Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on July 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Clearing and Grubbing

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 5 days
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for four Pre-Commercial Thinning (PCT) contracts in the 21 Mile area. The project encompasses a total of 120.1 acres divided into four units: Unit A (56.3 acres), Unit B (38.4 acres), Unit C (41.5 acres), and Unit D (40.2 acres). The scope of work requires contractors to identify high-quality crop trees and remove competing trees and shrubs according to specific thinning standards, including maintaining stump heights under 5 inches and clearing slash from roadways and streams. Bids must be submitted physically via the locked drop-off box at the San Poil Forestry Office by 4:00 PM on October 29, 2026; electronic submissions are not accepted. To be considered, offerors must provide a comprehensive bid packet including a detailed work plan, contractor liability insurance, sam.gov verification, and TERO compliance and utilization forms. Evaluation is based on technical qualifications, price reasonableness, and responsibility, with a strong emphasis on Indian preference in contracting and subcontracting. Payment is issued per accepted acre, with 20% of each payment withheld until final approval. Contractors must adhere to the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation and are encouraged to maintain a valid Trader License and TERO Title ID certification to avoid associated fees.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for pre-commercial thinning services across two units in the McAllister Creek logging area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, specifically Unit 313-040 (10.33 acres) and Unit 313-035 (13.44 acres). The scope of work requires the contractor to identify and maintain desirable crop trees by removing competing trees and shrubs, including brush and hardwoods within a four-foot radius of leave trees. Performance standards include strict stump height limits of less than five inches, a maximum slash height of 24 inches, and specific bucking requirements for Ponderosa pine cut between January 1st and July 31st. Bids must be submitted in a sealed envelope labeled McAllister Creek PCT 2027 by 4:00pm on November 17, 2026. A complete bid package must include a bid sheet, bid evaluation form, contractor's work plan, TERO compliance and utilization form, and a certification regarding debarment, suspension, and responsibility. Payment is based on a bid price per acre for accepted acreage, with 20 percent of each payment held back until final acceptance. Contractors must provide proof of liability insurance and adhere to TERO Title X compliance and TOSHA safety regulations. The project is aligned with the FY2026 period from October 1, 2026, to September 30, 2027, and maintains an Indian preference policy for all products and supplies.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 115310
New
Federal
Green Mountain Finger Lakes Invasive Species Map and Control
Solicitation # 12444726Q0053
Solicitation 12444726Q0053 is a HUBZone Small Business set-aside request for quotation issued by the USDA Forest Service for the mapping and control of non-native invasive plant species within the Green Mountain and Finger Lakes National Forests in Vermont. The contractor is required to survey, map, and treat invasive species across various environments, including timber harvest units, disturbance corridors, and developed sites, using a combination of manual, mechanical, physical, and chemical treatments. Key technical requirements include the use of GPS/GIS technology for data collection and the mandatory use of aquatic-safe herbicides near wetland areas. The period of performance is scheduled from January 1, 2027, to December 31, 2027. The scope of work is divided into several line items covering herbicide applications via cut stump, basal bark, and foliar methods, as well as population surveying and mobilization. To be eligible, the contractor and on-site supervisors must possess current Vermont commercial pesticide applicator licenses. Award decisions will be based on a technical approach, past experience, and price reasonableness, rather than solely on the lowest price. Following several amendments, the final deadline for quotes was extended to November 2, 2026. Performance will be monitored through 100 percent visual inspections of treatment units conducted by the Contracting Officer's Representative.
Csa East 8 Usda-Fs

POSTED

2 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract titled Site Clearing and Grubbing is a subcontract issued by the Engineering Department of Irvine Ranch Water District in California, with a NAICS code of 115310, indicating it relates to support activities for agriculture. The work involves the complete removal of vegetation, brush, debris, and organic matter from the project site to prepare the ground for upcoming construction activities. This task is essential for ensuring a safe, level, and clear work area prior to any structural development. The solicitation was posted on July 14, 2026, and responses are due by August 12, 2026, at 9:00 PM Pacific Time. The project site location details are not specified, and no set-aside type or organizational eligibility requirements are indicated. The contract can be accessed through the provided vendor portal link for further submission details.

General Info

Site clearing and grubbing subcontract for agriculture support, due August 12, 2026, in California.

Documents

This scope was carved out of 12524.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sand Canyon Dam Liner Repair

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Department of Irvine Ranch Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of vegetation, brush, debris, and organic matter from the project site to prepare for construction.

More opportunities from California → Engineering Department of Irvine Ranch Water District

Same awarding agency

NAICS: 237110
SLED
Wells 6, 12, 14, and 15 Site Improvements
Solicitation # 11570
The Engineering Department of the Irvine Ranch Water District is soliciting bids for solicitation number 11570, titled Wells 6, 12, 14, and 15 Site Improvements. The project scope involves the removal and replacement of electrical and ventilation equipment, flow meter and instrumentation replacement, structural modifications, equipment pad installation, and civil improvements. Specific requirements for Well 15 include pump and motor replacement and an optional downhole well rehabilitation. The contract will be awarded to the lowest responsive and responsible bidder, with a total performance period of 1,000 calendar days from the date of the Notice of Award, including a 20-day allowance for weather. Bidders must submit proposals electronically via PlanetBids by November 18, 2026, and provide a 10 percent bid bond. The successful contractor is required to furnish payment and performance bonds for 100 percent of the contract price and adhere to California prevailing wage rates. Technical requirements include strict adherence to IRWD General Technical Specifications, NETA ATS-2017 for electrical testing, and OSHA and NFPA 70E for arc-flash warning signs. All materials must be delivered in unopened manufacturer containers, and specific labeling standards for potable and recycled water must be followed. Final acceptance is contingent upon the repair of all defects and the submission of certified reports for cathodic protection and electrical acceptance testing performed by an independent NETA member firm.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 21 days
View Details
NAICS: 238220
SLED
Sand Canyon Headquarters and Operations Center HVAC Upgrades (REBID)
Solicitation # 12550 & 12551
The Sand Canyon Headquarters and Operations Center HVAC Upgrades (Project Nos. 12550 and 12551) is a solicitation by the Engineering Department of the Irvine Ranch Water District for comprehensive HVAC system replacements at two California locations. The scope of work includes the removal and replacement of chillers, boilers, piping, associated pumps, and ice bank systems, as well as the retrofit of Variable Air Volume boxes and a full upgrade of the HVAC controls system using CAT6e wiring. Key deliverables include fully operational systems and the completion of start-up and commissioning activities, with specific requirements for independent contractor testing of new boilers and electrical power distribution systems. Bids must be submitted electronically via PlanetBids by October 28, 2026, and require a 10% bid bond. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory requirements for bidders include California CARB In-Use Off-Road Diesel-Fueled Fleet certification, safety program certification, and compliance with California Labor Code prevailing wage rates. The successful contractor must provide performance and payment bonds for 100% of the contract price. Performance is subject to strict limited duration work windows for the T8 Substation and specific seasonal requirements for boiler installation at the Sand Canyon Headquarters between July and October.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

29 days ago

DEADLINE

in about 8 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS