Seeley County Water District Wastewater Treatment Plant Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Seeley County Water District is undertaking improvements to its Wastewater Treatment Plant to address ongoing compliance issues caused by increasingly concentrated wastewater flows resulting from water conservation efforts in the community of Seeley, California. The existing plant, designed for a capacity of 0.25 million gallons per day but currently treating an average of 0.11 MGD, has failed to meet effluent standards, leading to violations, an Administrative Civil Liability Complaint with mandatory penalties, and a Time Schedule Order. To resolve these issues and prepare for future regulatory requirements, the district plans to upgrade the secondary treatment system from a pressure sand filter to a membrane bioreactor system, which will enhance treatment performance and reliability while maintaining compliance. The upgraded facility will have a treated flow capacity of 0.15 MGD—lower than the original design but sufficient to handle projected growth in the 2.26-square-mile service area. The proposed improvements also include on-site enhancements to support the new MBR system and overall plant operations. These upgrades are intended to ensure long-term operational stability and regulatory adherence despite continued reductions in water consumption across the community. The district retains ownership and operation of the plant, and the project is formally identified as the Seeley County Water District Wastewater Treatment Plant Improvements Project, with official information listed under a forecast notice posted in June 2026. Primary contact for the project is Miriam Rosales, Administrative General Manager and Secretary of the Board, with technical support provided by Hazen and Sawyer’s Senior Principal Scientist, Trapa Barua, and the project is located in Seeley, California, with a zip code of 92273.

General Info

Seeley County Water District upgrades wastewater plant to MBR system for compliance and future growth.

Agency

California → Seeley County Water District (SCWD)

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Main Street and New River Blvd, CA, 92273

Set-Aside

NONE

Documents

(4)

NOA and NOI for Seeley County WWTP Improvements 2026

PDFspecial-notice

Seeley County Water District Wastewater Treatment Plant Improvements Notice of Completion

PDFnotice-of-completion

Seeley County Water District WWTP Improvements Summary Form 2026

PDFenvironmental-summary

SCWD ISMND_Submittal_Revised_20260701_clean

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Seeley County Water District (SCWD)
Contacts2 people available
OfficeN/A
Organization / Agency
California → Seeley County Water District (SCWD)
Office AddressN/A
Contacts
Miriam RosalesAdministrative General Manager and Secretary of the Board
Trapa BaruaSenior Principal Scientist

Interested Companies (1)

Show more
Hazen and Sawyer
Hollywood, Florida

Full Description

Show more
The Seeley County Water District owns and operates the Wastewater Treatment Plant (WWTP). The District serves the community of Seeley, California, providing water and wastewater services within a 2.26-square-mile service area. Collected wastewater is treated at the District's WWTP. The existing WWTP consists of a septage receiving facility, an influent lift station with coarse screen, primary treatment consisting of an aerated pond treatment system that includes pre-aeration and aeration ponds, effluent pumping, secondary treatment that consists of pressure sand filters, and an ultraviolet (UV) disinfection system. The existing WWTP is designed for a treatment capacity of 0.25 million gallons per day (MGD) with current average annual daily flows of 0.11 MGD. The existing WWTP is in good condition but is incapable of handling the more concentrated wastewater stream that has been created over the years from conservation measures that lower water consumption throughout the service area. This has led to failure to comply with effluent requirements and notices of noncompliance including an Administrative Civil Liability Complaint with Mandatory Minimum Penalties (MMPs) for effluent violations and a Time Schedule Order. The goal of the project is to improve treatment performance to conform to resolve recent effluent violations and allow the WWTP to adjust operations to accommodate future changes in effluent limits. The proposed upgrades of the WWTP will result in a treated flow capacity of 0.15 MGD, lower than the facility’s current design capacity and permitted effluent flow limit but still capable of accommodating increases in flow associated with future growth in the service area. Project upgrades primarily consist of upgrading the WWTP’s secondary treatment system from a pressure sand filter system to a membrane bioreactor (MBR) system as well as several on-site improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Solicitation # W912DR26BA011
The contract involves maintenance dredging of approximately 2,250,000 cubic yards from federal navigation channels serving the Port of Baltimore, with operations scheduled between November 2026 and March 2027. All dredging will be conducted to a target depth of 50 feet mean lower low water, with an additional half-foot of overdepth permitted. About 1,538,000 cubic yards will be removed from the Maryland approach channels including Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels, and transported to the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. The remaining 700,000 cubic yards will be dredged from Baltimore Harbor Channels—specifically Brewerton Angle and Curtis Bay Channels—and deposited at the Cox Creek Dredged Material Containment Facility. The work occurs within active commercial shipping lanes, requiring careful coordination to maintain port operations. The operation will utilize two or more 30 cubic yard or larger clamshell dredges, hydraulic unloaders, tugs, large material scows, and supporting equipment such as drag bars and pipelines. Dredged material will be loaded and transported via scows, with the entire project to be completed within 120 calendar days after receipt of the Notice-to-Proceed. The solicitation, titled Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD, is issued under solicitation number W912DR26BA011 by the Department of Defense through the W2SD Endist Baltimore office. The opportunity was posted on July 16, 2026, with responses due by August 25, 2026. The North American Industry Classification System code is 237990, indicating it falls under Other Heavy and Civil Engineering Construction. The primary point of contact is Ashley Flaherty, reachable via email and phone listed in the contract data, and the work will be performed in the waters adjacent to Baltimore, Maryland, with a place of performance designated as ZIP code 21201. No set-aside provisions are specified, and the contract is being procured under standard federal procedures.