Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Prequalification of Sources - Sollars ES HVAC Upgrades, Misawa Air Base, Japan

Closed
W912HV26BA018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitory rooms, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and electrical and plumbing repairs to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave provisions. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed. The project includes a one-year guarantee of workmanship and a specific 20-year product warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, common areas, and mechanical rooms. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area, as well as the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including certified Veteran, Service-Disabled Veteran, Women-Owned, and HUBZone small businesses. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with general liability and worker's compensation insurance, within ten days of award. Key deliverables include a project schedule, safety plan, and a minimum one-year workmanship warranty upon final acceptance. Construction is scheduled to take place between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The project spans 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The comprehensive scope of work requires pricing for a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site preparation is extensive, involving clearing, rock excavation, grading, and mitigation for impacts on existing wetlands. Infrastructure improvements consist of new access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB certifications.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Japan District, is conducting a prequalification process for the Sollars Elementary School HVAC Upgrades at Misawa Air Base, Japan, with a solicitation number W912HV26BA018, anticipated for release in July 2026. This effort is strictly limited to local Japanese contractors who possess either a Japanese civil construction (doboku isshiki koji) or architectural construction (kenchiku isshiki koji) license, verified through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website. The project involves comprehensive upgrades to heating and cooling systems across five buildings—80, 90, 92, 94, and 98—including removal and replacement of HVAC equipment, supporting building systems such as ceilings, lighting, power, and fire protection, structural modifications including roof upgrades and beam/column reinforcement at Building 94, construction of a new central plant enclosure and mechanical rooms at Buildings 90 and 98, and extensive site work encompassing trenching, repaving, resodding, transformer replacement, and removal of existing structures. The estimated contract value ranges between yen 2.5 billion and yen 10 billion. Contractors must submit their prequalification packages electronically in PDF format, not exceeding fifty pages, by 1400 hours Japan Standard Time on June 2, 2026, to specified USACE email addresses, with the submission deadline extended to June 16, 2026, for RFI submissions related to prequalification criteria. Prequalification evaluation consists of three mandatory, pass-fail factors: Factor 1 requires proof of a valid Japanese construction license, with a “GO” rating being essential to proceed; Factor 2 evaluates construction experience through at least one qualifying project completed or currently ongoing in Japan since 2016, with a minimum contract value of yen 500 million, where the contractor served as prime and the work included HVAC components such as chilled water plants, DOAS systems, or district heating/cooling with mechanical and structural support; Factor 3 assesses proven competence via documented past performance on at least one such qualifying project, relying on submitted Past Performance Questionnaires, CPARs, or other verifiable ratings covering quality and schedule performance. Contractors may include projects performed by parent, subsidiary, or affiliate firms if they can demonstrate significant involvement in the subject contract, and joint ventures may use past project experience of member

General Info

U.S. Army Corps seeks local Japanese contractors for HVAC upgrade at Misawa Air Base by July 2026.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

AP, JPN

Set-Aside

NONE

Documents

3

Construction Experience Information Sheet - Solicitation W912HVXXXXXXX

DOCX, High priority: read this firstsow
High

Solicitation W912HVXXXXXXX Construction Experience Information Sheet

DOCX, High priority: read this firstsow
High

USACE Past Performance Questionnaire (Form PPQ-0) Attachment II

DOCX, High priority: read this firstpast-performance
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice type changed from Presolicitation to Special Notice. Response deadline changed from Jul 25, 2026 to Jun 16, 2026. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Japan
Contacts2 people available
OfficeAPO, AP, 96338-5010, USA
Office AddressAPO, AP, 96338-5010, USA

Full Description

Show more

The following companies have met the requirements of the prequalification of sources and have been determined prequalified for the solicitation:


American Engineering Corporation (UEI: M336EV5K3YZ3)


Kashiwabara Corporation (UEI: HFA1Z6EBAMK9)


*5/28/2026 Update: RFI response posted. The prequalification criteria has been revised.  Attachment I - Construction Info Sheet has been revised.


The Government received the following RFI during the Prequalification of Sources RFI period:


1. PREQUALIFICATION EVALUATION CRITERIA: b. Factor 2 - Construction Experience(2) Project was completed no longer than ten (10) years.


Regarding the requirement mentioned above, would the Government consider including ongoing DoD projects that have reached a stage of substantial completion or have at least one year of proven performance history? We respectfully request that the Government accept "completed or currently performing DoD projects," provided they meet the relevancy and scale requirements.


Government Response: The Government has revised the prequalification criteria for Factor 2 Construction Experience. Attachment I - Construction Info Sheet has also been revised.



*5/27/2026 Update: The prequalification submission deadline has been extended to 16 June 2026.*



PREQUALIFICATION NOTICE AND REQUIREMENTS


1.    PROJECT INFORMATION: 


Project Title: Sollars Elementary School (ES), Heating, Ventilation, Air Conditioning (HVAC) Upgrades


Project Location: Misawa Air Base, Japan


Project PSC: Z2JZ – Repair or Alteration of Miscellaneous Buildings


Project NAICS: 236220 – Commercial and Institutional Building Construction


Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000 (Japanese YEN)


Project Description: Upgrade the existing heating system and add full building cooling capabilities to include 5 bldgs. 80, 90, 92, 94 & 98. Scope is to include transformer upgrades and structural roof changes. Scope of work includes, but is not limited to, removal and replacement of HVAC systems, removal and replacement of building systems to support the HVAC renovations, including ceilings, partitions, lighting, power, and fire protection systems, roof upgrades at b94, reinforcement of structural beams and columns at b94, construction of a new central plant enclosure, construction of new mechanical rooms at b90 and b98, and associated site work to support the renovations, including Trenching and repaving/resodding, removal and replacement of Transformers, and removal of site structures.


2.    GENERAL INFORMATION 


a.    This is a Prequalification of Sources in accordance with the procedures authorized by Class Deviation 2026-O0019 DFARS 236.101-70 Prequalification of sources.  The U.S. Army Corps of Engineers (USACE), Japan District is seeking to prequalify sources for the upcoming Solicitation W912HV26BA018 for Sollars ES HVAC Upgrades, Misawa AB, Japan.


b.    No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. 


c.    Only those contractors that meet the prequalification criteria will be considered for the subsequent solicitation where the Government intends to issue an invitation for bid (IFB) utilizing FAR Part 14 Sealed Bidding procedures. To be eligible to participate, interested contractors must receive a “GO” for Factor 1 and be rated “ACCEPTABLE” for Factor 2 and 3 to participate in the IFB.


d.    Respondents will be notified of the results of the prequalification process before the solicitation is released.  


e.    The solicitation is anticipated to be released in July 2026. 


f.    Interested contractors are requested to submit a response to this Prequalification of Sources Notice.  


g.    A site visit will not be held during the prequalification process.  


3.    REQUEST FOR INFORMATION 


a.    Prospective Bidders will submit questions or requests for information (RFI) regarding this solicitation through the Microsoft Forms website. This form will allow prospective Bidders to submit questions and/or RFIs. This is an anonymous form; no log in, registration, or account is required.


URL: https://forms.osi.apps.mil/r/Yqd7FbH9Ey



Rules



1.    Prospective Bidders shall submit all questions or requests for information (RFI) regarding this Prequalification through the provided Microsoft Forms website. Telephonic and email questions sent directly to Government representatives will not be accepted.


2.    All questions or RFIs must be submitted using the Microsoft Forms link no later than 11: 59 PM (midnight), Japan Standard Time on 13 May 2026. The form will stop accepting inquires at the specified time.



3.    Only one inquiry may be submitted on each form.
b.    Instructions:
1.    For each inquiry, go to the URL listed above.
2.    Answer all questions including the Company name and email address.
3.    Click "Submit" and then click "Submit another response"
4.    Answer all questions including the Company name and email address.
5.    Repeat steps 3 and 4 as many times as necessary.
6.    Notify the Contract Specialist, Mr. Ruben Romero at contact@example.gov and the Contracting Officer, Mr. Ryan Marzetta at contact@example.gov after submitting inquiries to confirm the correct number of inquiries have been received.



c.    Information and Support
1.    Prospective bidders should notify the Contract Specialist, Mr. Ruben Romero at Ruben.A. contact@example.gov and the Contracting Officer, Mr. Ryan Marzetta at Ryan.J. contact@example.gov if there are technical issues submitted inquiries.
2.    Prospective bidders will not be able to view previously submitted questions and/or RFI posted by themselves or other prospective Bidders.
3.    The Government will respond to inquiries through a posting on the SAM.GOV prequalification notice. 
4.    The Government reserves the right to answer questions after the deadline specified above but is not obligated to provide a response to late questions.


4.    PREQUALIFICATION SUBMISSION REQUIREMENTS – GENERAL INFORMATION


a.    Prequalification package submittal shall be clear, concise and include sufficient detail to substantiate the validity of stated claims to allow for effective evaluation.  Your submission shall not simply rephrase or restate the Government’s requirements but rather provide convincing rationale to address how you meet the prequalification requirements.  Contractors should assume that the Government has no prior knowledge of their facilities or experience and will base its evaluation on the information presented in your submission.


a.    Electronic submission: Prequalification package shall be submitted electronically via email to contact@example.gov and contact@example.gov.  A confirmation email will be sent once the prequalification package has been received.  If your company does not receive email confirmation, please contact the Contract Specialist, Ruben Romero, and the Contracting Officer, Ryan Marzetta.  


b.    Submission must be received by 2 June 2026, 1400hrs Japan Standard Time. The Government will only accept electronic prequalification proposals via email.


c.    For the purposes of determining whether the submission was received “late” in accordance with RFO 14.301, the date and time the file(s) are confirmed received by the Government via email will be considered the date and time submitted.


d.    Submission shall be prepared and submitted electronically in Portable Document Format (PDF). Other formats or file types will not be accepted. It is recommended that the pages be formatted to standard letter size 8- 1/2” x 11” or A4 using 12 characters per linear inch or equivalent as the minimum size standard for text.  


e.    The total pages submitted shall not exceed 50 (fifty) pages. Each page should be numbered. Any pages over the prescribed limit will not be considered for evaluation.


5.    PREQUALIFICATION SUBMISSION REQUIREMENTS - CONTENT


a.    The first page (cover page) of your prequalification package shall show the following information: 


o    Solicitation Number
o    Company Name and Address
o    Point of Contact (POC) Name, Title, and Email Address
o    Name, title, telephone and email address of individuals authorized to bind/sign for the company in connection with this acquisition.  Evidence of the person’s authority should accompany your submission. 


    
b.    Factor 1 - Eligibility 


Contractor shall submit a copy of their Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license with ENGLISH Translation.   


c.    Factor 2 - Construction Experience


The Construction Experience Information Sheet (Attachment I) included in this announcement is provided for the contractor to submit their construction experience for Prequalification Criteria Factor 2 Construction Experience.


Use Attachment I – Construction Experience Sheet to submit a minimum of one (1) but not more than three (3) construction projects.  Each submitted project information sheet shall not exceed five (5) pages per project except JV agreements do not count towards the information sheet page limitation.  


Contractor should ensure all prequalification criteria for the factor are addressed. The Government will not evaluate more than three (3) projects.  If more than three (3) projects are submitted for this criteria, the Government will only evaluate the first three (3) projects submitted in the order presented by the contractor.  


d.    Factor 3 - Proven Competence


Past Performance Questionnaires (PPQ) – Attachment II, included in this announcement, is provided for the contractor to submit past performance information for each project submitted for Prequalification Factor 2, Construction Experience on the Construction Experience Sheet – Attachment I.


The responsibility to send out the past performance questionnaire rests solely with the contractor. Contractors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact via email at <Contract Specialist Email> and <Contracting Officer Email> by the due date and time.


Contract Performance Assessment Report (CPAR) generated from CPARS.GOV (previously known as Past Performance Information Retrieval System (PPIRS)) and other official contract performance assessment records in lieu of the PPQ, Attachment II for any project may be submitted.  


NOTICE: If contractor submits a record other than PPQ or CPARS, contractor shall ensure rating definitions are provided.  


The Government reserves the right to obtain or verify a contractor’s past performance information using CAGE/DUNS/SAM UEI numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary affiliate firm) identified in the bidder’s prequalification submission, from other sources, including, but not limited to Past Performance Information Retrieval System (PPIRS), Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), and Electronic Subcontracting Reporting System (eSRS) Evaluators in determining the offeror’s past performance confidence rating. Government evaluators may contact your points of contact/references for the projects submitted to verify past performance on these projects. The Government may consider relevant past performance data obtained from any source in determining the performance rating.


6.    PREQUALIFICATION EVALUATION CRITERIA: 


a.    Factor 1 - Eligibility 


This contract will be performed in its entirety in the country of Japan and is intended only for local sources. Only local sources will be considered for this prequalification process and subsequent solicitation.


Contractors must possess a Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license by the prequalification due date and time.


The U.S. Government will verify the contractor’s submitted license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN. It is the responsibility of the contractor to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website. 


RATING: 


GO – Contractor submitted proof of license, and their license was verified through the MLIT website.  


NO GO – Contractor does not have Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license.


NOTICE – If contractor receives a “NO GO” for this factor, no further evaluation will be conducted for remaining factors 2 and 3.  


b.    Factor 2 - Construction Experience


The Government will evaluate the construction experience demonstrated by the interested contractor. The requirements for this prequalification criteria will be met if the Contractor demonstrates experience on a minimum of one (1) project that individually meets all of the below criteria: 


(1)    Contractor was the Prime Contractor of the project at time of completion or is the Prime Contractor of the project that is ongoing; 
(See notes below regarding Prime Contractor Experience) 


(2) Regarding project completion, one of the following apply:


(a) Project was completed no longer than ten (10) years preceding the date of this request for prequalification of sources notice issuance date (project completion date shall be no older than 10 years preceding this request for prequalification of sources notice issuance date) or; 


(b) The project is currently ongoing and the project is at least 50% physically complete relative to the total physical scope of work; 


(3) Project performance location is in Japan; 


(4) At time of project completion or contract award, the project had a total contract value greater than or equal to ¥500,000,000 (or $5,000,000 U.S. dollars equivalent); and 


(5) Project was for new construction, renovation, or repair work that included heating, ventilation, and air conditioning (HVAC) work. HVAC work includes but is not limited to: installation, renovation, or replacement of Dedicated Outside Air System (DOAS) with chilled water or DX refrigeration cooling coil; Chilled water plant for Air Handling cooling coils, or District cooling/heating system with at least one chiller/heating plant serving multiple buildings and associated mechanical, electrical, and structural modifications required to support the HVAC system work.  



A single project must meet all criteria (1) through (5).   


NOTE: A maximum of 3 projects will be evaluated. If more than 3 projects are submitted, only the first 3 projects will be evaluated in the order submitted.


RATING: 


ACCEPTABLE - The contractor provided a minimum of one project that meets all criteria (1) through (5) which demonstrates sufficient construction experience in accordance with the prequalification criteria for Factor 2 – Construction Experience.  


UNACCEPTABLE - The contractor did not provide a minimum of one project that meets all criteria (1) through (5) to demonstrate sufficient construction experience in accordance with the prequalification criteria for Factor 2 – Construction Experience.  


NOTES REGARDING PRIME CONTRACTOR EXPERIENCE
•    Any reference to “offeror” shall be construed to mean “company”. 



Note (1):


The Government will also consider prime contractor experience of the offeror's parent/subsidiary/affiliate firm as experience attributable to the offeror for evaluation purposes if the offeror can establish that the parent/subsidiary/affiliate firm will have a significant involvement in performance of this contract and describe the resources of the parent/subsidiary/affiliate firm that will be utilized on project that is the subject of this procurement.


If submitting a parent/subsidiary/affiliate firm’s project for experience, it is the offeror's responsibility to effectively demonstrate and describe how the parent/subsidiary/affiliate firm's resources (such as workforce, management, facilities, or other resources) will significantly contribute to the execution of the project which is the subject of this procurement; failure to effectively demonstrate and describe the planned contribution of the parent/subsidiary/affiliate firm’s involvement in the subject project of this procurement will cause the past experience of the parent/subsidiary/affiliate firms to be considered not relevant for evaluation purposes in this procurement. Further, any project in which the parent/subsidiary/affiliate firm performed the role of a subcontractor will not be considered relevant when evaluating the experience of the offeror.



Note (2):


A Single Award Task Order Contract (SATOC) or Multiple Award Task Order Contract (MATOC) alone is not considered a relevant construction project, but an individual task order project against its SATOC or MATOC may be submitted if it meets the minimum requirements for a project set forth above.


Note (3):
If the offeror submitting this prequalification package is a JV, a project completed by a JV may be submitted for purposes of demonstrating prime contractor experience, so long as at least one member of the offeror JV was a member of the JV on the completed project. Offeror must demonstrate evidence that at least one member of the offeror JV was a member of the JV on the completed project, such as a signed joint venture agreement or similar documentation.


Example: Offeror for this prequalification/solicitation is Joint Venture A-B. JV A-B is comprised of Company A and Company B. Past projects completed by JV A-C, comprised of Company A and Company C may be used to demonstrate prime contractor experience for this solicitation, as Company A, a member of the offeror JV, was a member of JV A-C.
Projects completed by a joint venture where the offeror was a member of the JV may be submitted for the purpose of demonstrating prime contractor experience. Offeror must demonstrate evidence of JV membership on the completed project, such as a signed joint venture agreement or similar documentation.


Example: Offeror for this prequalification/solicitation is Company A. Past projects completed by JV A-C, comprised of Company A and Company C may be used to demonstrate prime contractor experience for this prequalification/solicitation, as Company A, the offeror, was a member of JV A-C.


Projects completed by a member of a joint venture for this prequalification/solicitation (as demonstrated by a signed joint venture agreement for this effort) may be submitted for the purpose of demonstrating prime contractor experience.


Example: Offeror for this prequalification/solicitation is JV A-B. Past projects completed by Company A may be used to demonstrate prime contractor experience for this prequalification/solicitation, as Company A is a member of the offeror JV A-B.


c.    Factor 3 - Proven Competence  


Proven competence will be determined through past performance evaluation.  


Past performance will first be evaluated to determine whether the contractor’s past performance is recent and relevant, or not relevant, to the effort to be acquired. Only recent and relevant projects will be considered for this factor.  Performance on a project is deemed recent and relevant if the project individually meets all the criteria (1) through (5) under prequalification factor 2.


Second, the past performance evaluation will determine how well the interested bidder performed on recent and relevant projects under QUALITY and SCHEDULE. 



RATING: 


ACCEPTABLE — The contractor demonstrates overall satisfactory or better past performance on at least one recent and relevant project, as evidenced by Past Performance Questionnaires (PPQs), Contractor Performance Assessment Reports (CPARs), or other verified performance data in Quality and Schedule categories. 


"Satisfactory" is defined as: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. 


UNACCEPTABLE - The contractor’s past performance on recent and relevant projects reflects marginal or unsatisfactory performance, in Quality and Schedule categories.  


“Marginal” is defined as: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented. 


“Unsatisfactory” is defined as: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective. 


A contractor that submits no past performance information, or whose submitted past performance information cannot be verified, will be rated UNACCEPTABLE for Factor 3, as the Government cannot determine whether the contractor has demonstrated the proven competence required by this prequalification.


PREQUALIFICATION EVALUATION PROCESS


a.    The Government will review the contractor’s prequalification package for acceptability based on the following evaluation criteria.  


b.    Criteria 1 is a GO/NO GO criteria. If a company receives a NO GO on criteria 1, the company will not be further evaluated on Criteria 2 and 3.  Prequalification factors 2 and 3 will be reviewed and rated as “ACCEPTABLE” or “UNACCEPTABLE”. 


c.    Contractors must receive “GO” for Factor 1 and be rated “ACCEPTABLE” for Factors 2 and 3 to be considered for the subsequent solicitation where the Government intends to issue an invitation for bid (IFB) utilizing FAR Part 14 Sealed Bidding procedures.


d.    During Prequalification, the Government will review the contractor’s submission to identify any deficiencies that would result in an “UNACCEPTABLE” rating, and therefore, render an interested contractor ineligible for receipt of the Invitation for Bids. The Government will not assess strengths in the prequalification process. 


e.    All respondents to the prequalification notice will be informed in writing whether they are selected to participate in the acquisition. The determination will be based on the information submitted in response to this notice.  Contractors that do not meet prequalification requirements will receive a brief explanation for the basis of the evaluation and will be ineligible to participate further in the acquisition process.


f.    Following the selection of the prequalified sources, the Government will proceed with the solicitation phase of the acquisition and issue an IFB utilizing FAR Part 14 Sealed Bidding procedures to the prequalified sources.  Award shall be made to the responsible bidder whose bid, conforming to the invitation, will be most advantageous to the Government, considering only price and price-related factors.

More opportunities from Department Of Defense → W2SN Endist Japan

Same awarding agency

NAICS: 811310
New
Federal
Combined Synopsis/Solicitation Notice: Maintenance of Commissary Refrigeration Systems and Repair of Refrigeration, Heating, Ventilation, and Air Conditioning Systems (HVAC) at Hario and Sasebo, Japan
Solicitation # W912HV26QA013
Solicitation W912HV26QA013 is a combined synopsis and request for quote for the maintenance and repair of commissary refrigeration systems, including Refrigeration Monitoring and Control Systems (RMCS), and heating, ventilation, and air conditioning (HVAC) systems at Hario and Sasebo, Japan. The scope of work encompasses monthly preventive maintenance and 24/7 emergency services, requiring a two-hour response time and repair completion within 24 hours. The contract consists of a base year from December 1, 2026, through November 30, 2027, with four additional option years. Performance locations include the Hario Commissary (Building 5127), Sasebo Commissary (Building 1436), and Sasebo Storage Facility (Building 306). The government will award a firm-fixed-price purchase order based on the most advantageous offer, evaluating past performance as a pass/fail gatekeeper, followed by technical capability and price, with technical capability weighted more heavily than price. Quotes must be submitted in Japanese Yen via the PIEE Solicitation Module by October 28, 2026. Recent amendments have updated the content of quotations, evaluation factors, and line-item quantities, while adding formal responses to industry requests for information. Contractors must demonstrate specific workforce certifications, emergency response capabilities, and compliance with OSHA and Corps of Engineers safety standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in about 1 hour
View Details
NAICS: 236220
Federal
FY2027 Projections
Solicitation # W912HV27Z0001
The U.S. Army Corps of Engineers, Japan District (POJ) has issued a special notice under solicitation number W912HV27Z0001 to provide informational planning projections for projects scheduled for fiscal years 2027 and 2028. This notification is not a formal solicitation and does not constitute a government commitment for award. The projected scope of work includes a variety of construction, renovation, and infrastructure projects across Japan, such as the construction of a vehicle maintenance shop and aircraft intermediate maintenance facility at Kadena Air Base, family housing improvements at Yokota Air Base, and the installation of a backup power generator at Yokosuka. Project magnitudes are estimated to range from 500 million to 25 billion Japanese Yen depending on the specific requirement. Eligibility is strictly limited to local sources physically located in Japan and authorized to perform construction within the country. Prospective offerors must possess a valid Japanese civil construction or architectural construction license, verifiable through the Ministry of Land, Infrastructure, Transport and Tourism website. All interested companies and joint ventures must be registered in the System for Award Management (SAM) and utilize the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module for future bid submissions. Compliance with Department of Defense minimum antiterrorism standards and applicable Japanese laws and labor regulations is required. Points of contact for these projections include Dr. Nakiba Jackson for Army, Air Force, and Housing projects, and Mr. Ryan Marzetta for DoDEA, DLA, Navy, and Marine Corps projects.
Commercial and Institutional Building Construction

POSTED

9 days ago

DEADLINE

in 11 months
View Details
NAICS: 237120
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
Oil and Gas Pipeline and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 3 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS