Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solicitation for B1502 Renovation

Closed
W50S6N26QA022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

Solicitation W50S6N26QA022 is a Firm Fixed Price project for the renovation of Building 1502 at the 187th Fighter Wing in Montgomery, Alabama. The scope of work includes a base bid for remodeling 10 bathrooms, replacing 4 water fountains, and renovating a communications closet. Additionally, the government has included three options for replacing carpet tiles on the first and second floors and renovating conference room lighting. The project requires the contractor to provide all necessary personnel, equipment, and materials, with a mandatory performance period of 150 calendar days following the notice to proceed. This effort is a total small business set-aside. Award decisions will be based on the most advantageous offer, evaluating both price and non-price factors, specifically technical capability and past performance. The contractor must adhere to ADA clearance guidelines and specific brand-name or equal requirements for items such as Elkay bottle filling stations, Sturdibuilt sinks, and Shaw carpet tiles. All quotes must be submitted by September 18, 2026, and must acknowledge all amendments. Note that funds are not presently available, and no award will be made until such funding is secured.

General Info

Small business FFP project renovating Building 1502 in Alabama by September 18, 2026.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

AL, 36108, USA

Set-Aside

SBA

Documents

19

B1502 Renovation SOW - Alabama Air National Guard

DOCX, High priority: read this first2 pages · sow
High

Bldg 1502 Finish Upgrades - Specifications and Drawings

PDF, High priority: read this first14 pages · specifications
High

Brand Name or Equal Sinks Justification - 187th Fighter Wing

PDF, High priority: read this firstjustification-and-authorization
High

Building 1502 Finish Upgrades - Floor Plans A02.01

PDF, High priority: read this firstspecifications
High

Justification for Other Than Full and Open Competition - Bradley Shower

PDF, High priority: read this firstjustification-and-authorization
High

Justification for Other Than Full and Open Competition – Texspar Plus

PDF, High priority: read this firstjustification-and-authorization
High

W50S6N26Q0220001 - B1502 Renovation

PDF, High priority: read this firstifb
High

W50S6N26Q02 B1502 Renovation IFB

PDF, High priority: read this firstifb
High

W50S6N26Q2A022 B1502 Renovation Project IFB

PDF, High priority: read this firstifb
High

W50S6N26QA0220001 - B1502 Renovation

PDF, High priority: read this firstifb
High

W50S6N26QA0220002 - B1502 Renovation

PDF, High priority: read this first78 pages · rfp
High

W50S6N26QA022 Amendment 0001

PDF, High priority: read this first10 pages · amendment
High

W50S6N26QA022 Amendment 0002

PDF, High priority: read this first10 pages · amendment
High

W50S6N26QA022 - Solicitation, Offer, and Award for B1502 Renovation

PDF, High priority: read this firstifb
High

Bldg 1502 Site Visit Attendance Roster

PDF, Low priorityother
Low

Justification for Other Than Full and Open Competition – Elkay Bottle Filling Station

PDF, Low priorityjustification-and-authorization
Low

Justification for Other Than Full and Open Competition – Shaw Carpet Tile

PDF, Low priorityjustification-and-authorization
Low

Justification for Other Than Full and Open Competition – Sherwin Williams Paint

PDF, Low priorityjustification-and-authorization
Low

W50S6N26QA022 Questions and Answers

DOCX, Low priority12 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 15, 2026 to Sep 18, 2026. The notice description changed.

Notice updated

Response deadline changed from Sep 18, 2026 to Sep 15, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MT Uspfo Activity Alang 187
Contacts2 people available
OfficeMONTGOMERY, AL, 36108-4824, USA
Office AddressMONTGOMERY, AL, 36108-4824, USA

Full Description

Show more

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items needed to renovate building 1502 as defined below and in accordance with attached drawings (26017_Bldg 1502 Finish Upgrades_ARCH):



  1. Base Bid: Remodeling of 10 bathrooms, replacement of 4 water fountains, and communications closet renovation
  2. Option 1: Replace carpet tile on second floor.
  3. Option 2: Replace carpet tile on first floor.
  4. Option 3: Conference Room lighting renovation.

Please note the latest uploaded solicitation. Site visit has been changed to 8 September at 0900 and Section 00 10 00 has changed to now say that, "electronic submissions will be accepted."


RFIs are due NLT 10 September 2026.


The Questions and Answers document has been posted. If you do not feel your question was answered adequately, please reach out to the contracting office. The site survey roster and any amendments mentioned in the questions and answers will be posted on 11 September 2026.


Amendment 01 has been posted identifying the updated requirements in Section 00 10 00 Note 5. All vendors must acknowledge Amenment 01 in your quotes. 


Site Visit Roster has been posted. 


Amendment 02 has been posted updating the drawings and extending the due date for quotes to 18 September 2026 at 11:00 AM. All vendors must acknowledge Amendment 02 in your quotes. 


Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

More opportunities from Department Of Defense → W7MT Uspfo Activity Alang 187

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS