Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Site Work & Civil Engineering

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 127-24.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CM at Risk Donaldson Career Center Relocation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySouth Carolina → Construction Services
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs full site development for prime contractors on Greenville County School District facility projects. Executes grading, drainage study and installation at the Exchange St and Donaldson Rd intersection, and general site preparation. Ensures compliance with Geotechnical Reports and ADA standards. Delivers finished grade and site infrastructure for 18.23 acres.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
ITB - Paving and Drainage Improvements for Bourgeois Road for Harris County Precinct 1
Solicitation # 26/0338
Harris County is soliciting bids for paving and drainage improvements on Bourgeois Road, from Cutten Road to West Richey Road, in Precinct 1. The project involves reconstructing approximately 5,500 linear feet of asphalt roadway into a 36-foot wide concrete curb and gutter three-lane section with a two-way left turn lane, as well as a boulevard section featuring two 25-foot concrete sections separated by a raised median. Key deliverables include the installation of a drainage system with concrete storm sewer pipes, boxes, and a detention basin, along with traffic signal modifications at Cutten Road and the installation of a new signal at Hollister Road. All work must adhere to the Texas Manual on Uniform Traffic Control Devices and Harris County Pavement Marking Details and Specifications. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation based on price and performance. Bidders must provide a bid guarantee and, upon award, furnish performance, payment, and potentially warranty or maintenance bonds. Compliance with Texas Government Code Section 2258 regarding prevailing wages is mandatory, and all manual laborers must be OSHA 10 certified. Contractors are required to implement a Storm Water Pollution Prevention Plan and follow strict packaging and labeling guidelines for materials, particularly for asbestos-containing waste and large diameter pipes. Bids must be submitted via the Bonfire portal by October 26, 2026, and must include a signed Bid Acknowledgement Form and Form 1295.
Harris County

POSTED

3 days ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

3 days ago

DEADLINE

in 28 days
View Details

More opportunities from South Carolina → Construction Services

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS