Pumping facilities • Buildings • Pumps, piping, valves, and other appurtenances • Mechanical Systems including plumbing and Heating, Ventilation and Air Conditioning (HVAC) • Odor Control facilities • Structural • Electrical and Supervisory Control and Data Acquisition (SCADA) • Generator/fuel systems • Chemical feed systems • Storm Water improvement and treatment concepts, quantity attenuation, storage, and runoff rate management and reduction • Access Roads • Pathway/sidewalk • Landscaping • Security • Site improvements • Coordination with other construction projects, designed by other professionals

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS