Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solar Interconnection Grant Opportunity

Closed
RFA-127541State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

21 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Solar Interconnection Grant Program, administered by the Virginia Department of Energy under Senate Bill 659 and House Bill 683, provides funding to Virginia public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. With approximately 2 million dollars in total available funding, individual awards are capped at the lesser of 600,000 dollars or 25 percent of the total project cost. Eligible expenses include utility-required infrastructure such as transformers, relays, protection equipment, SCADA/telemetry, metering modifications, and necessary engineering studies. The anticipated period of performance for these projects ranges from 6 to 18 months and must take place at previously developed project sites. Applications must be submitted via the Virginia Energy Grant Portal by October 2, 2026, and are evaluated on a competitive 100-point scale based on merit and overall benefit to the Commonwealth. Required submission materials include a master application document with strict word counts, a budget justification worksheet, an OMB Financial Capabilities Questionnaire, and an Interconnection Study Details form. Awardees must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Contract administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and potential retainage of up to 5 percent for construction projects, with final payments subject to internal auditing.

General Info

Virginia grants up to $600,000 for public solar grid interconnection costs by October 2026.

Place of Performance

understanding the nature and extent of interconnection challenges facing public-sector projects, VA, USA

Set-Aside

NONE

Documents

1

Solar Interconnection Grant Program Guidelines

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia Department of Energy
Contacts1 person available
OfficeN/A
Organization / AgencyVirginia Department of Energy
Office AddressN/A
Contacts

Full Description

Show more
The Virginia General Assembly established the Solar Interconnection Grant Program through Senate Bill 659 and House Bill 683 (2026) to address one of the barriers facing public-sector solar development: the cost of interconnecting distributed solar energy systems to the electric grid. While the cost of solar equipment has declined substantially over the past decade, interconnection costs, including utility-required system upgrades, protection equipment, engineering studies, and other infrastructure improvements, have become an increasingly important factor affecting project feasibility.

More opportunities from Virginia Department of Energy

Same awarding agency

NAICS: 237990
SLED
Pen Hollow Landslide
Solicitation # 27AML05
Solicitation 27AML05, issued by the Virginia Department of Energy, seeks a contractor for the Pen Hollow Landslide Project located in Wise County, Virginia. The scope of work includes landslide stabilization, construction of drainage controls, relocation of a water line in accordance with Wise County PSA specifications, road upgrades for off-road trucks, and site revegetation. The contract will be awarded to the lowest responsive and responsible bidder, with award priority given to DSBSD-certified micro or small businesses. Bidders must submit their proposals electronically via eVA by October 30, 2026, and must include a Small Business Subcontracting Plan and a signed Abandoned Mine Lands Contractor Information Form to be considered responsive. The project requires the contractor to commence work within five calendar days of the Notice to Proceed, with a total performance period of 240 calendar days. Key compliance requirements include adherence to the Davis-Bacon Act, the Build America Buy America Act, and various occupational safety and health regulations. The contract mandates the provision of standard performance and labor and material payment bonds. Financial penalties for delays are set at $1,902.82 in liquidated damages per calendar day. Invoicing must be based on documented actual costs and actual units used, as the agency reserves the right to verify all quantities prior to payment. Materials must be delivered in original manufacturer packaging with legible identification, and any non-complying or damaged materials must be replaced at no cost to the owner.
Other Heavy and Civil Engineering Construction

POSTED

18 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS