Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Sheet Piling Installation involves the supply and installation of metal sheet piling to provide floodwall containment or stabilization for prime contractors on USACE projects. The scope of work requires the driving of structural steel piles that conform to ASTM A6/A6M and ASTM A572/A572M standards using specialized pile driving equipment. All welding must adhere to AWS D1.1/D1.1M or AWS D1.5M/D1.5 specifications, and applied coatings must meet SSPC PA 1 requirements to ensure a fully compliant installed sheet pile wall. Managed by the Public Works (D&C) agency in Virginia under NAICS code 238910, the solicitation was posted on September 29, 2026. Interested parties must submit their responses by the deadline of October 29, 2026.

General Info

Place of Performance

VA, USA

Set-Aside

NONE

Documents

This scope was carved out of 27012.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CSRM Phase 1A Floodwall Construction - Preload & Wick Drains

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Public Works (D&C)
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → Public Works (D&C)
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs metal sheet piling for floodwall containment or stabilization for prime contractors on USACE projects. Drives structural steel piles conforming to ASTM A6/A6M and ASTM A572/A572M using pile driving equipment. Welding must conform to AWS D1.1/D1.1M or AWS D1.5M/D1.5 and coatings must meet SSPC PA 1. Delivers an installed sheet pile wall.

Similar Contracts

Same NAICS industry code

More opportunities from Virginia → Public Works (D&C)

Same awarding agency

NAICS: 237990
New
SLED
CSRM Phase 1A Floodwall Construction - Preload & Wick Drains
Solicitation # 27012
The City of Norfolk Department of Public Works is soliciting unit price bids for Project 27012, the Coastal Storm Risk Management Phase 1A Floodwall Construction - Preload and Wick Drains. Located along Water Street from the Berkley Bridge to the proposed Harbor Park Pump Station, the project involves critical ground improvement to prepare for future floodwall construction. The scope of work includes the installation of prefabricated vertical wick drains, pre-drilling, embankment fill, and pervious sand medium. Additionally, the contractor is responsible for installing piezometers and settlement plates for geotechnical monitoring, constructing both temporary and permanent sheet pile walls, and managing site work such as grading, dewatering, and erosion and sediment control. The contract is governed by AIA A201-2017 General Conditions and requires strict adherence to federal and state regulations, including the Davis-Bacon Act for prevailing wages and the Buy American Act for materials. Bidders must submit their proposals by October 29, 2026, accompanied by a bid guarantee of 5 percent of the total bid amount. The City of Norfolk serves as the sole contracting agency for administration and quality assurance, while the U.S. Army Corps of Engineers acts as the Designer of Record. Key requirements include the maintenance of a comprehensive Quality Control program, compliance with USACE EM 385-1-1 safety standards, and the hosting of a partnering session within 45 days of the contract award. Hazardous materials handling must conform to DOT and CFR standards, and invoicing is processed through Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS