Solar PV Array Installation (Mechanical & Structural)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the mechanical and structural installation of a 4.55 MWdc ground-mounted photovoltaic system for the California State University, Bakersfield. The scope of work includes driving approximately 1,275 piles to depths of 6 feet, installing tracker mounts and south-facing fixed tilt systems, and mounting 6,500 solar panels featuring antireflective coating. The contractor is responsible for providing the necessary pile driver and racking systems to deliver a fully installed and mechanically secured solar array. The project is located in Bakersfield, California, under NAICS code 238990. It is designed to support prime contractors working on projects for the California State University Board of Trustees, with a posted date of June 15, 2026.

General Info

Mechanical and structural installation of 4.55 MWdc solar array at CSU Bakersfield.

Agency

California State University, Bakersfield

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Bakersfield, CA, 93311

Set-Aside

NONE

Documents

This scope was carved out of Ground Mount Solar and Battery Project.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State University, Bakersfield
ContactsNo contacts available
OfficeN/A
Organization / Agency
California State University, Bakersfield
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a 4.55 MWdc ground-mounted photovoltaic system for prime contractors on California State University Board of Trustees projects. Drives approximately 1,275 piles to depths of 6 feet, installs tracker mount and south-facing fixed tilt systems, and mounts 6,500 solar panels with antireflective coating. Requires pile driver and racking systems. Delivers a fully installed and mechanically secured solar array.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Shell Point Tennis/Pickleball Court Resurfacing
Solicitation # 102026
Beaufort County Procurement Services has issued Invitation for Bid IFB 102026 for the inspection, repair, and resurfacing of the tennis and pickleball courts at Shell Point Park in Beaufort, South Carolina. The project is necessitated by safety concerns and structural damage caused by root intrusion. The scope of work includes site preparation, demolition, and the application of a multi-layer sports surfacing system with a specific color scheme of blue in-bounds, light blue non-volley, and green out-of-bounds areas. Additionally, the contractor must install new pickleball net posts, center anchors, and nets for two courts, ensuring all work meets USAPA standard specifications for texture, slip resistance, and dimensional requirements. Bids must be submitted electronically by 2:00 pm on October 20, 2026. The award will be based on a formal sealed bid process, typically favoring the lowest responsive and responsible bidder. Requirements for submission include a bid bond for at least five percent of the total bid, and the awarded contractor must provide performance and payment bonds equal to one hundred percent of the contract amount. The project must be completed within 180 calendar days from the Notice to Proceed. Contractors are required to comply with Title VI of the Civil Rights Act and must provide a Proposed Utilization Plan for Small and Minority Business Enterprise participation unless they are self-performing one hundred percent of the work. Payment is structured monthly at ninety percent of the cost of work in place, subject to approval by the County Representative.
Capital Projects/Facilities

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS