Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

South Mendocino Digouts

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project focuses on asphalt concrete surfacing replacement along specific segments of Route 20 and Route 101 in Mendocino County, California, spanning from the Route 101/20 separation to 0.1 mile east of the North Calpella Overcrossing and from 0.3 mile north of Route 175 to the Crawford Creek Bridge near Hopland. All work is confined within the existing State right-of-way, with no tree removal or significant soil disturbance planned. Activities include cold planing of existing pavement, installation of new asphalt surfacing, and application of traffic striping. Equipment staging is restricted to paved surfaces and non-vegetated turnouts, and temporary signage such as Construction Area Signs and Portable Changeable Message Signs will be used with minimal environmental impact. The project encompasses all four ramps at the Route 101/20 interchange and is categorized as a maintenance activity under Caltrans standards, with no new infrastructure or expansion beyond current boundaries. The project is administratively handled by Caltrans District 1 in Eureka, with Coady Reynolds listed as the primary point of contact. It was posted as a forecast on July 25, 2025, under NAICS code 237310 for Highway, Street, and Bridge Construction, indicating it is a pre-award notice and not yet a formal contract. An environmental exemption under California Code of Regulations Title 14 Section 15304 has been certified, classifying the work as minor maintenance on existing facilities with no significant environmental impact. No contract value, pricing details, delivery schedule, or payment terms are specified, and no formal contract clauses, evaluation factors, or special requirements such as bonding, insurance, or socioeconomic set-asides are documented. The work is expected to comply with Caltrans standard specifications for pavement rehabilitation, and inspections will be conducted by Caltrans at the project sites. No offeror representations, certifications, or contractor qualifications have been disclosed, and no electronic submission system or proposal requirements are outlined in the available information.

General Info

Asphalt surfacing replacement on Route 20 and 101 in Mendocino County under Caltrans maintenance exemption.

Agency

California → Caltrans, District 1 - Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for South Mendocino Digouts Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 1 - Eureka
Office AddressN/A
Contacts
Coady ReynoldsSr. Environmental Scientist

Full Description

Show more
Maintenance is developing a project on Routes 20 and 101 in Mendocino County near Calpella from Route 101/20 separation to 0.1 mile east of North Calpella Overcrossing and near Hopland from 0.3 mile north of Route 175 to Crawford Creek Bridge. The purpose of this project is to replace asphalt concrete surfacing on these segments of highway to preserve the integrity of the roadway. Work will consist of cold planing asphalt concrete, replacing asphalt concrete surfacing, and placing traffic striping. All work will be within the existing State right of way. Project will include all four Route 101/20 ramps. Equipment staging will be confined to paved surfaces and existing non-vegetated turnouts. Construction Area Signs and Portable Changeable Message Signs will tentatively be placed with negligible soil disturbance. There will be no tree removal.

Similar Contracts

Same NAICS industry code