Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

SEAL ASSEMBLY

Active
N0010426QFB51Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract mandates the supply of a 1-inch seal assembly designated as SPECIAL EMPHASIS material (Level I), critical to the integrity of a shipboard system where failure could result in catastrophic outcomes including loss of life or the vessel itself. The item must conform to Murdock Drawing 299933 and associated specifications, with strict requirements for material composition including MIL-C-15726 and MIL-C-24679 alloys, and mandatory certification of chemical and mechanical properties traceable to heat-lot numbers marked directly on the material. All welding, brazing, and fabrication must adhere to S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278 standards, with procedures and qualification data submitted for prior Navy approval; weldments require radiographic inspection with film and reports submitted for final Navy acceptance at least 45 working days prior to shipment. Traceability must be maintained from raw material through all processing stages, including subcontracted operations, with every component permanently marked for direct linkage to test reports and certifications. The contract imposes rigorous quality assurance protocols aligned with ISO-9001 and ISO-10012 or MIL-I-45208 and MIL-STD-45662, requiring 100% inspection of certification documents, nondestructive test results, traceability markings, and material conformance with zero defect tolerance for lot acceptance. All certification data must be submitted via Wide Area Work Flow (WAWF) to Portsmouth Naval Shipyard (N50286) with inspection and acceptance performed by N39040, and no material may be shipped until formal acceptance is received. The requirement is issued under Emergency Acquisition Flexibilities and is classified as a DPAS-rated order for national defense use, with a delivery deadline not later than 365 days after contract effective date. Mercury-containing materials are prohibited, all welding and brazing filler metals must be verified prior to use, and conformity must be certified with unqualified, signed statements without disclaimers. The contract explicitly removes the small business set-aside, is treated as a sole-source procurement due to system limitations, and requires all waivers, deviations, and engineering changes to be submitted through the ECDS system for review and approval by the Contracting Officer.

General Info

Procurement of 1-inch shipboard seal assembly requiring strict quality, inspection, and documentation controls.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.24|WVQ|N/A|ashton.k.perry.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332919|750 employees|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Qty increased to 18 EA. Small Business set-aside is hereby removed. All else unchanged. \ 1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already onfile at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 4. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. Weld procedure and qual data 120 days adc LT Approval of weld procedures and qual data 60 days after receipt PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RSS SD APPROVAL OF PR 30 DAYS AFTER RECEIPT PNSY review/acceptance of Certification CDRLs 30 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 5. Any contract awarded as a result of this solicitation will be a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 6. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). 7. This requirement is listed as a set-aside, however, due to system restrictions, this is a sole-source requirement. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;299933 27826 F B 300029 27826 C B 299968 27826 D B 299969 27826 B B 300057 27826 H B 302392 27826 -- B 302391 27826 -- B 299971 27826 B B 302393 27826 - B 302375 27826 - B; DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-T-16420 | | |K |880916|A| 1| | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24202 | | |A |171217|A| | | DOCUMENT REF DATA=MIL-C-24679 | | | |880506|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-003-8000 | | | |740701|A| |02| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The 1 inch Seal Assembly must be in accordance with Murdock Drawing 299933, Item 2, Part Number 300029-100, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Back Flange, item 7 on Murdock Drawing 300029; Thread End, item 3 on Murdock Drawing 299969 or item 3 on Murdock Drawing 302393; and Flare End, item 2 Murdock Drawing 299969 or item 2 on Murdock Drawing 302393; Material - ;MIL-C-15726, Alloy C71500 or MIL-C-24679, Alloy C71500; Part - ;ELBOW, item 1 on Murdock Drawing 299969 or item 1 on Murdock Drawing 302393; Material - ;MIL-T-16420, type I, composition 70/30 or MIL-C-15726 Alloy C71500 (Bar), in accordance with Murdock Drawing 300057 or Murdock Drawing 302375 and MIL-DTL-24202; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Dye Penetrant Inspection; Item - ;Back Flange, Thread End and Flare End; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;For MIL-C-15726 material use MIL-STD-2035 or 0900-LP-003-8000; For MIL-C-24679 forgings use MIL-C-24679; Test - ;Dye Penetrant Inspection; Item - ;Elbow; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035 or 0900-LP-003-8000; Test - ;Visual and Dye Penetrant Inspection (Final Layer); Item - ;Weldments; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035 or 0900-LP-003-8000; Attribute - Certificate of Compliance for seamless tubing/pipe Item - ;Elbow; Performance - Material supplied must be in the seamless condition. 3.4 ;Recorded Dimensions - A certification of recorded dimensions as depicted in note 6 of Murdock Drawing 300057 or note 6 of Murdock Drawing 302375 is required. Certification must include the actual measured dimensions. At the time of receipt inspection, rejection of any single piece must be cause for rejection of the entire lot.; 3.5 Radiography is required on ;weldments and must be identified to the weld joint; . 3.6 Change Paragraph 3.2.5 of MIL-F-24202 to read: 3.2.5 All finished fittings must be furnished in the fully annealed condition. 3.2.5.1 After annealing, fittings produced from tubular stock must not exceed a maximum hardness of 51 rockwell 30T determined in the area of maximum bending or forming when manufactured in accordance with paragraph 3.2.3. 3.2.5.2 Fittings produced from bar, plate, or forgings in accordance with 3.2.4 must meet the hardness required by 3.2.5.1, except that the location for hardness tests may be any area of the finished fitting. 3.7 Changes to MIL-T-16420 Mechanical Properties (Table II): Copper Alloy Outside Tensile Yield Strength Elongation in and Temper Diameter Strength (.5% under load) 2" or 4x dia. 715 (70/30)...All.......50,000....18,000............30.0% (min) Fully Sizes Annealed 3.8 MIL-T-16420 UT Changes - Delete paragraph 3.4.3.4 and substitute: "3.4.3.4 Laminations. Tube required to meet the ultrasonic requirements specified in 3.4.3 must be examined for laminar discontinuities that present indications exceeding exploration threshold levels (20 percent for the contact method at +6 db; 30 percent for the immersion method at calibration) must be rejected." 3.8.1 In the second sentence of paragraph 4.4.7; delete "18 inch" and substitute "1 inch". In the last sentence, insert "3.4.3.4 and" before "3.8.2". 3.9 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.9.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.9.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.9.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.10 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.11 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.12 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.13 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.13.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.13.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.13.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.14 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.15 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.15.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.16 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.17 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.18 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.18.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.18.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.18.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.18.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.18.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.18.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.18.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.18.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.18.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.18.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.18.11 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.18.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.19 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptance criteria for weldments to be per the applicabletable of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable. 3.19.1 Submission of radiographic shooting sketches for approval is not requiredfor weldments. 3.19.2 All pieces radiographed must be permanently marked with "RT" and a unique traceability number. (Unique traceability number must be directly traceable to the RT film.) 3.19.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiographyrequires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved by the Navy prior to shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection. (a) Film (b) RSS/RSSS (c) RS (d) DD250 (with heat numbers corresponding to RT numbers referenced in block 16) 3.20 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.20.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.20.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.20.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.20.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.20.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.21 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.21.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.21.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.22 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.22.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.22.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.22.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.22.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.22.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.23 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.23.1 Visual examination upon receipt to detect damage during transit. 3.23.2 Inspection for completeness and proper type. 3.23.3 Verification of material quality received. 3.23.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.23.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.23.6 Identification and protection from improper use or disposition. 3.23.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.23.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.23.9 Material returned to the contractor must be handled as GFM. 3.24 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.24.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.25 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.25.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.25.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.25.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.25.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.26 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.26.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.26.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.26.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.26.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.26.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.27 Material Handling - The written material control process must include the following: 3.27.1 All raw materials must have traceability markings (except as specified below). 3.27.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.27.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.27.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.27.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.27.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.28 Receiving inspection - 3.28.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.28.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.29 Discrepancy reporting - 3.29.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.30 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.30.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.30.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.30.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.30.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.30.5 In addition to all other marking, the cure date of the molded seal must be marked on the outside of each unit package. 3.31 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Blocks 12 and 14 - Within 135 Days After approval of Radiographic Shooting Sketches, forward one copy for review to: Commander, Portsmouth Naval Shipyard ATTN: Code 135.3 Portsmouth, NH 03804-5000 A receiving report must be entered into WAWF and should reference the date of shipment and the shipment tracking number. Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and email notification field: PORT_PTNH_WAWF_Notification@navy.mil The review (approval/disapproval) must be accomplished within 30 days from date of receipt.

Similar Contracts

Same NAICS industry code

NAICS: 332919
New
Federal
47--BASKETThe contract pertains to the procurement of repair parts under solicitation N0010426QBM03 with a response deadline of August 7, 2026, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical division. The scope requires strict adherence to the Individual Repair Part Ordering Data (IRPOD) as the primary technical reference, with mandatory review of the IRPOD available on the BPMI website, which requires pre-registration. Pricing is valid for 60 days post-closing unless otherwise specified, and amendments such as the increase in quantity from 2 to 5 must be acknowledged. The contract invokes a strict order of precedence for conflicting documents, with contract amendments taking priority over schedules, terms, IRPOD, specifications, and drawings. Compliance with specified revision levels of referenced documents is mandatory, and deviations or waivers for non-conformances must be submitted in advance with full justification, supporting technical data, and assessment of impact on form, fit, and function. Any requested changes must be reviewed and endorsed by the Government Quality Assurance Representative before formal submission to the post-award contracting officer. Quality assurance requirements are governed by the IRPOD, obligating the contractor to maintain a government-acceptable inspection system and retain complete records accessible for government review throughout performance and beyond. Packaging must comply with MIL-PRF-23199 and related standards, with specific clarification that MIL-DTL-24466 green poly bags are permitted only when cleanliness controls from designated documents apply, and fire-retardant packaging is no longer required. The use of mercury or mercury-containing compounds is strictly prohibited in any part or contact surface. Technical data packages are governed by DD Form 1423 with detailed instructions for data submission, inspection, and acceptance codes, including designated roles for inspection authority and distribution restrictions. Delivery of certified test and inspection reports under DI-QCIC-8872 must be submitted in separate packages per contract line item, coordinated with the PCO prior to shipment, and all submissions are due at contract end. The contract includes mandatory compliance with Buy American, small business set-aside, cybersecurity maturity certification, equal opportunity, and priority rating requirements, and all contractual documents are considered issued upon electronic or postal transmission by the government.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332919
New
Federal
STEM,FLUID VALVEThis contract pertains to the supply of a specialized stem and disk assembly for a 1 1/2 inch globe throttle valve, designated as special emphasis Level I material due to its critical role in shipboard systems where failure could result in catastrophic consequences including loss of life or the vessel. The item must strictly conform to NAVSHIPS drawing 803-2177525, with the stem composed of ASTM-A182 Grade F6a or SAE AMS-QQ-S-763 Class 410 Condition T material, and must satisfy rigorous mechanical and chemical certification requirements. All materials must be traceable from raw stock through every manufacturing stage to the final component, with unique heat-lot or traceability markings permanently applied and verified against test reports. Certification documentation must confirm compliance with specified standards including ASTM-E18, ASTM-E140, MIL-STD-2035, and ISO-9001, and must be submitted in electronic format via WAWF with explicit identification to the contract number, NSN, and government receipt points. The contract mandates a stringent quality assurance regimen requiring the contractor to maintain an ISO-9001 based quality system, with calibration procedures aligned to ISO-10012 or ANSI-Z540.3 and ISO/IEC 17025, subject to government audit at source. All welding, brazing, and machining operations must adhere to specified Navy procedures including S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with welding procedures and qualification data requiring prior Navy approval. Non-destructive testing, including dye penetrant inspection and visual inspection of hardfaced surfaces, is required, and chemical and mechanical properties must be verified per heat treat batch with 100% inspection of all certification data. Final acceptance is contingent upon zero-defect lot sampling, with all traceability markings legible and intact. Electronic signatures are permitted on certifications, provided they are individually controlled and unalterable. Delivery is subject to government inspection prior to shipment, with no material allowed to proceed without WAWF certification acceptance from Portsmouth Naval Shipyard. The contract is issued under Emergency Acquisition Flexibilities, requires bilateral acceptance, and mandates full compliance with security and small business set-aside provisions.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 332919
New
Federal
SEAT,VALVEThis contract pertains to the procurement of ball valve seats designated as SPECIAL EMPHASIS Level I material, critical to shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The material must comply strictly with Naval Ship Systems Command drawings 803-2178494 and 803-4384678, and be manufactured from Delrin Dupont AF DE588 with defined chemical and mechanical properties including specific gravity, tensile strength, impact resistance, water absorption, and Teflon fiber content between 18–23%. All material must be traceable from raw batch to finished component via unique heat/lot/batch numbers marked directly on the product, with certification reports verifying conformity to specified test methods and values. The contractor must maintain a certified quality system per ISO-9001, ISO-10012, and ISO/IEC 17025, subject to government inspection at source, with mandatory submission of inspection records, test reports, and a certificate of compliance that links each item to its objective quality evidence. Delivery requires prior government acceptance through WAWF, with certification documentation routed to Portsmouth Naval Shipyard for review. The contract enforces strict configuration control, prohibiting unauthorized changes or deviations without formal approval from the Contracting Officer, and mandates the submission of Engineering Change Proposals for any modifications affecting form, fit, function, or interface. Mercury and mercury-containing substances are strictly prohibited, and all material must be free of intentional contamination. Subcontractors must be vetted for quality capability and their work governed by the same contractual obligations as the prime contractor. Packaging must adhere to MIL-STD-2073, and all documentation references, including military and international standards, must be accessed through ECDS or official DoD sources. The procurement is subject to Emergency Acquisition Flexibilities, classified as a rated order under the Defense Priorities and Allocations System, and designated as a total small business set-aside. All contractual documents are deemed issued upon electronic transmission, and acceptance requires bilateral agreement. The item is subject to Buy American and Federal Trade Agreement requirements, and all data submissions, waivers, and inspections must be conducted through designated government systems, with specific procedures for nonconformance reporting and corrective action.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
STEM,FLUID VALVEThis contract pertains to the supply of a stem for 1/4-inch ball valves designated as SPECIAL EMPHASIS material (Level I/SUBSAFE), critical to the safe and reliable operation of shipboard systems where failure could result in catastrophic loss of life, vessel, or mission-critical capabilities. The material must conform strictly to NAVSEA drawing 6408783 and specifications including QQ-N-286, Form 2, Annealed and Age Hardened, with no weld repairs permitted. Quantitative chemical and mechanical certification is mandatory, requiring traceability from raw material through every manufacturing step to the final component via permanent, legible markings that link directly to test reports. Testing, including ultrasonic inspection and Slow Strain Rate Tensile Tests, must be conducted by approved laboratories only. All certifications must be electronically signed and unqualified, with no disclaimers allowed, and must be submitted via WAWF to Portsmouth Naval Shipyard for pre-shipment approval before any material can be shipped. The contractor must maintain a quality system compliant with ISO-9001 and ISO-10012 or MIL-I-45208 and MIL-STD-45662, subject to Government inspection at source. Traceability, material handling, and documentation control are rigorously enforced, requiring 100% verification of certifications, marking legibility, and conformity to specifications. Receiving inspections demand zero defect acceptance criteria, with strict segregation of traceable materials and procedures to prevent commingling. All subcontractors must adhere to the same standards, and the prime contractor is responsible for ensuring compliance down the supply chain. Engineering changes require formal ECPs, and waivers or deviations must be submitted and approved by the Contracting Officer before implementation. The procurement is issued under Emergency Acquisition Flexibilities, rated under DPAS as DX/DO, and falls under a total small business set-aside with mandatory compliance with Buy American provisions, Mercury-free requirements, and data delivery through ECDS and WAWF systems. The point of contact is Heather R. Jones, with all contractual documents considered issued upon electronic transmission and requiring bilateral acceptance.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
47--CONNECTION,FLEXIBLE- AND SIMILAR REPLACEMENT PARTSThis contract governs the procurement of flexible connection and similar replacement parts designated as Special Emphasis Level I material for critical shipboard systems, where failure could result in catastrophic consequences including loss of life or the vessel itself. The items must strictly conform to Murdock Drawings and a comprehensive list of referenced military and industry specifications including MIL-C-15726, MIL-C-24679, QQ-N-281, QQ-N-286, MIL-DTL-1222, MIL-STD-2035, ASTM standards, and ISO-9001, with exact material compositions, heat treatments, and mechanical properties mandated for key components such as bodies, flanges, studs, self-locking nuts, socket head cap screws, and elbows. Certification of chemical composition, mechanical properties, and nondestructive testing including dye penetrant, liquid penetrant, radiography, hydrostatic pressure, and wedge tensile testing is mandatory and must be traceable through unique heat-lot and traceability markings applied per MIL-STD-792. All test reports and certifications are required to be original, unqualified, and directly linked to the marked material, with no transcription permitted. The contract imposes stringent quality control, documentation, and traceability protocols under a government-source inspection regime managed by DCMA, with the contractor required to maintain an ISO-9001 quality system compliant with ISO-10012 and ISO/IEC 17025. Welding and brazing must be performed using approved procedures and qualified personnel per S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with all welding procedure qualifications and consumable filler metal certifications submitted and approved prior to production. Radiography of weldments requires Navy acceptance of film and associated documentation at least 45 working days before shipment, and all items must be permanently marked with traceability identifiers. The order, issued under Emergency Acquisition Flexibilities and rated for national defense priority, mandates 100% inspection of traceability, certification documents, and NDT results, with zero tolerance for nonconforming material. Deliverables must be completed within 365 days of contract effective date, with certification data submitted 20 days prior to delivery and final approval subject to Navy review. All supplier actions, including subcontractor oversight, must adhere to the contract’s stringent control, reporting
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 30 minutes
View Details
NAICS: 332919
New
Federal
BUSHING,SLEEVEThis contract pertains to the supply of a bushing, sleeve designated as special emphasis material (Level I), intended for critical shipboard systems where failure could lead to catastrophic consequences including loss of life or vessel. The item must conform to Marotta Scientific Controls Inc. Drawing 284027, specifically Part Number 195462-0001, and is manufactured from CRES 300 series material as defined by SAE AMS-QQ-S-763, ASTM-A581, ASTM-A582, or SAE AMS 5640. Strict quality controls are mandated, including mandatory intergranular corrosion testing for designated alloys prior to fabrication, non-destructive testing of welds, and adherence to approved welding and brazing procedures outlined in S9074-AQ-GIB-010/248 and 0900-LP-001-7000. All welding procedures and personnel qualifications require prior government approval, and electronic submission of procedures and qualification data in PDF format is required. Compliance with traceability requirements is absolute; each component must bear a permanent, legible traceability mark linked to certified chemical and mechanical test reports, with batch sampling conducted at least every eight hours during production. Material certification must be provided via electronic signature under strict controls, with no disclaimers permitted, and all certifications must be submitted via WAWF to Portsmouth Naval Shipyard with specific routing instructions prior to shipment. The contractor’s quality system must comply with ISO-9001, ISO-10012, and ISO/IEC 17025, and is subject to government source inspection. All subcontractors must be vetted, and any deviation or waiver must be formally requested, classified, and approved. Delivery is FOB destination, warranty is one year from delivery, and the contract is rated under DPAS for national defense priority. Mercury is strictly prohibited, and all packaging, marking, and documentation must comply with MIL-STD-2073 and other referenced standards. Failure to meet any requirement can result in rejection of materials or termination of contract.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details
NAICS: 332919
New
Federal
STEM,FLUID VALVEThis contract pertains to the supply of a STEM, FLUID VALVE for use in a critical naval shipboard system, where failure could result in catastrophic consequences including loss of life, ship, or vital systems. The item is designated as SPECIAL EMPHASIS material (Level I), triggering stringent quality, traceability, and certification requirements. All materials must conform to Naval Ship Systems Command Drawing 6405340, with strict adherence to ASTM-B150 Alloy C63200, Temper TQ50, and referenced military and international standards including ISO-9001, MIL-STD-792, and S9074 series welding and brazing specifications. Comprehensive documentation including 100% certified chemical and mechanical test reports, traceability to heat-lot numbers, and electronic signatures on certification documents are mandatory. Material must be permanently marked with traceable identifiers, and any alteration to properties requires re-certification and re-identification. Welding and brazing procedures must be pre-approved, with qualification data submitted electronically, and all weld filler metals require a Certificate of Compliance verifying type and lot conformity. Non-conforming material is subject to rejection, and any waivers or deviations—classified as Critical, Major, or Minor—must be formally requested and approved by the Contracting Officer prior to implementation. The contractor must maintain a certified quality system meeting ISO-9001 with calibration controls per ISO-10012 or ANSI-Z540.3 and is subject to Government Quality Assurance at source, with inspections conducted by DCMA representatives at the supplier’s facility. Subcontractors are bound by the same stringent requirements, and the prime contractor is responsible for qualifying and auditing all sub-tier suppliers. All certification data must be submitted via Wide Area Work Flow (WAWF) prior to shipment, with specific shipping, inspection, and acceptance codes directed to Portsmouth Naval Shipyard, and no material may be shipped without prior acceptance. The contract invokes Buy American and small business set-aside provisions, prohibits mercury and unauthorized marking, and requires full configuration control through Engineering Change Proposals for any modifications. Electronic submission of documents via ECDS is required, with all data including test reports, waivers, and compliance certificates subject to review and approval by the Government prior to acceptance. Final inspection mandates zero-defect acceptance per ANSI/ASQ Z1.4, with all material traceable from raw stock through fabrication to final delivery, ensuring absolute control over safety-critical components.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
FLANGEThis contract specifies the procurement of a specially engineered Attach Flange designated as SPECIAL EMPHASIS material (Level I/SUBSAFE) for use in a critical shipboard system, where failure could result in catastrophic consequences including loss of life or vessel. The flange must conform to Murdock Drawing 299931 and be manufactured from MIL-C-15726 or MIL-C-24679 alloy C71500, with strict requirements for chemical and mechanical verification. All material must be traceable from raw stock to final component via unique heat-lot markings, and certifications must explicitly confirm compliance with all invoked specifications including Dye Penetrant Inspection per T9074-AS-GIB-010/271 and acceptance standards per MIL-STD-2035 or 0900-LP-003-8000. Welding and brazing must adhere to S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with procedures and welder qualifications submitted for prior approval, and all weld filler metals require certification of lot number and compliance. The contractor must maintain a quality management system compliant with ISO-9001 and ISO-10012, augmented by ANSI-Z540.3 and ISO/IEC 17025, subject to government audits. Delivery is restricted to a 365-day window from contract effective date, with certification documentation—covering chemical, mechanical, and nondestructive test results—required 20 days prior to shipment and submitted via Wide Area Work Flow (WAWF) to Portsmouth Naval Shipyard using DODAAC N50286, inspected and accepted by N39040, with email notifications sent to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped without prior written acceptance. Traceability, material handling, and segregation of raw stock are mandated to prevent commingling, and all markings must be permanent, legible, and comply with MIL-STD-792. Electronic submission of waivers, deviations, and engineering change proposals must use ECDS at register.nslc.navy.mil, with submissions required for any departure from specifications, including critical safety-related changes. Mercury is prohibited from contact with the material, and all documentation must provide unqualified,
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 30 minutes
View Details
NAICS: 332919
New
Federal
POPPETThis contract, issued under solicitation N0010426QND70 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, pertains to the supply of a main poppet for a regulator valve assembly, identified by part number V2C12939-4MF and governed by drawing V3E10064. The material must conform to SAE AMS 5643, Condition H-1025, and is designated as SPECIAL EMPHASIS Level I material due to its critical role in shipboard systems, where failure could lead to catastrophic loss of life, vessel, or systems. Strict traceability and certification requirements are mandated, requiring each component to be marked with a traceability identifier linked to chemical and mechanical test reports, with 100% inspection of all certifications and markings. All material must be free of mercury, and welding, brazing, and thread formation must adhere to Navy-specific standards such as S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with procedures and qualifications submitted for prior approval. Electronic submission of documentation via WAWF is required, with certification data sent to Portsmouth Naval Shipyard for review prior to shipment, and no material may be shipped without formal acceptance. The contractor must maintain a certified quality system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternatively MIL-I-45208 and MIL-STD-45662, subject to government audit at any time prior to and during production. All subcontractors are bound by identical quality and traceability requirements, and the prime contractor is responsible for ensuring compliance throughout the supply chain. Testing, inspection, and non-destructive evaluation records must be traceable, comprehensive, and authenticated with electronic signatures that meet stringent controls, with no disclaimers permitted on certifications. The contract invokes full Navy configuration control, requiring Engineering Change Proposals for any modifications affecting form, fit, function, or interface, and mandates zero-defect acceptance criteria for all deliveries with lot sampling based on ANSI/ASQ Z1.4 or full inspection for small lots. Waivers and deviations of any significance require explicit approval from the Contracting Officer and must be submitted electronically. The contract is issued under Emergency Acquisition Flexibilities and is rated under the Defense Priorities
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details
NAICS: 332919
New
Federal
FERRULE,COMPRESSIONThis contract pertains to the procurement of a compression ferrule designated as special emphasis material, intended for critical use in shipboard systems where failure could lead to catastrophic consequences including loss of life or vessel. The item must comply strictly with NAVSEA Drawing 6397304 and adhere to rigorous quality standards including ISO-9001, ISO-10012, and ISO/IEC 17025, with MIL-I-45208 and MIL-STD-45662 accepted as alternatives. Mandatory requirements include oxygen cleaning per MIL-STD-1330, zero mercury content, and full traceability from raw material to final inspection via permanent markings compliant with MIL-STD-792. All components must undergo 100% inspection of certification documents and objective quality evidence, with lot acceptance based on zero defects. The contractor must maintain detailed records of inspections, control procedures for subcontractors, and formal engineering change proposals for any configuration modifications impacting form, fit, or function. Delivery is conditioned on prior review and acceptance of certification data by Portsmouth Naval Shipyard, with final shipment prohibited until formal acceptance is received via WAWF using designated ship-to and inspect-by codes. Certification of compliance must include traceability to individual item markings, NSN details, lubricants used, cure dates, and explicit confirmation of compliance with all contractual specifications, including HM&E testing where applicable. Quality assurance is performed at source by Government representatives, with full facility access rights granted for audits and inspections throughout the contract lifecycle. Waivers and deviations require prior written approval from the Contracting Officer and must be classified as critical, major, or minor, with full justification and impact analyses submitted electronically. The contract mandates adherence to Buy American provisions, a total small business set-aside, and priority rating under the Defense Priorities and Allocations System. The solicitation response deadline has been extended to August 25, 2026, with all other terms remaining unchanged.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details
NAICS: 332919
New
Federal
COUPLING,FLEXIBLEThis contract pertains to the procurement of a flexible coupling designated as a Special Emphasis Level I item, critical to shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The item must be refurbished to “like new” or “A” condition per Murdock Drawing 299942 and Maintenance Standard 4720-081-014 REV F CHG-5, requiring full teardown, inspection, and repair with strict adherence to traceability, material certification, and non-destructive testing protocols. All parts requiring certification must be traceable through heat lot, MIC code, or unique identifier, with chemical and mechanical properties verified via certified test reports that must be electronically signed and unqualified in their assertions. Materials such as C71500 alloy, QQ-N-281 Class B, and QQ-N-286 must meet exact specification requirements, including heat treatment, testing, and marking protocols, with welding restricted on QQ-N-286 material and all weld procedures requiring prior Navy approval. Fasteners must be marked per MIL-DTL-1222 and NASM 17828, including six-dot identifiers for self-locking nuts, with traceability maintained from raw material through final assembly. The contract mandates 100% inspection of certification documentation, material marking, and NDT results, and requires submissions via the ECDS portal, with all certifications and data aligned with DI-MISC-80678 and DI-MISC-81020 CDRLs. Delivery must occur within 365 days of contract effective date, with certifications submitted 20 days prior, and all materials must be shipped using government-provided logistics via ATAC. The contractor must maintain an ISO-9001 quality system, with government inspection authority at source, and subcontractors must adhere to the same stringent traceability, material control, and certification flow-down requirements. Mercury is prohibited, and all components must bear the CID number 990997160 on a permanent plate if not already required by drawing. The contract explicitly prohibits disclaimers in certification documents, requires electronic signature controls unique to the signer, and mandates full compliance with Federal, military, and industry standards including ASTM, ANSI, and MIL-STD specifications. Any deviation or waiver requires formal approval by the Contracting Officer and must be submitted electronically through ECDS. The purchase order is rated under the Defense Priorities and Al
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 335313
New
Federal
59--CIRCUIT BREAKER - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and quality assurance of a CIRCUIT BREAKER with part number 199590-711042, under solicitation N0010426RTA87, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The scope requires repairs to be performed strictly in accordance with contractor-established standards, technical orders, drawings, and government-approved procedures, with the CAGE code 30086 tied to the item’s functional and operational specifications. All repaired units must comply with MIL-STD-130 Rev N for marking and MIL-STD-2073 for packaging, and the contractor is fully responsible for ensuring compliance with all technical and quality requirements, even where explicit inspection clauses are absent. Quality records must be maintained for 365 days after final delivery, and all testing must align with the original manufacturer’s specifications. The contract mandates strict controls over design, material, or part number changes, requiring prior written approval from the NAVICP-MECH Contracting Officer for any substitution beyond Code 1 modifications, which only involve part number updates without functional changes. Proposals must be submitted via email to KEVIN.C.BILOUS.CIV@US.NAVY.MIL by the deadline of July 27, 2026, and only authorized distributors of the original manufacturer may be considered for award. The solicitation invokes Emergency Acquisition Flexibilities and includes mandatory clauses such as Buy American Act compliance, safeguarding of sensitive conventional arms and explosives, small business subcontracting obligations, and adherence to WFP Mod Assist for workflow. Additionally, contractors must ensure compliance with security prohibitions, equal opportunity requirements, and the mandatory use of Wide Area Workflow for payment and invoice processing. The contract is governed by a comprehensive set of DoD regulations, with distribution-controlled documents subject to strict handling and access protocols under OPNAVINST 5510.1.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 8 hours ago

DEADLINE

in about 1 hour
View Details
NAICS: 333611
New
Federal
BEARING ASSEMBLY,TUThis contract pertains to the repair of the BEARING ASSEMBLY,TU under a fixed-price arrangement with strict compliance requirements for quality, inspection, and documentation. The work must adhere to the contractor’s approved repair standards, technical orders, and manufacturer specifications, with all repairs requiring exact alignment to the specified CAGE code 90099 and reference number 1387F17G01. Item marking must follow MIL-STD-130 Rev N, and any changes to design, materials, or part numbers require prior written approval from the NAVICP-MECH Contracting Officer, categorized under one of six code types detailing the nature of the substitution. The contractor is fully responsible for all inspection and testing procedures, ensuring compliance with both government standards and original manufacturer requirements, and must maintain complete inspection records for 365 days after final delivery. The contract mandates adherence to Buy American and Free Trade Agreements, with applicable certification requirements, and includes a total small business set-aside with restrictions on pass-through charges. A one-year warranty covers supplies after delivery, with defects must be reported within 45 days of discovery. Packaging must conform to MIL-STD-2073, and all technical documents referenced must be obtained through authorized DOD channels, with specific procedures for restricted or classified materials. The solicitation is limited to authorized distributors of the original manufacturer, who must provide proof of authorization. The North American Industry Classification System code is 333611, with a small business size standard of 1,500 employees, and the contract was posted on July 27, 2026, with a response deadline of August 24, 2026. All communication and submissions must be directed to the designated point of contact at the Naval Supply Systems Command in Mechanicsburg, Pennsylvania.
Turbine and Turbine Generator Set Units Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details
NAICS: 325510
New
Federal
PRIMER COATINGThis contract pertains to the procurement of PRIMER COATING under solicitation N0010426QYADD, with a mandatory requirement for higher-level inspection per MIL-I-45208 and strict adherence to MIL-STD-130 for item marking. The item must be manufactured without any metallic mercury or mercury contamination, with any proposed use of mercury requiring explicit prior written approval from the Contracting Officer, including detailed safeguards and warning labels. The contractor must maintain a qualified quality assurance system and is responsible for all inspections, with records retained for four years post-delivery. Classified information tied to this contract, including NAVSEA technical specifications at the Confidential level, necessitates a valid U.S. security clearance; all classified material must be handled exclusively at the Valencia, CA facility (CAGE 0G1Z3), with no access permitted at the Mount Laurel, NJ site. The contract incorporates mandatory clauses for Buy American compliance, Security Prohibitions, and a DD254 classification specification, and is subject to Defense Priorities and Allocations System (DPAS) rating. Delivery must comply with FAR 52.217-6, and the Government may exercise a 30-day option to increase the original quantity of 2,500 units at the stated firm unit price. Acceptance of award requires bilateral agreement, and all contractual documents are deemed issued upon electronic transmission or mail. The procurement employs Emergency Acquisition Flexibilities and is restricted to U.S. entities with appropriate security authorization. The contractor must comply with all subclause requirements including the Small Business Subcontracting Plan, Warranty of Non-Contaminated Products, and the use of Workflow Pro for payment processing. Packaging must conform to MIL-STD-2073, and all referenced specifications must be obtained via authorized DOD sources. The point of contact for technical and administrative matters is Alison N. Bruker, with email and phone provided. The NAICS code is 325510, indicating classification under Coating, Enameling, and Allied Products Manufacturing. The award will be issued bilaterally after contractor acceptance, and the CAGE code of the offering entity must be clearly identified. This contract does not permit substitutions or design changes without formal written approval from the Contracting Officer, except for minor part number changes under Code 1. All subcontracts must mirror the mercury and security requirements applicable to the prime contract.
Paint and Coating Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 30 minutes
View Details
NAICS: 334513
New
Federal
D/P GAGEThis contract pertains to the procurement of a D/P GAGE under solicitation N0010426QEB47, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical (NAVSUP WSS-MECH) under the Department of Defense, with a response deadline of August 24, 2026. The contract mandates strict adherence to technical and quality standards outlined in the Individual Repair Part Ordering Data (IRPOD), drawings, specifications, and other referenced military and commercial documents, with the IRPOD taking precedence over other contract sections in case of conflict. All submitted items must comply with revision levels specified in referenced documents, and any deviations or waiver requests must be formally submitted with detailed justification, technical data, and evidence that the proposed change will not impact the part’s quality, form, fit, or function. Contractors are required to maintain a government-acceptable inspection system and keep all inspection records accessible throughout and beyond contract performance. Packaging must conform to MIL-PRF-23199, particularly when cleanliness controls from MIL-STD-767, MIL-STD-2041, or similar standards are invoked, requiring heat-sealed envelopes and prohibiting the use of fire-retardant materials. All shipping containers and interior packaging must be marked “PROTECT FROM FREEZING.” A Certificate of Compliance per DI-MISC-81356 must accompany each delivery, issued separately for each unique NSN and item nomenclature combination. Pricing is valid for 60 days after the closing date unless otherwise specified, and all contractual documents are considered issued upon electronic transmission. The contract enforces cybersecurity maturity model certification, prohibitions on mercury, equal opportunity requirements for veterans and workers with disabilities, and mandates compliance with priority rating for national defense purposes. Technical data submitted must follow DD Form 1423 guidelines, including proper distribution statements, inspection and acceptance codes, and data item description requirements, with data pricing classified into one of four groups based on its purpose and development cost. Contractors must register to access required documentation via the BPMI e-Commerce portal and comply with cybersecurity, security, and administrative protocols outlined in associated clauses.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details
NAICS: 333914
New
Federal
PUMP UNIT,CENTRIFUGThis contract pertains to the repair of a centrifugal pump unit under a fixed-price arrangement, with a mandated Repair Turnaround Time (RTAT) of 503 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must adhere to the original manufacturer’s specifications and technical directives, with strict compliance to MIL-STD-130 Rev N for item marking. The Government requires Government Source Inspection and mandates that the contractor maintain complete inspection records for one year after final delivery. Freight is FOB Origin, and all logistics are managed by the Navy under the CAV Statement of Work. The contract includes a provision for an optional increase in quantity within 365 days of award, with pricing locked at the original unit rate unless otherwise agreed. The award will be issued bilaterally, requiring the contractor’s signed acceptance before it becomes effective. The solicitation emphasizes strict adherence to performance timelines, with financial penalties applied per unit per month for any inexcusable delays beyond the RTAT, capped at a predetermined maximum amount, without waiving other remedies such as termination for default. Pricing must reflect historical data or commercial marketplace rates, and if the item has not been previously purchased by the contracting office, the contractor must provide comparable NSNs or validated invoices to justify pricing. Contractors must be authorized distributors of the original manufacturer and must submit proof of authorization. The item is classified under NAICS code 333914 and qualifies under small business program representations with a 750-employee threshold. The contract incorporates mandatory clauses including security prohibitions, Navy use of AbilityOne support, and the requirement to use Workflow Pro’s Assist Module with Alexander Craft as the designated point of contact. All documentation must comply with distribution statement codes as outlined in OPNAVINST 5510.1, and requests for restricted documents must be formally submitted through designated Navy channels.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336310
New
Federal
PUMP ASSEMBLY,FUELThis contract solicitation, identified as N0010426QXB89, seeks repair services for the PUMP ASSEMBLY,FUEL under a fixed-price arrangement, with emphasis on strict adherence to military standards and government-imposed performance timelines. The contractor must provide a firm-fixed-price, not-to-exceed, or estimated quote specifically for repair, excluding test and evaluation fees unless tied to a final determination of报废或返修状态. The repair turnaround time is mandated at 265 days from receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system, with penalties applied per unit per month for late delivery unless delays are excusable. The contractor must also commit to a monthly throughput capacity and adhere to an induction expiration date of 365 days post-award, beyond which repairs require bilateral consent. All repairs must comply with MIL-STD-130 marking requirements, DFARS 252.211-7003 for Item Unique Identification, and the government’s source inspection and packaging standards, including MIL-STD-2073. Only authorized repair sources may be awarded, and proof of authorized distributor status must accompany the proposal. The contract mandates full compliance with Buy American requirements, cybersecurity maturity certification, and small business subcontracting obligations, along with strict documentation and recordkeeping practices. All quotes must include unit and total repair pricing, RTAT duration, price type designation, CAGE codes for award, inspection, and shipping locations, as well as the basis of pricing and a minimum 90-day expiration. Price reductions are enforceable for unexcused RTAT delays, capped at a specified maximum per unit per month, without precluding government remedies such as termination for default. Technical adherence to manufacturer specifications, drawings, and approved repair procedures is required, with any design or part number changes subject to prior written approval. Documentation distribution is governed by strict classification and dissemination codes per OPNAVINST 5510.1, and all submissions must be electronically sent to the designated point of contact. Responses are due by August 10, 2026, and awardees must operate under the contract’s quality assurance, inspection, and logistics framework as managed through Navy CAV or Proxy CAV.
Motor Vehicle Gasoline Engine and Engine Parts Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 14 days
View Details
NAICS: 333914
New
Federal
43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of the PUMP UNIT, CENTRIFUG, under a firm fixed-price structure, with strict adherence to technical and quality standards defined by the Navy. The work must comply with specified Cage Code and reference number requirements, and any changes to design, material, or part numbers require prior written approval from the NAVICP-MECH Contracting Officer, categorized under one of six defined change codes ranging from simple part number updates to non-interchangeable redesigns. All repairs must follow approved contractor and government technical documentation, including drawings, manuals, and operational directives. Quality assurance is a shared responsibility, with the contractor obligated to maintain comprehensive inspection records for at least 365 days after final delivery, ensuring all submitted items meet contract requirements without reliance on government sampling to approve defective material. The contract incorporates multiple federal and Department of Defense clauses covering item identification, valuation, security, and compliance, including safeguarding sensitive conventional arms and explosives, mandatory use of Workflow Pro for procurement, and adherence to small business subcontracting and equal opportunity regulations for veterans and workers with disabilities. Transportation of supplies is governed by sea shipment protocols, and payment instructions align with the Wide Area Workflow system using a combined invoice and receiving format. The solicitation, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, requires a signed proposal by August 24, 2026; emailed submissions are accepted, but NECO quotes are non-responsive. The contract references the mandatory use of annual representations and certifications under Deviation 2026-O0043 and is tied to NAICS code 333914 for pump and pumping equipment manufacturing.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details