Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Security System Design, Wiring, and Device Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract calls for the design, wiring, and installation of a commercial-grade intrusion detection system that includes low-voltage wiring, mounting of sensors and glass-break detectors, installation of keypads, and full integration with a central control panel. All work must comply with NFPA 70 standards and applicable Oregon state codes to ensure safety, reliability, and legal adherence. The project requires precise coordination of hardware deployment and system synchronization to deliver a seamless security solution suited for commercial use. The contract is classified as a subcontract under a Total Small Business Set-Aside, designated by NAICS code 238210 for electrical contracting services, and is managed by the Department of the Interior through the Pwr Olym MABO office. It was posted on June 26, 2026, with a response deadline of July 27, 2026, at 8:00 PM. The place of performance and exact location details are not specified, but the work is expected to be executed in compliance with federal procurement guidelines for small business set-asides. Contractors must possess the technical expertise and certifications necessary to meet code requirements and deliver a fully functional, code-compliant security system.

General Info

Design, wire, and install commercial intrusion detection system per NFPA 70 and Oregon codes via small business set-aside.

Agency

Department Of The Interior → Pwr Olym MABO(83000)View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

WA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr Olym MABO(83000)
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Pwr Olym MABO(83000)
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of a commercial-grade intrusion detection system including low-voltage wiring, sensor mounting, keypad and glass-break detector installation, and integration with the central control panel, compliant with NFPA 70 and Oregon state codes.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Main Terminal Improvement Program Emergency PowerThe Main Terminal Improvement Program – Emergency Power project seeks to equip the Main Terminal, concourses, and parking garage with emergency power systems compliant with NEC 700, 701, and 702 requirements, ensuring uninterrupted critical operations in a 24/7/365 airport environment. The contract, issued by the Port of Seattle’s Aviation Project Management Group, has an estimated value of $3,348,000 and will be executed under a two-year term with the possibility of extension at the Port’s sole discretion. Work will be authorized through Service Directives using either firm fixed price or time and expense billing structures, with strict limitations on subconsultant markups—four percent for first-tier and zero percent for second-tier—and no markups allowed on travel, materials, or supplies except for lab services. Billing is monthly with Net 30 payment terms, and consultants must report subconsultant payments electronically via the Port’s Contractor Database System, ensuring transparency in diversity contracting efforts. Proposals must be submitted via email by August 6, 2026, at 12:00 PM PT, with strict formatting requirements including a searchable PDF proposal body limited to eight pages, separate attachments for the Diversity in Contracting Inclusion Plan, Company Information, Resumes, and Evidence of Agreement, and no compressed file attachments permitted. Evaluation prioritizes specialized experience and technical competence of key personnel alongside interview performance, with proposals rated as Outstanding, Good, Acceptable, Marginal, or Unacceptable based on approach, understanding, and risk assessment. Compliance with federal, state, and local laws including Title VI of the Civil Rights Act, Section 504 of the Rehabilitation Act, the Trafficking Victims Protection Act, and Washington State’s Public Disclosure Act is mandatory, along with adherence to non-discrimination and affirmative action obligations that flow down to all subcontractors. Contractors must provide proof of workers' compensation and other specialized insurance coverage, indemnify the Port against negligence-related losses, and maintain all records on generally accepted accounting principles for audit purposes for at least three years post-completion. All deliverables must meet Port-specific standards, including participation in the 30% Design Review and submission of QA/QC checklists, a Design Quality Management Plan, and performance reports, with time being of the essence in all project phases.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the comprehensive design, permitting, and construction of a new camera surveillance system across the Bagwell and North Cargo Operations areas of the Port of Seattle, with the goal of enhancing security and enforcement capabilities through higher-resolution video coverage. Current camera placements, focused primarily on conveyor systems and security doors, will be expanded to include main drive lanes and entrances in the Bagwell area, ensuring improved visibility of vehicle movement and compliance with port regulations. In the North Cargo Operations zone, flexible surveillance will be implemented using Pan Tilt Zoom units to provide dynamic, user-controllable coverage over large surface areas, addressing gaps in existing monitoring. A total of 50 cameras will be installed at 43 distinct locations, combining fixed and adjustable systems to optimize surveillance efficiency and forensic accuracy. The project is led by the Aviation Project Management Group under the Port of Seattle, with Angela Peterson as the primary point of contact and Randa Williams serving as the Project Manager. The work is classified under NAICS code 238210 for electrical contractors and is forecasted with a posted date of July 23, 2026, though no solicitation number or set-aside details are provided. The scope is narrowly focused on operational security enhancement, with no mention of maintenance, training, or future upgrades.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle is planning to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility located in SeaTac, specifically targeting the removal of all PFAS-contaminated components. This project entails the complete dismantling and disposal of the current wet foam system, including tanks, piping, valves, and sprinkler heads contaminated with harmful substances, and the design and installation of a new full dry chemical fire suppression system. The new system will include all necessary components such as reserve tanks, pumps, valves, sprinkler lines, and sprinkler heads, ensuring full compliance with current fire safety standards. All new equipment must be integrated with the facility’s existing fire alarm system to ensure seamless operation and emergency response coordination. This initiative is part of a proactive effort to eliminate environmental and health risks posed by PFAS chemicals previously used in fire suppression. The project is classified under NAICS code 238210 and is being managed by the Port of Seattle’s Aviation Project Management Group. The work is scheduled under a quick turnaround (QTA) framework, indicating urgency and efficiency requirements. Primary point of contact for inquiries is Todd Rehm, with Pat Nakamura serving as the project manager. The solicitation is publicly forecasted with a posting date of July 23, 2026, and all interested parties are directed to the official Port of Seattle procurement portal for further details and future bidding opportunities.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
International
STRUCTURED CABLING INFRASTRUCTURE UPGRADE PARISH COURTS OF JAMAICAThe Court Administration Division of the Judicial Branch of Jamaica is seeking qualified Structured Cabling Contractors to deliver a comprehensive cabling infrastructure upgrade across selected Parish Courts. The scope encompasses the full lifecycle of the project including design, supply, installation, testing, certification, documentation, and commissioning of a modern, standardized structured cabling system. This initiative is integral to the Judiciary’s broader modernization strategy, aiming to establish a secure, scalable, and high-performance network foundation capable of meeting current and anticipated information and communications technology demands. The system must support reliable data transmission, future expansion, and integration with existing and emerging digital services within court facilities. Proposals must be submitted by the response deadline of August 28, 2026, under solicitation number 1519/565, which was posted on July 22, 2026. The contract is managed by Court Management Services under the Government of Jamaica, with all work to be performed at designated Parish Court locations across the country. Contractors are expected to demonstrate proven experience in delivering similar large-scale structured cabling projects with adherence to industry standards for performance, durability, and security. Documentation and certification outputs will be critical components of deliverables, ensuring traceability, compliance, and long-term maintainability of the installed infrastructure.
Court Management Services

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of The Interior → Pwr Olym MABO(83000)

Same awarding agency

NAICS: 238160
New
Federal
Z--FOVA MAINTAIN BLDG 405 ROOFThe contract titled FOVA MAINTAIN BLDG 405 ROOF is a small business set-aside solicitation issued by the Department of the Interior through the Power Olympic MABO office located in Port Angeles, Washington. It seeks qualified contractors to perform roof maintenance and construction services on Building 405 as detailed in the attached Statement of Work, with the North American Industry Classification System code 238160 designating it as a roofing contract. The solicitation was posted on July 16, 2026, and responses are due by August 14, 2026, at 7:00 PM, with all work to be performed at the specified federal facility. The set-aside is designated as a Total Small Business Set-Aside under FAR 19.5, meaning only small business concerns are eligible to compete. Primary point of contact for the opportunity is Michael Abner, reachable via email at michael_abner@ios.doi.gov, though the listed phone number is inactive. The place of performance is not fully specified in the data provided, but the office address and agency location confirm the work will occur in Port Angeles, WA. The contract is being managed under the federal procurement system, and interested parties must submit proposals through the designated SAM.gov portal before the deadline. All work must strictly adhere to the technical and procedural requirements outlined in the Statement of Work to ensure compliance with federal standards and performance expectations.
Roofing Contractors

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 237110
New
Federal
Z--LARO-DRILL NEW WATER WELL - SHERMAN HOMES CABINSThis solicitation, numbered 140P8326Q0046 and titled "Z--LARO-DRILL NEW WATER WELL - SHERMAN HOMES CABINS," is a total small business set-aside under FAR 19.5 for the drilling, construction, testing, disinfection, electrical connection, startup, and commissioning of a new potable water well, designated as Well #1, at the Lake Roosevelt National Recreation Area in Kettle Falls, Washington. The NAICS code is 237110, and the project is managed by the Department of the Interior’s Pwr Olym MABO office. The solicitation is conducted under simplified acquisition procedures per FAR Part 13.106, with award based on the most advantageous offer considering price and other factors, including the offeror’s relevant experience within the last five years. All responses must be submitted electronically to michael_abner@ios.doi.gov by the extended deadline of July 24, 2026, at 2:00 p.m. PDT, and must include a completed SF 1442, price schedule for both the base well and optional second well, technical approach with a detailed work plan, evidence of small business status, active SAM registration, annual reps and certs, and compliance with FAR provisions 52.204-24. The contract requires a lump sum price covering all labor, materials, equipment, mobilization, insurance, overhead, and profit. Successful offerors must provide a site-specific safety plan, liability and workers’ compensation insurance, and both performance and alternative payment bonds. The period of performance is anticipated from August 3, 2026, to November 20, 2026, with work required to commence within ten days of the Notice to Proceed and complete within sixty days thereafter. All construction must comply with OSHA, NFPA 70, EPA, state groundwater regulations, Northeast Tri County Health District well standards, and National Park Service resource protection requirements. The contract incorporates key FAR clauses including 52.236-2 (Differing Site Conditions), 52.236-3 (Site Investigations), 52.225-9 (Buy American—Construction Materials), and 52.211-10 (Commencement, Prosecution, and Completion of Work). Final acceptance depends on potable water lab
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 1 day
View Details
NAICS: 324110
New
Federal
Propane, tank rent and monitor, Mount Rainier NPThe National Park Service, Mount Rainier National Park, is seeking qualified suppliers for a firm fixed-price contract to supply an estimated 62,000 gallons of liquid propane gas annually and provide rental, installation, and maintenance of propane tanks ranging from 120 to 1,000 gallons across multiple remote locations within the park. The contract will consist of a base year with up to four optional years and requires the contractor to furnish, install, connect, test, and maintain all contractor-owned tanks, including replacing 33 existing vendor-owned units as determined at award. Propane deliveries must occur Monday through Friday between 8:00 a.m. and 5:00 p.m., with urgent or emergency deliveries permitted under coordination, and response times require immediate action for alerts below 20% tank capacity and within 24 hours for any emergency situation, while maintaining a minimum 15% capacity threshold unless otherwise authorized. All tank systems must be monitored via remote wireless technology that automatically alerts the contractor to low levels, and the annual rental fee for tanks must be bundled into the per-gallon propane price. The contractor must ensure all installations and operations comply with NFPA 58, DOT, EPA, OSHA, and all Department of the Interior and National Park Service regulations, and must use only licensed and certified personnel holding commercial driver’s licenses with hazardous materials endorsements. All deliveries originate from the park headquarters in Ashford, Washington, and span locations up to 85 miles away, requiring the contractor to account for challenging terrain, long travel distances, and seasonal weather. The contractor is fully responsible for cleanup and reporting of any hazardous material spills to the Mount Rainier National Park Dispatch Center at (360) 569-6600 and must perform annual inspections on all regulators, documenting findings and immediately notifying the contracting officer of any issues. This solicitation is a sources sought notice under NAICS code 325120, Industrial Gas Manufacturing, with a small business size standard of 1,200 employees, and is not a competitive request for proposals; responses are being gathered to inform future acquisition planning. Interested vendors must submit responses by email to hal_hoversten@ios.doi.gov no later than 12:00 p.m. Pacific Time on July 2, 2026, including a reference to this notice, company name, address, telephone, SAM.gov UEI (if applicable), website, business size classification, and
Petroleum Refineries

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 238210
New
Federal
MORA LONGMIRE FIBER INSTALLThe contract titled MORA LONGMIRE FIBER INSTALL seeks the installation of fiber optic conduit and cabling in compliance with a detailed Statement of Work, under solicitation number 140P8326Q0056, issued by the Department of the Interior through the Pwr Olym MABO office located in Port Angeles, Washington. This procurement is specifically set aside for Service-Disabled Veteran-Owned Small Businesses, identified by NAICS code 238210, ensuring eligibility and participation from qualified veteran-owned contractors. The solicitation was posted on July 20, 2026, with a response deadline of August 18, 2026, at 7:00 PM Eastern Time, and interested parties must submit proposals prior to this cutoff to be considered. The place of performance details are currently unspecified, though the office managing the contract is based in Washington State, and the primary point of contact is Michael Abner, reachable via email at michael_abner@ios.doi.gov. Interested bidders are directed to the SAM.gov portal for full access to the solicitation documents and requirements, where they can review the accompanying Statement of Work to understand the technical specifications, timelines, and compliance expectations for the fiber optic infrastructure project. All work must align precisely with the stated objectives, and contractors are expected to demonstrate capability in executing fiber optic installations in accordance with federal standards and guidelines.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in 26 days
View Details
NAICS: 238910
Federal
OLYM - FAIRHOLME CG ABAAS IMPROVEMENTSThe National Park Service’s Olympic National Park is seeking to complete ABAAS improvements and construct family restroom foundations at Fairholme Campground in Clallam County, Washington, under a Total Small Business Set-Aside solicitation numbered 140P8326R0006. The work includes building 12'x12' foundations, floor slabs, retaining walls, aprons, and sidewalks for the Loop A and Loop B comfort stations, along with installing stairs, ABAAS ramps, and handrails at Loop A. Utility rough-ins for the family restroom foundations are required, as well as new or improved ABAAS-compliant trails connecting campsites 3, 4, 16, 45, and 69, including a crosswalk at site 16. ABAAS enhancements to these campsites and the removal, repair, and reinstallation of signage at both comfort stations are also part of the scope. Option items allow for additional work, such as constructing ABAAS trails and asphalt-paved parking areas for campsites 3 and 4, and similarly for campsites 45 and 69. The contract will be awarded as a single firm-fixed-price agreement under NAICS code 238910 for Site Preparation Contractors, reserved exclusively for small businesses with average annual gross receipts under $19 million over the past three years. All work must comply with local, state, and federal laws, and the contractor is responsible for securing all necessary permits. The solicitation, posted on July 16, 2026, requires proposals to be submitted through SAM.gov by August 18, 2026, with an anticipated RFP release around July 15, 2026. Offerors are strongly encouraged to conduct a site inspection, though it is not mandatory. Award will be made on a best value basis, considering price, project experience, schedule, past performance, and possession of a valid Washington State contractor license, following FAR Part 13 procedures.
Site Preparation Contractors

POSTED

7 days ago

DEADLINE

in 25 days
View Details
NAICS: 561621
Federal
N--Security System InstallationThis solicitation, numbered 140P8326Q0045, is a total small business set-aside under FAR 19.5 for the installation of a commercial-grade intrusion detection system at the John Day Fossil Beds Maintenance Shop in Kimberly, Oregon. The project requires a lump sum price covering all labor, materials, equipment, mobilization, insurance, overhead, profit, and contract administration necessary to fully implement a secure, supervised system that integrates with the Government’s existing central station monitoring service. The scope includes installing an intrusion control panel and keypad near Corridor 108, contacts on four exterior personnel doors, three heavy-duty overhead-door contacts, eight office-window contacts, a glass-break detector if needed, and ensuring all components are functionally and physically separate from the existing fire alarm system except where required for life-safety interfaces. Work must commence within ten calendar days of award and be completed by December 15, 2026, with performance restricted to a firm-fixed-price purchase order under the SF 1442 form. Quoting entities must be registered and active in SAM.gov with current representations and certifications, including compliance with the Federal Acquisition Supply Chain Security Act, Buy American provisions, and specific telecommunications equipment disclosures. All submissions must be sent electronically to Suellen_Mayo@ios.doi.gov with the solicitation number in the subject line, include the completed SF 1442 with blocks 14–20C filled and signed, and must acknowledge any amendments. Offerors must also submit a price schedule, relevant experience documentation, technical approach, and certifications including 52.204-24. The procurement uses simplified acquisition procedures and evaluates based on best value, weighing price, relevant experience with similar projects including fire alarm control panels, and past performance. Upon award, the contractor must provide a site-specific safety plan, comply with Davis-Bacon wage rates for Grant County, Oregon, maintain liability and workers’ compensation insurance per Oregon law, carry a performance bond, and submit electronic invoices through the U.S. Treasury’s IPP system with detailed supporting documentation. Inspection and acceptance require pretesting of all system components at 100 percent, a final test with the COR present and written verification of signal receipt to the monitoring provider, and all system software must be the manufacturer’s current stable release. Work is subject to government oversight at all times, and archeological discoveries must be reported immediately with operations halted at the discovery site while continuing elsewhere.
Security Systems Services (except Locksmiths)

POSTED

9 days ago

DEADLINE

in 4 days
View Details
NAICS: 336612
Federal
28--LARO PATROL BOAT RE-POWERThe Department of the Interior, through the National Park Service’s Pwr Olym MABO office in Port Angeles, Washington, is soliciting bids under a Total Small Business Set-Aside for the re-powering of the “Seahawk,” a 26-foot Rogue enclosed cabin patrol boat used for law enforcement and transportation at Lake Roosevelt NRA. The contract requires the replacement of a single Mercury Verado 300XL L6 engine with two new Mercury Verado 150 HP inline four-cylinder outboard motors, along with full integration of new controls, wiring, electronic displays, stainless steel propellers, throttle knobs, and engine harness assemblies. The system must be seamlessly integrated with the existing Garmin navigation package via NEMA 2000 data protocol. The work includes a mandatory sea trial coordinated with the Contracting Officer’s Representative to verify operation and conformance to specifications. The period of performance runs from approximately July 20, 2026, to February 5, 2027, with delivery of the vessel to the contractor’s facility no earlier than October 5, 2026. All work must be performed on an FOB Destination basis, and final acceptance requires formal government sign-off indicating the deliverable has been received, inspected, and found to conform to contract requirements. This solicitation is issued under NAICS code 336612 as a total small business set-aside, and only offerors registered as active small businesses in SAM with a qualifying NAICS code may respond. Proposals must be submitted as a single PDF via email to the designated point of contact by noon PT on July 10, 2026, using the SF-1449 form with detailed pricing for two line items. Offerors must include comprehensive information on their business, UEI and CAGE codes, point of contact details, proposed team structure, and subcontractors. Mandatory compliance clauses include the prohibition on certain telecommunications and surveillance equipment, accelerated payments to small business subcontractors, service contract labor standards, Buy American requirements, and preference for U.S.-flag vessels. Offerors must also complete representations related to exclusions, trafficking in persons, and whistleblower rights, and if applicable, disclose any use of covered telecommunications equipment with full details on brand, model, manufacturer, and use justification. Award will be made on a best-value basis with price weighted at 50%, and technical capability and past performance combined equaling the remaining 50%.
Boat Building

POSTED

13 days ago

DEADLINE

in 1 day
View Details