This Solicitation opportunity from City of Greater Sudbury was posted on October 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Greater Sudbury is soliciting quotations for Request for Quotation C01-10 to provide comprehensive snow plowing, sanding, ice control, and snow removal services at various municipal facilities and parking lots. The contract is intended as a multi-year arrangement running from November 1, 2026, to April 30, 2031, covering twelve geographic service areas. These areas include administrative buildings, community centers, libraries, arenas, long-term care facilities, and critical emergency response sites such as the Kukagami EMS heliport. Services include 24/7 availability for plowing, salting, sanding, hand-clearing of walkways, and snow hauling, with specific material requirements such as 5% salt for walkway sand and urea for heliports.
The procurement is restricted to Canadian suppliers under the Putting Canada First policy. Awards will be based on the lowest evaluated contract price per section, subject to a pass/fail reference verification. Bidders must provide unit pricing for equipment such as tandem and triaxle trucks, loaders, and backhoes, as well as materials including salt, sand, and liquid de-icer. Mandatory submission requirements include an equipment inventory, comparable contracts, and a health and safety program declaration. The successful provider must maintain GPS records for primary plow units for three years and submit monthly service reports. All insurance and indemnity clauses are non-negotiable, and compliance with NORCAT and City safety requirements is mandatory.
General Info
Sudbury seeks Canadian suppliers for multi-year snow removal and ice control services 2026-2031.
HighAI Summary for Appendix A10 - Kukagami Site-Specific Requirements: Appendix A10 for the Kukagami Section provides site-specific requirements and information for winter maintenance services at the Kukagami emergency medical services heliport and Kukagami Communications Tower. It includes the purpose and governing relationship to the contract scope of service, the heliport location and operational constraints, cone and snow-clearing requirements, prohibited/allowed deicing materials, contact and escalation procedures, response time for additional service requests, and reference photos/diagram notes. It also lists tower-specific plowing, hand-clearing, and salting/sanding requirements for the communications tower site.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A11 Tom Davies Square Site Requirements: Appendix A11 (site-specific requirements and information) for Tom Davies Square, covering winter maintenance obligations for the site at 200/190 Brady St. and 199 Larch St., Sudbury. It supplements the contract Scope of Service and governs where conflicts exist. The document details required snow clearing, sanding, and salting areas; timing for initial and additional maintenance; equipment and vehicle weight limits; de-icing material restrictions; and protection requirements for interlock pavers and planter boxes.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A12 - Site-Specific Winter Maintenance Requirements: Appendix A12 for the Lionel E. Lalonde Centre and Fire Training Centre sets site-specific winter maintenance requirements for the contract. It covers priority areas, response times, plowing and salting/sanding expectations, sign-in/sign-out and billing record requirements, and coordination with the Facility Manager. It also identifies the site addresses, access points, and a reference diagram, and notes the City’s right to change the basis of payment for the location.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A1 - Azilda and Chelmsford Site Requirements: Appendix A1 for the Azilda and Chelmsford Section outlines site-specific winter maintenance requirements that supplement the contract Scope of Service. It covers multiple municipal facilities, including the Chelmsford Fire and EMS Station, Police Property Compound, Dr. Ed Leclair Community Centre, Chelmsford Community Centre, and Rayside Balfour Communications Tower. The appendix lists priority levels, service addresses, plowing areas, hand-shoveling obligations, salting/sanding requirements, on-site storage notes, access/egress needs, operating-hour constraints, and special cautions for site conditions.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A2 – Levack and Dowling Site-Specific Requirements: Appendix A2 sets site-specific winter maintenance requirements for facilities in the Levack and Dowling Section. It supplements the contract Scope of Service and governs where conflicts exist. The document identifies several locations, including Levack Station, Dowling Station, Onaping Falls Medical Centre, and the IJ Jim Coady Memorial Arena, and specifies plowing, salting/sanding, hand-clearing doors, access requirements, on-site storage, and operating-hour constraints.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A3 - Capreol Section Site-Specific Requirements: Appendix A3 for the Capreol Section sets site-specific winter maintenance requirements for multiple municipal facilities, including emergency services, community centers, and libraries. It supplements the contract Scope of Service and states that its provisions govern where conflicts arise. The document lists each site by address and priority, with detailed plowing, salting/sanding, snow clearing, storage, access, and operating-hour requirements. Page references indicate it is part of a larger contract appendix and appears to be a site-specific attachment to the service scope.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A5 – Skead and Garson Site-Specific Requirements: Appendix A5 for the Skead and Garson Section sets site-specific winter maintenance requirements for municipal facilities, including fire stations, the community centre, and a communications tower. It supplements the contract Scope of Service and states that these site requirements govern where conflicts exist. The appendix provides location addresses and detailed plowing, salting/sanding, hand-clearing, snow storage, access, and entrance maintenance instructions by site and priority level.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A6 - Site-Specific Winter Maintenance Requirements: Appendix A6 for the Wahnapitae and Coniston Section sets site-specific winter maintenance requirements for municipal facilities, including fire stations, an arena, and a communications tower. It supplements the contract Scope of Service and states that its requirements govern where conflicts exist. The appendix lists locations, priority levels, service addresses, and detailed tasks such as plowing, salting/sanding, hand clearing doors, snow storage, and protection of paved areas.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A7 - Site-Specific Winter Maintenance Requirements: Appendix A7 for the Sudbury Central/North Section sets site-specific winter maintenance requirements for municipal facilities. It supplements the contract Scope of Service and controls where conflicts exist. The document lists locations, service addresses, priority levels, and detailed duties such as plowing, salting/sanding, hand shoveling, snow storage, and monitoring timelines for sites including Pioneer Manor, Environmental Services, St. Peter’s United Church, and Flour Mill Museum.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A8 Site-Specific Winter Maintenance Requirements: Appendix A8 provides site-specific winter maintenance requirements for facilities in the Lively, Copper Cliff, and Kivi Park section. It supplements the contract Scope of Service and states that its requirements govern where conflicts exist. The appendix lists locations, priorities, service addresses, and detailed plowing, salting/sanding, hand-clearing, snow storage, and snow removal instructions for Lively Fire Station, Lively Public Library and Citizen Service Centre, Anderson Farm Museum Complex, Kivi Park, and Copper Cliff Museum.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix A9 Site-Specific Winter Maintenance Requirements: Appendix A9 for Whitefish, Walden, Panache, and Worthington lists site-specific winter maintenance requirements for multiple municipal and community facilities. It supplements the contract Scope of Service and states that its requirements govern where conflicts exist. The appendix provides location addresses, priority levels, and detailed service tasks such as plowing, salting/sanding, hand clearing doors and walkways, snow storage, and building access timing for each site.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract C01-10 - Snow Plowing and Removal Services: A draft agreement between the City of Greater Sudbury and a Service Provider for snow plowing and snow removal services for municipal parking lots. The contract term runs from November 1, 2026, to April 30, 2031. It outlines definitions, personnel requirements, equipment standards, and general service obligations.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ C01-10: Snow Plowing and Ice Control Services: Request for Quotation (RFQ C01-10) issued by the City of Greater Sudbury on October 2, 2026, for snow plowing, sanding, ice control, and snow removal services at various municipal facilities and parking lots. The document outlines submission requirements, evaluation processes, and a 'Putting Canada First' procurement policy restricting bids to Canadian suppliers. Closing date is October 23, 2026.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ C01-10: Snow Plowing and Ice Control Services: Issued October 2, 2026, by the City of Greater Sudbury, this Request for Quotation (RFQ C01-10) seeks providers for snow plowing, sanding, ice control, and snow removal services at various municipal facilities and parking lots. The solicitation includes a Statement of Requirements, submission instructions via bids&tenders, and is subject to the 'Putting Canada First' procurement policy, restricting eligibility to Canadian Suppliers. Closing date is October 16, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFQ C01-10 Snow Plowing and Ice Control Services - Addendum No. 1: Issued October 9, 2026, this addendum modifies RFQ C01-10 for Snow Plowing and Ice Control Services. Key changes include updated closing dates, revised price evaluation weightings for specific sections (Kukagami, Heliport, Communication Tower), updated bidder eligibility regarding the Winter Operations Plan, and the replacement of the draft contract and solicitation PDFs. It also includes a Q&A section clarifying site map details and berm locations.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Scope of Service - Contract C01-10 Snow Plowing and Ice Control: Scope of Service for Contract C01-10 covering snow plowing and ice control services for the City of Greater Sudbury. Dated by contract reference C01-10, it describes winter maintenance responsibilities, service locations across multiple appendices, 24/7 availability, access and security requirements, and general service obligations including plowing, sanding, salting, snow hauling, reporting, and emergency response.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Valley East Section Site-Specific Requirements: Appendix A4 for the Valley East Section, a site-specific requirements document for winter maintenance services. It supplements the contract Scope of Service and governs listed locations where conflicts arise. The appendix identifies multiple facilities and provides detailed plowing, salting/sanding, hand-clearing, storage, operating-hours, and access/entrance requirements by site, including priority levels and service addresses where available.
PDF
PDF, Low prioritycontract-draft
LowAI Summary for Contract Draft Placeholder: Draft contract placeholder for solicitation C01-10. The document is intentionally blank and states that the applicable contract is still being finalized and will be issued by addendum. Bidders are instructed to review the final contract once issued and consider its terms and conditions when preparing bids.
RFQ C01-10 Snow Plowing and Ice Control Services at Various Municipal Facilities and Parking Lots.Refer to the Bid Solicitation Document for all details, timelines and/or conditions, if applicable, regarding this procurement.Refer to Bid Solicitation Document for the Official Point of Contact. All communications shall be done through the "Submit a Question" feature on greatersudbury.bidsandtenders.ca. Verbal communications will not be binding on the City. Bidders shall review the Bid Solicitation and shall promptly report and request clarification of any discrepancy, deficiency, ambiguity, error, inconsistency or omission contained therein through greatersudbury.bidsandtenders.ca.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.