Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Shoring and Barricading Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of Doc342127147.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPakistan Refinery Limited
ContactsNo contacts available
OfficeN/A
Organization / AgencyPakistan Refinery Limited
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs temporary structural supports and safety barriers for prime contractors on KWSC pipeline projects. Installs shoring to prevent trench collapse and sets up barricades, planks, and scaffolding for site access and stability. Adheres to HSEQ and area-specific safety standards. Delivers a secured and barricaded excavation site compliant with safety regulations.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is soliciting proposals under RFP-VC-26-008 for licensed general contractors to provide on-call maintenance and minor construction services in California. This Master Services Contract will utilize a time-and-materials structure with work assigned via Task Orders. The scope of work includes millwright work, welding, fire sprinkler system maintenance, general construction such as framing and concrete, and the maintenance of conveyors, hoppers, and heavy equipment. A critical requirement is the ability to respond to site failures within 1.5 hours. The Authority intends to award multiple contracts based on an evaluation of price, payment terms, the nature of any exceptions taken to the RFP, personnel experience, and the quality of the proposed work plan. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 p.m. Qualified contractors must be registered with the Department of Industrial Relations and adhere to California Labor Code prevailing wage requirements. Key financial and legal obligations include maintaining commercial general liability insurance of at least $1,000,000 per occurrence and providing performance and payment bonds for any Task Order exceeding $25,000. The contract offers an expedited payment protocol where contractors can receive payment in 10 to 20 days in exchange for a 1% to 5% invoice reduction; otherwise, standard payment terms are 30 days. All work must comply with OSHA safety standards, and the Authority retains ownership of all project-related data and materials.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Pakistan Refinery Limited

Same awarding agency

NAICS: 237120
New
International
EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE
Solicitation # Doc342127147
Pakistan Refinery Limited is seeking sources for the excavation and backfilling or joints repair work of the KWSC pipeline in Pakistan. The scope of work involves excavation across various surfaces including concrete, soil, rock, or roads, with an estimated total quantity of 24,000 square feet. Key technical requirements include backfilling in layers not exceeding 6 inches in depth, compacting to 95 percent ASHTO dry density, and performing dewatering as needed. The contractor is responsible for all barricading and shoring using planks and scaffolding in accordance with HSEQ and area standards. Payment for excavation will be based on actual work performed, subject to the satisfaction of the Engineer or Client Representative. Potential contractors are evaluated based on their company profile, legal status, and registration with local authorities such as FBR, SRB, EOBI, and SESSI. Critical evaluation criteria include a proven track record in the oil and gas industry, supported by a client list and official work orders. Applicants must demonstrate the availability of experienced staff and necessary equipment, provide their annual turnover and income tax return acknowledgments, and submit a comprehensive HSEQ competence policy. The solicitation, identified as Doc342127147, was posted on October 23, 2026, with a response deadline of November 4, 2026.
Oil and Gas Pipeline and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237120
New
International
REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION
Solicitation # Doc342008664
Pakistan Refinery Limited is seeking sources for the replacement of the KWSC pipeline from the KWSC valve pit towards the PRL 1000-RFT section. The scope of work involves comprehensive excavation and backfilling in various terrains, including concrete, soil, and rock, with a requirement for at least 25 manual test pits to identify underground utilities. Key technical specifications include backfilling compacted to 95% ASHTO dry density and the installation of heat or butt fusion joints in accordance with ASTM 2164. Additionally, the project requires the installation of an MS 16 inch diameter globe valve, which must be approved by the relevant PRL department prior to installation. The contractor is held to strict safety and quality standards, including the provision of hard barricades and safety signage every 50 feet, the use of steel scaffolding for shoring, and the installation of bores for dewatering. All machinery, cranes, and operators must be third-party certified. Evaluation of potential contractors will be based on company profile, corporate status, annual turnover, and proven experience within the oil and gas industry, including HSEQ competence and the availability of experienced staff and equipment. The final acceptance of the work is subject to the satisfaction of the Engineer or Client Representative following hydrotesting and a commissioning phase.
Oil and Gas Pipeline and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS