Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoulder Backing Repair Project

Closed
4710State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Shoulder Backing Repair Project, solicited under number 4710 by the California Department of General Services, Construction Division, requires the furnishing of all labor, materials, equipment, and incidental work necessary to complete roadway restoration activities along White Rock Road and Scott Road in Sacramento County. The scope includes rebuilding eroded shoulders and roadside ditches, reconstructing failing roadway segments, replacing a 12-inch corrugated steel pipe culvert on White Rock Road, and performing related excavation, material placement, and pavement restoration using AB Class 2 aggregate and HMA Type A. The project is structured with a base bid covering White Rock Road Location 1 and two optional alternatives—Alternative A for White Rock Road Location 2 and Alternative B for Scott Road—with all work required to be completed within thirty working days from project commencement, during which no excavation or soil disturbance may occur prior to the official start of the timeline. Quantities listed in the specifications are approximations only, and the County retains full discretion to adjust actual quantities performed. All work must strictly conform to the Sacramento County Standard Construction Specifications, Special Provisions, and applicable federal, state, and local regulations, including compliance with Buy America requirements for steel and iron, prohibition of certain telecommunications and video surveillance equipment, and adherence to environmental and safety standards per 23 CFR Part 635 and other applicable laws. The contract mandates payment and performance bonds issued by an approved corporate surety, a bid bond for submission, and compliance with insurance requirements including general liability, automobile liability, workers compensation, and contractor’s pollution liability. Contractors must hold a valid California contractor’s license and be registered with the California Department of Industrial Relations under Labor Code Section 1725.5, and must submit certifications regarding debarment, suspension, and lobbying activities via SAM.gov, including UEI and legal entity name verification. Certified payrolls must be submitted weekly for any work subject to Davis-Bacon requirements, and subcontractor payment reports using Exhibit 9-P are required by the 15th of each month following payment. Quality control is the contractor’s sole responsibility, requiring at-cost testing and inspection of materials and workmanship, with the County conducting independent Quality Assurance Program sampling. Non-conforming work must be removed and replaced at the contractor’s expense, and substitutions require written proof of equivalent performance. The County will award the contract to the lowest responsible and responsive bidder based on the total bid amount including base and all alternatives, with bid submissions required electronically via the SACCOUNTYEBIDS

General Info

Shoulder Backing Repair Project for Sacramento County requiring labor, materials, compliance, bids by June 11, 2026.

Documents

6

County of Sacramento Contract 4710 Shoulder Backing Repair Project Special Provisions

PDF, High priority: read this firstspecial-provisions
High

FHWA-1273 Required Contract Provisions for Federal-Aid Construction Contracts 10.2023

PDF, High priority: read this first14 pages · contract-document
High

Sacramento County Shoulder Backing Repair Project IFB 4710

PDF, High priority: read this firstifb
High

4710 Shoulder Backing Repair Project Plans

PDF, Low priorityother
Low

AdTech Advertising System New Print Order 4710

PDF, Low priorityorder
Low

Attachment 2 Title VI Assurances

PDF, Low priority4 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → DGS: CAPSD - Construction
Contacts2 people available
OfficeSacramento, CA, 95827, USA
Office AddressSacramento, CA, 95827, USA
Contacts
Tim StevensSenior Civil Engineer
Jesse SanchezSr. Contract Services Officer

Interested Companies (29)

Martin General EngineeringRancho Cordova, CA
AP Traffic ServicesMather, CA

See All 29 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.

More opportunities from California → DGS: CAPSD - Construction

Same awarding agency

New
SLED
Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project
Solicitation # 41022
The Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project, solicitation number 41022, is a construction contract issued by the County of Sacramento's Department of Transportation. The project involves providing all labor, materials, and equipment for tree removal, with stumps remaining two feet above grade, the implementation of traffic control, and the installation of ESA fencing. The estimated construction cost is 150,000.00 dollars, and the contract will be awarded to the lowest responsible and responsive bidder. Key requirements for award include a valid California contractor's license, registration with the Department of Industrial Relations, and compliance with CARB Advanced Clean Fleets regulations. The project must be completed within twenty working days, subject to a holiday moratorium from December 18 through January 1 and the Thanksgiving weekend. The contractor is required to obtain a Caltrans Encroachment Permit and adhere to strict ADA compliance and federal access laws. Quality assurance is managed through the Sacramento County Materials Test Lab, and the contractor is responsible for all quality control testing and the maintenance of water pollution control best management practices. Bids must be submitted electronically via the SacCountyEbids portal by November 12, 2026, and must include a bid security of at least ten percent of the aggregate bid. Payment processing is handled through the County's PaymentWorks portal.

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 238210
SLED
Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System
Solicitation # 41010
The County of Sacramento is soliciting bids for solicitation number 41010 to refurbish the non-functional Raychem Tracetek leak detection system for sanitary and pressure water lines at the Main Jail facility located at 651 I Street. The project involves replacing the leak detection panel in the basement and refurbishing water sensing cables, zone connectors, leader cables, and control modules within pipe chases. The system must be integrated with the facility's building management system for alarm and fault monitoring. The estimated construction cost is 148,590.00 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. The period of performance is 90 calendar days. Qualified contractors must hold a C-7 Low Voltage Systems Contractor license and utilize technicians certified by the system manufacturer. Due to the secure nature of the correctional environment, all personnel must pass background checks, adhere to strict security protocols, and be escorted while onsite. Work on the second and third floors is restricted to the hours of 12pm to 4pm. Safety requirements include the use of N95 or P-100 respirators in designated pipe chases. Bidders must submit their proposals electronically via OpenGov by November 5, 2026, at 2:00 pm, and must provide a bid guarantee along with proof of DIR registration. Final acceptance of work is contingent upon the submission of record drawings and successful insulation resistance testing.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

14 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS