Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Siuslaw NF Hebo Annual Road Maintenance

Awarded
12363N26Q4163Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Siuslaw National Forest is seeking a small business contractor to perform annual road maintenance services within the Hebo Ranger District along FSR 1400, encompassing surface maintenance, spot surfacing, paved surface cleaning, ditch and drainage structure maintenance, roadway vegetation cutting, and hazard or obstruction removal. The solicitation is a total small business set-aside under NAICS code 237310, with all offerors required to qualify as small businesses under the $45 million average annual receipts standard. Performance is scheduled to begin on July 15, 2026, and conclude by June 30, 2027, upon issuance of a Notice to Proceed. Work will be performed at designated sites along the specified road, with materials and equipment delivered directly to project locations and temporary storage permitted on federal lands with COR approval. The contract is a firm fixed price task order issued under an IDIQ base contract, with no specified total value due to blank unit pricing in the schedule, though multiple option clauses are included for potential increases in quantity or extension of services. The technical proposal and price proposal must be submitted as separate electronic documents by 11:00 a.m. CDT on June 30, 2026, to Thomas Tran at [email hidden]. Evaluation will be based on a best-value trade-off process, prioritizing acceptable or neutral past performance, a sound technical approach including understanding of site conditions and proposed schedule, demonstrated experience, overall acceptability of the response, and a fair and reasonable price that becomes decisive only if technical proposals are substantially equal. The contractor must comply with prevailing wage requirements under the Davis-Bacon Act, adhere to all safety and environmental regulations including OSHA standards, and maintain documentation of all employees and subcontractors. Quality standards are defined by the Quality Assurance Surveillance Plan (QASP), which sets a 90% acceptable quality level for ditch maintenance and vegetation cutting. The contractor is required to appoint a Contract Manager with 24/7 availability and submit their information within seven days of award. Government property provisions, payment via Electronic Funds Transfer through IPP.gov, security requirements for information systems, and compliance with anti-trafficking and subcontracting rules are all incorporated. Payment is processed through the USDA-FS Stewardship Contracting Branch in Washington, DC, and all invoices must be submitted electronically. No contracting officer’s representative or contracting officer names are provided, though Thomas Tran serves as the designated point of contact

General Info

Annual road maintenance on Forest Service Road 1400, Oregon; small business set-aside.

Contract Value

$512,055.5

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

OR, 97331, USA

Set-Aside

SBA

Award Issued Date

Documents

1

RFQ 12363N26Q4163 Siuslaw NF Hebo Annual Road Maintenance

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Stewardship Contracting Branch Usda-Fs
Contacts1 person available
OfficeWashington, DC, 202501138, USA
Office AddressWashington, DC, 202501138, USA
Contacts

Full Description

Show more

The Siuslaw National Forest requires Surface Maintenance (811-1), Spot Surfacing (813-2), Paved
Surface Cleaning (814-2), Ditch and Drainage Structure Maintenance (834-2), Cutting Roadway
Vegetation (842-1), and Hazard or Obstruction Removal (851-4) within the Hebo Ranger District
along FSR 1400.

More opportunities from Department Of Agriculture → Stewardship Contracting Branch Usda-Fs

Same awarding agency

NAICS: 113310
New
Federal
Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management Unit
Solicitation # 12363N27Q4000
The USDA Forest Service is seeking capability statements from qualified small businesses for the Cowboy Hat Stewardship Integrated Resource Service Contract within the Lake Tahoe Basin Management Unit. The project focuses on hazardous fuel reduction and forest restoration in areas affected by the Caldor Fire, specifically across a 545 acre contract area. The required logging mechanism is Cut-to-Length harvesting, which involves cutting and processing trees at the stump and forwarding material to landings. The scope of work includes cutting and forwarding biomass across 205 acres, mechanical mastication of dead and down material, removing approximately 2,603 tons of biomass and cull logs to off-forest sites, and constructing and decommissioning 1.4 miles of temporary roads. Optional tasks include hand thinning and hand fuel treatment across 177 acres. Performance is anticipated to begin in early summer 2027, with a strict completion deadline of September 15, 2027, due to grant funding expiration. The contract requires adherence to strict environmental and safety standards, including California Public Resources Code fire precautionary measures and specific erosion control protocols such as scarification and tillage. Compliance will be verified by the Forest Service through visual inspections and plot sampling, where a 90 percent acceptance rate per treatment unit is required. Interested vendors must submit capability statements detailing their experience with Cut-to-Length systems and fuel reduction by November 2, 2026, and are invited to a site visit on November 3, 2026.
Logging

POSTED

6 days ago

DEADLINE

in 4 days
View Details
NAICS: 113310
Federal
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon
Solicitation # 12363N26Q4181
Solicitation 12363N26Q4181 is a request for quotations for the Corral G-Z Integrated Resource Stewardship Contract (IRSC) within the Bly Ranger District of the Fremont-Winema National Forest in Oregon. This small business set-aside project follows the G to Z model to restore forest health and mitigate catastrophic wildfire risks by reverting stand density and species composition to historical ranges of variability. The scope of work includes professional forestry services such as harvest layout, timber marking, and cruising, as well as the commercial harvest and removal of approximately 191,379 tons of timber across 7,000 acres and fuels reduction on 17,000 acres. Specific restoration activities include whole tree yarding, removing encroaching conifers in meadows, and performing release cuts in whitebark pine stands. The government will award a firm-fixed price contract based on a best-value tradeoff, evaluating technical approach, relevant past performance from the last three years, and benefits to the local community within 60 miles of Bly, Oregon. The period of performance extends from the date of award through October 31, 2031. Key requirements include compliance with Federal Geographic Data Committee standards for geospatial deliverables, adherence to a strict fire plan, and following specific road maintenance and traffic control specifications. Performance is subject to a quality-based payment scale, where work quality below 85 percent is considered unacceptable and ineligible for payment. Quotes must be submitted as separate technical and price proposals by November 16, 2026.
Logging

POSTED

15 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS