Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on August 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoreline Protection Repairs, Musgrave Harbour, NL

Closed
30005953Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Government of Canada → Fisheries and Oceans Canada

NAICS

N/A

Place of Performance

*Musgrave Harbour *Newfoundland and Labrador, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Fisheries and Oceans Canada
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Fisheries and Oceans Canada
Office AddressN/A
Contacts
Tammy O'ToolePoint of Contact

Full Description

Show more
Shoreline Protection Repairs – Phase 2 Musgrave Harbour, NL C2-00752 The scope of work for this project is the provision of construction activities for Phase 2 for the shoreline protection repairs at Musgrave Harbour, NL. 1. Complete removal of the existing armour stone in the locations noted on the drawings to facilitate new work. Note that the existing stones removed can be re-used in the new work if it meets the size and requirements specified. Salvage, stockpile and sort all existing stones to be re-used. Excess stones, or stones that do not meet the specified requirements, to be disposed of on-site at a location approved by the Departmental Representative. 2. Remove existing topsoil and grass along shoulder of road and toe of armour stone,asindicated on the drawings. 3. Remove any debris and side cast any accumulated sea vegetation (kelp) from area of new work, as indicated on the drawings. 4. Supply and install new rock core, geotextile, filter stone and armour stone, as shown on the drawings. 5. Regrade, level and compact existing road shoulder, as indicated on the drawings. Supplement with and install granular base if required. 6. Contractor shall contact NF Power prior to start of work to obtain an Energized Power Line Permit. Coordinate all work with NF Power and ensure all requirements for working near poles and power lines are met. 7. This is an active fishing site, therefore, contractor shall coordinate work as necessary as not to disrupt ongoing activities in the uplands area. Maintain full vehicle and vessel access to adjacent roadways and wharfs at all times. Provide and maintain temporary traffic control devices with flag operators, if required, to approval of Departmental Representative and all other governing authorities. The Contractor must perform and complete the Work by March 31st , 2025.