Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SHELL, CARGO, ASSY

Closed
SPE7L3-26-T-135FFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the procurement of four units of a Shell, Cargo, Assembly identified by NSN 2510-01-473-4043, with a delivery requirement 261 days after award. All components must comply with qualified products or manufacturers lists (QPL/QML) as specified, and only approved sources may be used. The use of Class I ozone-depleting chemicals is strictly prohibited, and any substitute chemicals require prior approval unless explicitly authorized by the governing specification. Final inspection and acceptance must occur at the contractor’s manufacturing facility, requiring technical inspection with full access to drawings and technical data; count, kind, and condition inspections are not acceptable. First Article Testing is mandatory for three units, with the contractor providing 30 days’ notice prior to testing and the government having 60 days to review the results. The testing process will consume no units destructively, and three non-destructed units will be retained as manufacturing standards and included in the final delivery, though the approved first article itself cannot be shipped as a new part. Cybersecurity compliance requires CMMC Level 2 certification by a certified third-party assessment organization. Technical data associated with this item is subject to ITAR or EAR export controls, and access is restricted to contractors with approved US/Canada Joint Certification Program status, completed DOD export control training, and formal DLA authorization. Distribution of such data to foreign persons, whether domestic or abroad, is prohibited without proper clearance. The contract was solicited under SPE7L3-26-T-135F with a response deadline of August 7, 2026, and performance is designated for New Cumberland, PA.

General Info

Procure four NSN 2510-01-473-4043 shells with QPL/QML compliance, CMMC Level 2, ITAR/EAR controls, and first article testing in New Cumberland, PA.

NAICS

336211 - Motor Vehicle Body Manufacturing

Place of Performance

2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USA

Set-Aside

NONE

Documents

1

RFQ SPE7L3-26-T-135F DLA Land and Maritime Vehicle Support

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → LAND SUPPLIER OPNS VEHICLE SPT
Contacts1 person available
OfficeUSA
Office AddressUSA
Contacts

Full Description

Show more
SHELL,CARGO,ASSY
SHELL, CARGO, ASSEMBLY.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS
LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A
SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR
QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN
PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED
MANUFACTURERS LIST (QML)" APPLY.
THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML
REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE
QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE
QPL(S)/QML(S).
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
"FINAL INSPECTION AND ACCEPTANCE OF THE ITEM
SHALL BE AT THE ACTUAL MANUFACTURING FACILITY.
TECHNICAL INSPECTION IS REQUIRED. THE
CONTRACTOR SHALL MAKE DRAWINGS AND TECHNICAL
INFORMATION AVAILABLE TO VERIFY THAT THE ITEM
MEETS ALL TECHNICAL REQUIREMENTS.
COUNT, KIND, AND CONDITION INSPECTIONS ARE
NOT ACCEPTABLE. THIS NOTE TAKES PRECEDENCE OVER
MASTER SOLICITATION PART ONE PROVISIONS, NOTE 6,
QUOTATIONS BY NON-MANUFACTURERS (APR 1984,
DCSC 52.217-9C01). FINAL INSPECTION OF
PACKAGING, IF REQUIRED, MAY BE CONDUCTED
ELSEWHERE."
First Article ApprovalContractor testing (FAR 52.209.3) PADDS Clauses (IF60005 and ES7032) Number of units subject to First Article Testing: 3 see attached file DLA TPP 5YR 4043 FIRST ARTICLE TEST.docx Number of days before start of testing when the contractor has to provide notice: 30
SPE7L3-26-T-135F
SECTION B
Number of days the Government has to approve or disapprove the report: 60 Estimated length of time for Contractor testing: 60 days Notice Regarding FAT Sample (PADDS Clause ES6304) Number of First Article test sample units that shall be consumed or destroyed in testing: 0 Number of test sample unit(s) that will be tested less the destructive test and shall serve as a manufacturing standard and be shipped as part of the last lot: 3 The approved first Article SHALL NOT serve as a Manufacturing Standard because it CANNOT be shipped in as a New Part.
RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO) RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)
RQ032: EXPORT CONTROL OF TECHNICAL DATA
This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.
The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. NSN/Part Number: 2510-01-473-4043 Quantity: 4 EA Purchase Request: 7011410299QTY: 4 Delivery: 261 days ADO

More opportunities from Department Of Defense → LAND SUPPLIER OPNS VEHICLE SPT

Same awarding agency

NAICS: 339991
New
DIBBS
GASKET
Solicitation # SPE7L3-26-T-218F
Solicitation SPE7L3-26-T-218F is a fixed-price procurement issued by the DLA Land and Maritime, Land Supplier Ops Vehicle Support for the acquisition of four gaskets, identified by NSN 5330014187334 and Curtiss-Wright Electro-Mechanical Corp part number 316B1731-1. The contract requires delivery to the DLA Distribution DDSP New Cumberland facility in Pennsylvania by July 25, 2027, with a delivery timeline of 316 days. Shipping terms are established as FOB Origin, while both inspection and acceptance will occur at the destination. The procurement includes strict material and quality mandates, specifically prohibiting the use of asbestos per FED-STD-313 and the intentional addition of mercury. Due to the item's classification, it must be sealed in a medium duty, waterproof, greaseproof, opaque bag according to MIL-DTL-117, Type II, Class C, Style 1 to prevent UV deterioration. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, with palletization following RP001 requirements. Compliance is required for several federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 regarding cybersecurity and safeguarding covered defense information. Offerors must be registered in the System for Award Management and are prohibited from using additive manufacturing processes unless specifically authorized. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
Gasket, Packing, and Sealing Device Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 339991
New
DIBBS
GASKET, SPIRAL WOUND
Solicitation # SPE7L3-26-T-213T
Solicitation SPE7L3-26-T-213T is a fixed-price procurement issued by the Department of Defense, specifically the DLA Land and Maritime Land Supplier Ops Vehicle Support, for two spiral wound gaskets (NSN 5330-01-460-6673). The items must be supplied by Dresser Rand Co (P/N B645D115N09) and must be strictly free of asbestos. Additionally, the contract prohibits the use of Class I ozone-depleting chemicals and the intentional addition of mercury or mercury-containing compounds. The delivery is required within 244 days, with a need ship date of May 11, 2027, to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. Shipping terms are FOB Origin under the First Destination Transportation program. Technical compliance requires adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Hazardous materials must be labeled according to the Hazard Communication Standard 29 CFR 1910.1200. Inspection and acceptance will occur at the destination per FAR 52.246-2. Payment and invoicing must be processed electronically through the Wide Area WorkFlow system. The solicitation is categorized under NAICS code 339991 and includes a HUBZone price evaluation preference. It also incorporates various FAR and DFARS clauses regarding cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
Gasket, Packing, and Sealing Device Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS