Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on March 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Grading and Earthwork

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Site Grading and Earthwork subcontract, issued by the Department of Transportation's Western Federal Lands Division, focuses on essential infrastructure preparation in Aberdeen. The scope of work encompasses excavation, cut and fill operations, slope stabilization, and the preparation of subgrades specifically for the development of roadways and parking areas at the project site. This opportunity is designated as a Total Small Business Set-Aside under FAR 19.5, falling under NAICS code 237990. The solicitation was posted on March 25, 2025, with a response deadline set for the same day.

General Info

DOT subcontract for site grading, excavation, and earthwork in Aberdeen for small businesses.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Aberdeen, ID, USA

Set-Aside

SBA

Documents

This scope was carved out of 69056724B000017.

The full solicitation package (22 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ID BOR SRAO 0017(1), Sportsman's Park Transportation Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, cut/fill operations, slope stabilization, and subgrade preparation for roadways and parking areas at the project site.

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 237310
New
Federal
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Solicitation # 69056726B000010
Solicitation 69056726B000010 is an Invitation for Bids for the Hurricane Ridge Rockfall Mitigation MP 9.4 project located in Olympic National Park, Clallam County, Washington. This firm fixed-price construction project, managed by the Department of Transportation's Federal Highway Administration Western Federal Lands Division, involves the installation of a rockfall mitigation system approximately 11 miles south of Port Angeles. The scope of work includes the installation of 102 linear feet of Geobrugg RXE-8000 flexible rockfall barrier fence and the treatment of 260 square yards of galvanized steel using Natina Steel weathering agent. Additional requirements include survey and staking, quality control, testing, clearing and grubbing, excavation, and the construction of retaining walls, all adhering to FP-24 standard specifications. The estimated project value ranges between 2 million and 5 million dollars, with a tentative completion date of Fall 2027. This opportunity is a total small business set-aside, and awards will be made to the responsible bidder offering the most advantageous price. Bids must be submitted in sealed envelopes by 1400 local time on November 4, 2026, and must include a valid Standard Form 24 bid bond. Contractors are required to use the Masterworks web-based system for daily reports and measurement notes, and they must comply with specific restrictions prohibiting audio/video recording or AI note-taking during government meetings. The contractor is also responsible for securing all necessary permits for any material sites or sources they identify. Payment will be processed via Electronic Funds Transfer.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Solicitation # 69056726R000020
The project WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3, is a firm-fixed-price task order contract under a Multiple Award Task Order Contract (MATOC) for the Western Federal Lands Highway Division. Located 0.4 miles southwest of Mammoth, Wyoming, the project involves the reconstruction of a 0.7-mile roadway section and associated parking areas within Yellowstone National Park. The scope of work is comprehensive, including 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage and roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, and the installation of concrete curbs, gutters, striping, and signage. The estimated price range for the project is between 45 million and 55 million dollars, with a tentative completion date set for Fall 2028. The solicitation is structured around two primary bid schedules and one option. Schedule A focuses on mainline construction with a 22-foot typical pavement width and the reconstruction of the Norris Geyser Basin parking lot, while Schedule B specifies a 30-foot typical pavement width for the same areas. Option Z covers grading, base, pavement, major drainage, and the construction of a steel boardwalk at the Rustic Falls Boardwalk and the Osprey Pit Road Box Culvert. Only one of the two schedules will be awarded. The project is solicited to approved MATOC contractors, with the formal request for proposal anticipated in Winter 2026/2027. All work must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects for the FP-24 project area.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 237310
Federal
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Solicitation # 69056726R000019
Solicitation 69056726R000019 is a firm fixed-price task order request for proposals issued by the Federal Highway Administration Western Federal Lands Division for the Yellowstone Trail Road, Segment 1 project in Kootenai County, Idaho. Located in the Coeur d'Alene National Forest, the 0.20-mile project involves roadway realignment and reconstruction, the installation of a new single-span precast prestressed concrete structure, and rock-mass stabilization. The estimated price range for the work is between 2 million and 5 million dollars, with a tentative completion date in Fall 2027 and an assumed notice to proceed date of January 12, 2027. This is a restricted MATOC solicitation, meaning proposals will only be accepted from six specific prime contractors: ASCORP Inc (DBA Debco Construction), Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Award will be based on the best value, primarily focusing on the lowest price among responsible offerors. The project must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) and requires strict compliance with various Federal Acquisition Regulation clauses regarding labor standards, equal opportunity, and material workmanship.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads
Solicitation # 69056726B000011
The project AK NPS DENA 10(64) involves the reconstruction and paving of approximately 2.02 miles of roadway within the Riley Creek Campground in Denali National Park, Alaska. The scope of work includes the reconstruction of three campground loops to a width of 12 feet, paving of the frontage road and the USPS and mercantile parking lots, and the installation of a deep patch along the park road at mile post 14.8. Technical requirements encompass asphalt milling, roadway excavation, subgrade stabilization, the installation of Type 1 asphalt concrete pavement, and Method 2 aggregate base. The project also includes striping in accordance with the Manual on Uniform Traffic Control Devices, minor drainage improvements, and the removal and resetting of signs and trash receptacles. This full and open solicitation, numbered 69056726B000011, is managed by the Department of Transportation's Western Federal Lands Highway Division. The estimated price range is between 5 million and 10 million dollars, with a tentative solicitation date in fall 2026 or winter 2027 and a fixed completion date in fall 2027. A critical requirement for this contract is that all material sources must be certified free of noxious weeds and invasive plants by a federal, state, or local public agency, or through the North American Weed Free Forage Program. Prospective bidders are encouraged to conduct site visits during the fall before snow obstructs the area.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS